23
BUILDING STRONG ® Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha District July 26-27, 2011 US Army Corps of Engineers BUILDING STRONG ®

Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

Embed Size (px)

Citation preview

Page 1: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

Society of American Military Engineers San Antonio Post, Industry Day

Dezso LinbrunnerEnvironmental Remediation BranchU.S. Army Corps of EngineersOmaha District

July 26-27, 2011

US Army Corps of Engineers

BUILDING STRONG®

Page 2: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®2

Omaha District Missions MILITARY BRANCH

• Design & Construction Management• 10 Active Air Force Installations• 2 Air Force Reserve Installations• 1 Army Installation & 1 Reserve • 3 Army Ammunition Plants• 2 Major Reserve Commands

ENVIRONMENTAL BRANCH• Environmental Remediation Work • EPA, FUDS, MMRP• More than 550 Projects Nationwide

SPECIAL PROJECTS BRANCH• DLA Fuels Program & SRM

CONUS/OCONUS• MILCON SRM• Rapid Response Nationwide

CIVIL WORKS BRANCH• Flood Protection, Navigation, Hydropower,

Water Supply, Water Quality, Recreation, Irrigation, Fish & Wildlife, Regulatory, Ecosystem Restoration, Flood Control and Coastal Emergencies (FCCE)

Page 3: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

COLORADO

WISCONSIN

IOWA

MINNESOTA

NORTHDAKOTA

SOUTHDAKOTA

MONTANA

NEBRASKA

WYOMING

Fitzsimons Medical Facility

Fort Carson

Pueblo DA

Cornhusker AAP Iowa AAP

Fort McCoyBadger

AAP

Twin Cities AAP

Military Works Boundary

US Army Facilities

US Air Force Facilities

Peterson AFBNORAD

USAF AcademyLowry AFB

F.E. Warren AFB

Minot AFBGrand Forks

AFB

Ellsworth AFB

OffuttAFB

Gen. MitchellField

Minn.-St PaulIAP

Schriever AFB

Buckley ANG

Civil Works Boundary

Regulatory Offices

Operations Projects

Omaha

Missouri R

iver

Missouri River

Musselshell River

Yellowstone River

Cheyenne R

iver

Niobrara RiverJam

es River

Platte River

Helena

Bismarck

Cheyenne

Denver

Kearney

Pierre

Omaha

Black Hills

Rocky Mountain

FortCrook

Area Offices

Regulatory

Boundary

District Mission Areas

Page 4: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®4

Omaha District Workload

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15

CW 244 197 243 240 239 147 149 151 162

MIL 640 661 591 576 212 607 404 516 458

ER 193 186 296 230 208 179 170 170 184

SP NA NA 143 220 314 282 279 288 282

$M 1077 1044 1273 1266 973 1215 1002 1125 1086

Page 5: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Environmental Remediation Branch

MacDill AFB, FL Soil Remediation Seymour Johnson AFB, NC

Well drilling at FE Warren AFB, WY, former Atlas Missile Site

Page 6: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®6

Environmental RemediationMission

Value-added environmental services to Federal agencies including: Investigations Studies Remedial Design Remedial Actions, including rapid response Long-Term Operation/Long-Term

Maintenance (LTO/LTM) Military Munitions Response Program

(MMRP) Emphasis is on remedy in place (RIP),

response complete (RC) and site closeouts.

Page 7: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®7

Omaha District Major Installations

Langley AFB (ACC)

Seymour Johnson AFB

(ACC)

Andrews AFB (AFD-W)

Legend

Omaha District Military Boundaries

Northwestern Division Boundaries

Travis AFB (AMC)

Minot AFB (ACC)

Grand Forks AFB (AMC)

Ellsworth AFB (ACC)

Offutt AFB

(ACC)F.E. Warren AFB(AFSPC)

Buckley AFB (AFSPC)

Shriever AFB (AFSPC)

USAF AcademyPeterson AFB (AFSPC)

Ft Carson

NORAD

Pueblo Depot

Ft McCoy

Badger AAP

Iowa AAP

Twin Cities AAP

Cornhusker AAP

Pope AFB (AMC)

Myrtle Beach AFB

(BRAC)

McConnell AFB

(AMC)

MacDill AFB (AMC)

Shaw AFB (ACC)

Moody AFB (AFSPC)

Holloman AFB

(ACC)Cannon AFB (ACC)

Eglin AFB

(AFMC)

Kirtland AFB

(AFMC)

Davis-Monthan AFB

(ACC)

Nellis AFB

(ACC)

Dover AFB (AMC)

Dyess AFB

(ACC)Goodfellow AFB

(AETC)

KI Sawyer AFB

(BRAC)

Mountain Home AFB

(ACC)

Maxwell AFB

(AETC)

Scott AFB

(AMC)

Vandenberg AFB

(AFSPC)

Charleston AFB (AMC)

Beale AFB (ACC)

Barksdale AFB

(ACC)

Whiteman

AFB (ACC)

Page 8: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®8

Environmental Remediation Current Workload

INSTALLATIONS STATES

ER 44 26

MMRP 106 38

ER/MMRP 122 41

RAPID RESPONSE (RR) 22 18

TOTAL ER/MMRP/RR 135 41

Page 9: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®9

~95% of environmental work is contracted out.

Primarily utilize Environmental Remediation Services (ERS) Indefinite Delivery Indefinite Quantity (IDIQ)

Emphasis on developing and utilizing small business (SB) firms.

Project Acquisition Strategy Board determines appropriate method of execution.

Regional sharing of ERS contracts within NWD.

Environmental RemediationExecution Methods

Page 10: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

U.S. Army Corps of EngineersMultiple Environmental Government Acquisition

“MEGA”An Acquisition Strategy for NWD, SWD, and SPD

Page 11: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Purpose

To present the U. S. Army Corps of Engineers, Northwestern

Southwestern

South Pacific Divisions’

$7.07B Acquisition Strategy

Multiple Environmental Government Acquisition

MEGA

11

Page 12: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

MEGA Participants The 3 USACE Divisions involved in the MEGA are:

► Northwestern Division (NWD)• Omaha• Kansas City• Seattle

► Southwestern Division (SWD)• Tulsa• Fort Worth

► South Pacific Division (SPD)• Sacramento• Albuquerque• Los Angeles

12

Page 13: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

MEGA Specifications

5 Year strategy – Based on approval of MEGA Acquisition Plan

Acquisition Strategy approved by OSD on March 27, 2011

Acquisition Plan approved by PARC on May 23, 2011

13

Page 14: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

MEGA Specifications

Total $7.07B Acquisition Strategy 95 MATOC pools (Total of 447 contracts) 27 Brooks-Act A-E contracts

A Total of 474 Contracts may be Awarded

14

Page 15: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Approved MEGA Strategy ► Environmental Remediation Services – 562910

• Nationwide $2B• NWD, SPD, SWD Regional $2B

► Military Munitions Response Program• NWD Regional $750M

► Pre-Placed Remedial Action Contracts• NWD Regional $1.5B

► A-E Services – NAICS 541330• NWD Regional $ 320M

► Environmental Consulting Services - 541620• NWD, SPD, SWD Regional $500M

15

Page 16: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Unprecedented Support of Small Business

SDVOSB$423.5 Million = 6% 68 Contracts

HUBZone$311 Million = 4% 63 Contracts

Small Business (no subcategory)$2.587 Billion = 37% 133 Contracts

Unrestricted$2.77 Billion = 39% 104 Contracts

Section 8 (a)$978.5 Million = 14% 106 Contracts

61 %

Small

Business

MEGA $7.07 Billion

16

Page 17: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Solicitations

17

All MEGA Request for Proposals (RFP) will be posted at

FedBizOpps Most solicitations will have 45 days to respond to RFP Respond to requirements of the RFP Updated Chemistry/Geology Consistency in solicitation package

Page 18: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

FY11 Solicitations

Kansas City – A-E Contract, Unrestricted ► W912DQ11R3003► ASFI Posting to FedBizOpps – 16 May 2011► Proposals due – 1 July 2011

SB ERS Nationwide w/ MMRP, $250M► W9128F-11-R-0002► ASFI Posting to FedBizOpps - Presolicitation notice 26 May 2011► Issue RFP - June timeframe ► Proposals due 45 days later

18

Page 19: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

Summary

The MEGA strategy ► Provides necessary capability to meet USACE NWD,

SWD, SPD Environmental mission requirements► Meets strategic sourcing enterprise objectives► Achieves Secretary of Defense Efficiencies Initiative

intent► Provides unprecedented opportunities for small

business► Has been approved at all levels

19

Page 20: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

MEGA Points of Contact

Linda White, PE, PMP (technical)►[email protected] ►402-995-2743

Loreen Blume (contractual)►[email protected] ►402-995-2092

Page 21: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®

MEGA Contacts Albuquerque – (C) Erica.M.Talley@

Fort Worth – (P) Mark.E.Simmons@; (C) Elizabeth.A.Crawford@

Kansas City – (C) Shelley.Thomas@

Los Angeles – (C) Patricia.B.Bonilla@

Omaha - (C) Loreen.K.Blume@; (P) Linda.J.White@ Sacramento – (P) Christopher.E.Prescott@

(C) Colette.C.Nalley@

Seattle – (P) Robert.l.Frazier@; (C) Bonnie.I.Kirmse@

Tulsa – (C) Brenda.K.Anderson@

@USACE.Army.mil (C) Contracting (P) Project Management

21

Page 22: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®22

Omaha DistrictPoints of Contact

Deputy District Engineer Ted Streckfuss402-995-2003

Chief, Environmental Remediation Randy PetersenBranch 402-995-2736

Chief, Section A Glenn Marks402-995-2286

Chief, Section B Drew Reckmeyer402-995-2764

Page 23: Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha

BUILDING STRONG®23

Questions?