http://itconfidence2013.wordpress.com Software Rates vs Price of Function Points 2°International Conference on IT Data collection, Analysis and Benchmarking Tokyo (Japan) - October 22, 2014 Rafael de la Fuente Founder and CEO of LEDAmc Dácil Castelo Productivity&Estimations Area Director Raúl Fernández SW Productivity Consultant Insert here a picture An Updated Cost Analysis

Software Rates vs Price of Function Points An Updated Cost ...IT Confidence 2014 – October 22, 2014 2 Software Rates vs Price of Function Points: A cost analysis Goals of the presentation

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • http://itconfidence2013.wordpress.com

    Software Rates vs Price of Function Points

    2°International Conference on

    IT Data collection, Analysis and Benchmarking

    Tokyo (Japan) - October 22, 2014

    Rafael de la Fuente

    Founder and CEO of LEDAmc

    Dácil Castelo

    Productivity&Estimations Area

    Director

    Raúl Fernández

    SW Productivity Consultant

    Insert here a picture

    An Updated Cost Analysis

  • 2 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Software Rates vs Price of Function Points: A cost analysis

    Goals of the presentation

    Nowadays, in Software Development Contracts the key elements determining the price are: the Rate and the Effort. The possibility to measure the quantity of software produced (the size in Function Points) allows us to assess whether there is a logical connection between the price of the projects and the software actually produced.

    The main goal of this presentation is to show what happens with the FP

    price in several scenarios:

    G1. Implementing estimation models.

    G2. Implementing productivity models.

    G3. Introducing new competitors in a productivity model.

    G4. De-localizing providers.

  • 3 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    • Background

    • Objective

    • 2014 vs 2012 benchmarking

    • Case studies

    • Conclusions

    Agenda

  • 4 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Background Over the last seven years, LEDAmc has managed the productivity of more than 12,000

    development projects of 10 significant clients in Spain (mostly telecommunication and

    financial companies). They were mainly small enhancement projects.

    The main goal of the measures is to control large contracts of Adaptive Maintenances,

    which involves the highest percentage of our clients’ development budget.

    In 2012 LEDAmc developed a benchmarking study with some of these projects (we

    selected 3,405). The purpose of the study was to analyze the relationship between the

    rates of the different software providers and the price of the Function Point that they

    were offering their clients. This study was presented:

    • In the UKSMA conference in October 2012

    • An updated study, in the IT Confidence Conference in Rio, in October 2013.

  • 5 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Background The basic numbers of the 2012 sample were:

    • 10 Clients

    • 14 Providers

    • 3,405 Projects

    • 196,356 UFP

    • 2,168,192 Man Hours

    • 69,926,907 Million Euros

    And the main conclusions were:

    Pressure to lower rates ends up in lower productivity and higher FP price.

    There is not a logical relationship between Rates and FP Price.

    The performance of the providers changes dramatically among clients.

    Clients with only one development provider have the highest FP Price.

  • 6 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Background

    CLIENT-PROVIDER

    R

    A

    T

    E

    F

    P

    P

    R

    I

    C

    E

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Pressure to lower rates ends up in lower productivity and higher FP price.

  • 7 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Background

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    The same provider for different clients, offers significant differences in FP price.

    R

    A

    T

    E

    F

    P

    P

    R

    I

    C

    E

    CLIENT-PROVIDER

  • 8 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Background

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    F

    P

    P

    R

    I

    C

    E

    The price of the FP with only one provider is higher.

    CLIENT-PROVIDER

    MULTI-PROVIDER CLIENTS

    ONE-PROVIDER CLIENTS

  • 9 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Objective LEDAmc has been continuously working for most of those clients, implementing Software

    Development Productivity Models over the last two years.

    Our productivity benchmarking data base has grown: It has more data for the same

    clients and new clients have been included.

    The main goal of this presentation is to show what has happened in these two years with

    clients who have worked hard to improve their software development productivity.

    We will first explain the general evolution of the Function Point Price for those clients,

    comparing 2012 and 2014 benchmarks.

    Afterwards, we will focus on three case studies that are especially significant.

    Finally, we will draw conclusions on the economics of software management, based on

    our results.

  • 10 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    2014 vs 2012 benchmarking The 2014 sample were:

    • Clients that were in the 2012 study and have implemented some estimation or

    productivity control

    • 4 Clients

    • 12 Providers

    • 883 Projects

    • 44,897 UFP

    • 415,768 Man Hours

    • 15,428,772 Million Euros

    What has happened with the FP price?

  • 11 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    2014 vs 2012 benchmarking

    R

    A

    T

    E

    CLIENT-PROVIDER

    The rates have remained almost the same.

  • 12 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    2014 vs 2012 benchmarking

    The FP price is more homogeneous in 2014 than 2012.

    CLIENT-PROVIDER

    F

    P

    P

    R

    I

    C

    E

  • 13 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    2014 vs 2012 benchmarking

    R

    A

    T

    E

    Apparently there is no relation between FP price and rate…

    F

    P

    P

    R

    I

    C

    E

    CLIENT-PROVIDER

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    Rates vs FP Price in 2014

  • 14 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    2014 vs 2012 benchmarking

    .. but if we group the data by client, the results look different.

    CLIENT A CLIENT B CLIENT C CLIENT D

    Rates vs FP Price in 2014

    R

    A

    T

    E

    F

    P

    P

    R

    I

    C

    E

  • 15 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    2014 vs 2012 benchmarking

    There are big differences in the FP price for the same provider with different clients.

    CLIENT A CLIENT B CLIENT C CLIENT D

    R

    A

    T

    E

    F

    P

    P

    R

    I

    C

    E

    Rates vs FP Price in 2014

    P1 P1 P2 P2 P3 P3 P3

  • 16 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    2014 vs 2012 benchmarking

    Conclusions

    The results are homogeneous on a client basis because they have implemented

    estimation or productivity control models that allow them control the FP price.

    Because there is no transparency in software development and the public FP price does

    not exist in the market, the FP price stills remains very different among the clients.

    The natural differences of the systems architectures and processes should not imply

    such FP price differences.

    … now we will present some case studies highlighting the change that has been

    produced for these clients who have introduced control systems.

  • 17 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    High FP price

    Only one provider

    No estimation control

    Case Study 1 Competition among providers + Estimation Model

    INITIAL SITUATION OF THE CLIENT (2012)

  • 18 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    During 2013, the implementation of a centralized mechanism of estimation control has

    allowed to objectively contrast the costs offered by providers with corporate cost

    strategies.

    It includes functional sizing, as well as other sizing methods (for parametrization,

    technical changes, test support,..)

    Benchmarking studies helped establish a cost strategy and a target price for FP .

    Introducing a new development provider fosters competitiveness among providers and

    helps establish a FP price within market values.

    Case Study 1 Competition among providers + Estimation Model INPUTS (2013)

  • 19 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    TOTAL 1 2PROV 1 PROV 2

    INPUTS (2013)

    Case studies

    1. The rate was only

    reduced by 5%

    2. New development

    provider worked with

    a similar rate

    R

    A

    T

    E

    2 1

    Case Study 1 Competition among providers + Estimation Model

  • 20 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    TOTAL 1 2PROV 1 PROV 2

    INPUTS (2013)

    Case studies

    R

    A

    T

    E

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    TOTAL 1 2

    F

    P

    P

    R

    I

    C

    E

    The FP price was

    reduced by 44 %

    Similar FP Price

    among providers

    1. The rate was only

    reduced by 5%

    2. New development

    provider worked with

    a similar rate

    Case Study 1 Competition among providers + Estimation Model 2

    1

    PROV 1 PROV 2

  • 21 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    A good estimating process was used for all projects

    44% reduction in FP price

    More than 10 Million euros saved

    FP Price within market values

    Two competing providers in 2013 – Four in 2014

    FINAL SITUATION (2014)

    Case Study 1 Competition among providers + Estimation Model

  • 22 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Case studies

    Specialized providers

    On-site development

    High rates and very low FP price

    Estimation and productivity control implemented

    F

    P

    P

    R

    I

    C

    E

    INITIAL SITUATION OF THE CLIENT (2012)

    Case Study 2 De-localization of providers

  • 23 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    The client strategy was to proceed to the de-localization of the providers to a

    typical outsourced model introducing new development providers with lower rates.

    The client also decided to create an in-house development team in order to

    preserve and extend the know-how.

    Case Study 2 De-localization of providers INPUTS (2013)

  • 24 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4

    R

    A

    T

    E

    1. New provider with

    lower rate

    2. In-house development

    rate

    1 2

    INPUTS (2013)

    Case Study 2 De-localization of providers

    PROV 1 PROV 2 PROV 3 PROV 4

  • 25 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4

    Case studies

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4

    R

    A

    T

    E

    1. New provider with

    lower rate

    2. In-house development

    rate

    F

    P

    P

    R

    I

    C

    E

    1 2

    Logical behavior of FP

    price

    In-house developments

    at lower FP cost than

    in outsourced scenario

    INPUTS (2013)

    Case Study 2 De-localization of providers

    PROV 1 PROV 2 PROV 3 PROV 4

    PROV 1 PROV 2 PROV 3 PROV 4

  • 26 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

    Case studies Case Study 2 De-localization of providers

    FP price controlled

    Outsourcing process controlled

    2014 situation

    F

    P

    P

    R

    I

    C

    E

    FINAL SITUATION (2014)

  • 27 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Case studies

    Ratio of the rates: 1.1

    Ratio of the FP Price: 2.3 F

    P

    P

    R

    I

    C

    E

    INITIAL SITUATION OF THE CLIENT (2012)

    Case Study 3 Controlling large maintenance contracts

  • 28 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Case studies

    During 2012 the client implemented a productivity control for maintenance

    development.

    An annual productivity SLA for all the providers was established.

    The client also implemented a productivity and quality providers ranking.

    Every two months the client presented to the providers their position in the ranking.

    Case Study 3 Controlling large maintenance contracts INPUTS (2013)

  • 29 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4 5 6

    Case studies

    R

    A

    T

    E

    Renegotiation of rates

    Ratio 2012: 1.1

    Ratio 2014: 1.0

    INPUTS (2013)

    Case Study 3 Controlling large maintenance contracts

  • 30 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4 5 6

    0,00

    10,00

    20,00

    30,00

    40,00

    50,00

    60,00

    70,00

    80,00

    90,00

    100,00

    TOTAL 1 2 3 4 5 6

    Case studies

    R

    A

    T

    E

    Renegotiation of rates

    Ratio 2012: 1.1

    Ratio 2014: 1.0

    F

    P

    P

    R

    I

    C

    E

    FP cost control

    Ratio 2012: 2.3

    Ratio 2014: 1.7

    INPUTS (2013)

    Case Study 3 Controlling large maintenance contracts

  • 31 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

    Case studies Case Study 3 Controlling large maintenance contracts

    Uniformity of FP price

    9.5 million euros saved

    2014 situation

    F

    P

    P

    R

    I

    C

    E

    FINAL SITUATION (2014)

  • 32 IT Confidence 2014 – October 22, 2014 http://itconfidence2014.wordpress.com

    Conclusions

    1. It is relatively easy to influence FP price. The main levers are:

    >>> A centralized estimation control

    >>> A development productivity control

    >>> Several providers in competition

    2. Working on those key elements the results are much better than working only

    on the rates:

    >>> The behavior of the unit cost of production (FP price) is more homogeneous.

    >>> The cost of the development process can be controlled.

    3. Diversification of providers with joint management results in a better uniformity

    of the FP price.