How many lines of code?How many lines of code?
Average CS1004 assignment:• 200 lines
Average CS4115 project:• 5000 lines
Corporate e-commerce project:• 100,000 lines
Microsoft Windows Vista:• 50,000,000+ lines
Writing a program is easy– Program = code (with comments)
Developing a software system is harder– System = program plus technical documentation
sufficient such that someone other than original developers can maintain
Developing a software product is very hard– Product = system plus customers, fulfilling the
business needs of those customers, with customer-oriented documentation and support
“__________ was late, took more memory than was planned, costs were several times the estimate, and it did not perform very well until several releases after the first”
“IBM OS/360 was late, took more memory than was planned, costs were several times the estimate, and it did not perform very well until several releases after the first”
-Fred Brooks, 1975
What is What is Software EngineeringSoftware Engineering??
• NOT just programming
• NOT just programming [part of] a large software system
• NOT just programming as a member of a large team
What is What is Software EngineeringSoftware Engineering??
“The practice of creating and maintaining software applications by applying technologies and practices from engineering, computer science, project management, application domains and other fields.”
-Wikipedia
Why do software projects fail?Why do software projects fail?
Difficult to accurately estimate how long something will take
Why do software projects fail?Why do software projects fail?
Developers typically overestimate/overstate their productivity
Why do software projects fail?Why do software projects fail?
Requirements are not always clearly defined
Software development = tradeoffsSoftware development = tradeoffs
• Cost vs Scope vs Quality vs Time
• Security vs Performance
• Specialization vs Generalization
• Specificity vs Flexibility
Software EngineeringSoftware Engineering
• Processes:– Project management (resources, time, etc.)– Requirements gathering & management– Software design & architecture– Software development– Testing and quality assurance
• Tools:– Software design, development, and testing– Communication– Requirements and defect tracking– Version control
Why Why StudyStudy Software Engineering? Software Engineering?• Writing a program is easy
– Program = code (possibly with comments)
• Developing a software system is harder– System = program plus technical documentation
sufficient such that someone other than original developers can maintain, typically involving environmental interoperation (beyond just UI and file system)
• Developing a software product is very hard– Product = system plus customers, fulfilling the
business needs of those customers, with customer-oriented documentation and support
Why Why StudyStudy Software Engineering? Software Engineering?• Software Engineering aims at supporting
the development of high-quality software products– High-quality software products are more
robust, efficient and effective– High-quality software products are easier to
use, understand, modify, and compose with other high-quality software products
Software Engineering is still important!Software Engineering is still important!
• “Software Engineers” aren’t the only ones who should know about software engineering
• Creating high-quality software is necessary in any case in which you or someone else will need to maintain and/or modify your code
Software Engineering ActivitiesSoftware Engineering Activities• System Engineering• Process Selection and Training• Requirements
– Eliciting– Analysis– Recording
• Technology Selection and Training• Design
– Architecture– Components– Modules
• Coding – Unit Testing– Debugging
• Integration– Build– Integration Testing– Configuration Management
• System Testing– Performance Testing & Optimization– Acceptance Testing– Beta Testing
• Deployment– Delivery– Installation
• Operations– System Management– Maintenance– Upgrades
• Support Activities– Project Planning and Tracking– Customer Interaction– Process Improvement– Training– Documentation– Personnel Management
Discussion of Code-and-FixDiscussion of Code-and-Fix
• Really Bad• Really Common• Advantages
– No Overhead– No Expertise
• Disadvantages– No means of assessing progress– Difficult to coordinate multiple programmers
• Useful for “hacking” single-use/personal-use programs: start with empty program and debug until it works
Discussion of WaterfallDiscussion of Waterfall• Articulated by Win Royce, ~1970• Widely used today• Advantages
– Measurable progress– Experience applying steps in past projects can be used in
estimating duration of “similar” steps in future projects– Produces software artifacts that can be re-used in other projects
• The original waterfall model (as interpreted by many) disallowed iteration– Inflexible– Monolithic– Requirements change over time– Maintenance not handled well
• The “waterfall with feedback” model was, however, what Royce had in mind
Waterfall*Waterfall*REQUIREMENTS
ANALYSIS
SYSTEMDESIGN
PROGRAMDESIGN
CODING
UNIT & INTE-GRATION TESTING
SYSTEMTESTING
ACCEPTANCETESTING
OPERATION& MAINTENANCE
PrototypingPrototyping
Initial Concept
Complete and Release
Prototype
Refine Prototype Until Acceptance
Design and Implement
Initial Prototype
Discussion of PrototypingDiscussion of Prototyping• Mock-ups allow users to visualize an application that
hasn't yet been constructed• Used to help develop requirements specification
– Useful for rapidly changing requirements– Or when customer won’t commit to specification
• Once requirements “known”, waterfall (or some other process model) used
• Prototypes discarded once design begins– Prototypes should not be used as a basis for implementation,
since prototyping tools do not create production quality code– Customer (and management) may need to be “educated” about
prototypes: a prototype is not 80-90% of the final product, usually not even 10%
Incremental (Staged)Incremental (Staged)
Detailed Design, Implement, Test, Deliver Feature Set
Requirements
Validate
Retirement
Operations
Verify
Architectural Design
Discussion of IncrementalDiscussion of Incremental
• Iterations are classified according to feature sets
– e.g., features 1 and 2 will be delivered in this iteration, features 3 and 4 are next
• Series of increasingly “complete” releases
The Basic Problem: RiskThe Basic Problem: Risk
• Some modern approaches view “risk” as the main problem of software development– Schedule slips– Business changes– Staff turnovers– New technologies– …
Spiral ModelSpiral Model
PLAN DEVELOP AND TEST
DETERMINE GOALS,ALTERNATIVES,CONSTRAINTS
EVALUATE ALTERNATIVESAND RISKS
Requirements,life-cycle plan
Budget1
Alternatives1
Constraints1
Risk analysis1
Risk analysis2
Risk analysis3
Risk analysis4
Constraints2
Constraints3
Constraints4
Budget2
Budget3Budget4
Altern
atives 2
Altern
ative
s 3Altern
ative
s 4
Prototype1
Proto-type2
Proto-type3
Proto-type4
Concept ofoperation
Softw
are
requ
irem
ents
Validated
requirements
Developmentplan
Integrationand test plan
Softw
are
desig
n
Validated,
verified design
Detaileddesign
Code
Unit test
SystemtestAcceptance
testImplementation
plan
start
Discussion of Spiral ModelDiscussion of Spiral Model
• Proposed by Barry Boehm, ~1986• Similar to Incremental Model, but each
iteration is driven by “risk management” and/or customer feedback
• Determine objectives and current status• Identify risks and priorities• Next iteration addresses (current) highest
risk and/or highest priority items• Repeat
Agile ProgrammingAgile Programming
Initial Concept
Operations
Acceptance Testing
and Delivery
Requirements and Iteration
Planning
Next Iteration
Design andImplement
Discussion of AgileDiscussion of Agile
• Each iteration a mini-project– Each iteration’s deliverable is not a prototype, but an
operational system– Understand risk vs. business value in planning
iterations– Put some working functionality into user’s hands as
early as possible• Timeboxing: