South Oak Cliff Corridor Blue Line Extension
Final Local Environmental Assessment C‐1
Appendix C 5% Design Plan and Profile Drawings/
Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies are available for review at study area libraries and at DART Headquarters. An electronic PDF version is available for viewing on www.DART.org/SOC3.
South Oak Cliff Corridor Blue Line Extension
C‐2 Final Local Environmental Assessment
ADDITIONAL DESIGN INFORMATION The following information was developed after the issuance of the 5% Preliminary Engineering (PE) drawings provided with the Draft Environmental Assessment (EA). The 5% PE package is not being modified for this Final EA; however, some of the information discussed below has resulted in design refinements that are addressed in this Final EA and will be carried forward into final design. Exhibit 1 – Geothermal Wells and Police Driveway Relocation Exhibit 2 – Ledbetter Station Platform Extension and Level Boarding Modifications Concept Exhibit 3 – Ledbetter Station Architectural Site Plan Changes Exhibit 4 – Oncor Transmission Lines Crossing and Steel Pole Assessment
South Oak Cliff Corridor Blue Line Extension
Final Local Environmental Assessment C‐3
GEOTHERMAL WELLS AND POLICE DRIVEWAY RELOCATION After issuing the 5% PE drawings, DART was informed that multiple geothermal wells exist in the landscaped area on the east side of the Dallas South Central Police Station between the police station building and Patrol Way. This area is where the proposed bridge structure for the South Oak Cliff Corridor Blue Line Extension project is located. As‐built drawings showing the geothermal wells were subsequently received from the City of Dallas. The actual configuration of the geothermal wells was estimated based on coordination with engineers and contractors involved with the geothermal well installation and will need to be verified as part of additional subsurface utility investigation (SUE) during final design. The attached exhibit shows the estimated location of the geothermal wells, and also shows proposed modifications to the 5% design. The proposed design avoids the geothermal wells, and also includes relocation of the northern police station driveway in order to increase the vertical clearance over the driveway from between the 12.7‐14.7 foot clearance discussed in the Draft EA to a new clearance of 15.8 feet described in this Final EA. The second exhibit includes a cross section showing that the total structural depth of the bridge structure above the driveway can be decreased in order to provide the 15.8 foot vertical clearance at that location. Also, moving the driveway south would allow for installation of bridge piers in locations outside the anticipated geothermal well areas near the driveway.
485.5
486.2
487.5
487.5
487.6
488.2
488.3
488.4
488.5
488.6
488.7
488.8
489.1
489.3
490
490
490
490.2
490.3
490.9
491.1
491.6
491.7
492.5
492.6
492.9
494.3
495
495.5
495.7
495.8
500
502.7
505
510
513.4
514.5
515
521.6
2104
SM
H
DALLAS 8" PVC SS
DALLAS 12" PVC W
DALLAS 12" PVC W
DALLAS 8" PVC SS
SMH
FH
FH
RCP SD
DALLAS 24" DALLAS 36" RCP SD
ONCOR UGE 12.5 KV
"84 S
AL
LA
D
DS
PC
R
"4
2
SA
LL
AD
DS
PC
R
"4
2
PC
R
100’ RO
W
80’ R
OW
74+0
0
TS 75+99.2776
+00
SC 76+49.27
78+00
80+0082+00
CS 83+49.82
TS 75+95.86
76+0
0
SC 76+45.86
78+00
80+00
82+00
CS 83+55.36
À SO
C-3
SB
À SO
C-3
NB
15’-6" (T
YP)
À SOC-3 SB
À SOC-3 NB
15’-6" (T
YP)
8’-6" (T
YP)
SOC3-CC
SOC3-C
1300.00’
700.55’
1.25"
1.53"
30 MPH
Ls=
Ea=
V=
Eu=
Lc=
Rc=
(SB)SOC3-C
50.00’
PVI 77+
10.00
EL 509.66
+ 1.00%
+ 3.41%
LVC= 260’
PVI 82+
00.00
EL 526.37
LVC= 440’
493.66
493.10
492.88
495.28
494.32
493.65
492.67
492.00
491.37
491.02
491.00
512.80
514.43
516.14
517.84
519.53
521.04
522.32
523.38
524.22
524.83
525.23
ex = 0.78’
K = 108
ex = -2.15’
K = 113
EL 508.36
VP
C 75+
80.00
EL 514.09
VPT 78+
40.00
EL 518.87
VP
C 79+
80.00
16.5’
MI
N
ENTRANCE
EXISTING
DRIVEWAY
EXISTING
12.4’
CLE
AR
AN
CE
EN
D
CA
MP
WIS
DO
M ST
ATI
ON
ST
A 75+
36.64
DRIVEWAY
PROPOSED
15.8’
CLE
AR
AN
CE
1315.50’
709.50’
1.25"
1.49"
30 MPH
Ls=
Ea=
V=
Eu=
Lc=
Rc=
(NB)SOC3-CC
50.00’
DART, all rights reserved, 1987-2011c
I:\Projects\_
SO
UT
H\
GP
C 5\T
O 24 S
OC-3 PE-
EA\E
XHI
BITS\
Geo
Wells Exhibits\S
OC3-
CC1-0010b-
GE
O.040
chad_allen_
V8i
$$
MO
DEL$$
I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3-CC1-0010b-GEO.040
REV AMEND CR DATE DESCRIPTION APPCHKENGBY
CONTRACT DWG No. REV
DART PROJECTSCALE
DRAWN
DESIGNED
CHECKED
IN CHARGE
DATE
CONTRACT SHEET No.
DWG No.
11/27/2012
IN-PROGRESS
AUTHORITY OF:
FOR THE PURPOSE OF REVIEW UNDER THE
THIS DOCUMENT IS RELEASED
BIDDING, OR PERMIT PURPOSES.
IT IS NOT TO BE USED FOR CONSTRUCTION,
LINE SECTION SOC-3
LIGHT RAIL TRANSIT SYSTEM
URS CORPORATION TBPE ID #F-3162
214-741-7777
DALLAS, TEXAS 75207
SUITE 6000
1950 NORTH STEMMONS FREEWAY
PRELIMINARY ENGINEERING 5% DESIGN
NOT AN APPROVED DRAWING
AS SHOWN
C. ALLEN
P. ZHAO
78+00 79+00 80+00 81+00 82+00 83+00
VERT
SCALE (IN FEET)
SCALE (IN FEET)
HORIZ
0
0
20
5 20
8040
10 15
530
520
510
500
490
480
470
EXISTI
NG
GR
OU
ND ELE
V
PR
OP
OSE
D T/
R ELE
V
PROPOSED TOP OF RAIL
PROPOSED ROW
PROPOSED ROW
C. KESTILA/J. YEOW
540
530
520
510
500
490
480
470
540
C. KESTILA
GROUND
EXISTING
PIER CAP
INVERTED TEE
PIER OFFSET FROM CENTER OF BRIDGE
(SEE NOTE 4)
STATION
POLICE
CENTRAL
SOUTH
DALLAS
27 NOV 12
75+00 76+00 77+00
509.96
507.54
501.59
498.90
497.33
494.83
507.56
508.06
508.58
509.29
510.23
511.40
URS CORPORATION TBPE ID #F-3162
ON 11/27/2012
CHAD ANTHONY ALLEN, P.E. NO. 88427
FIRE HYDRANT
RELOCATE
OF BRIDGE (SEE NOTE 4)
PIER OFFSET FROM CENTER
DRIVEWAY
RELOCATE
STA 75+00.00 TO STA 83+00.00
GUIDEWAY PLAN AND PROFILE
EXHIBIT 1 OF 2:
GEOTHERMAL WELL
BEAM
TX28
ADJACENT TO PATROL WAY.
PROPOSED BRIDGE PIERS
AS REQUIRED IN AREA OF
RELOCATE 12" WATER LINE
CURB INLET
CONSTRUCT NEW
LOCATIONS HAVE BEEN MORE ACCURATELY DETERMINED.
SOME OF THE GEOTHERMAL WELLS AFTER THEIR
AND THE CITY OF DALLAS MAY DECIDE TO RELOCATE
BRIDGE PIERS MAY NEED TO BE ADJUSTED, OR DART
PROJECT. THE LOCATIONS OF SOME OF THE PROPOSED
TO ISSUING FINAL CONSTRUCTION PLANS FOR THE
VICINITY OF THE PROPOSED BRIDGE PIERS PRIOR
THE LOCATIONS OF THE GEOTHERMAL WELLS IN THE
THE FINAL DESIGN TEAM SHALL FIELD VERIFY THE
RECORD DRAWINGS PROVIDED BY THE CITY OF DALLAS.
ON THIS SHEET ARE APPROXIMATE AND ARE BASED ON
5. THE LOCATIONS OF THE GEOTHERMAL WELLS SHOWN
AROUND THE PIER.
WILL NEED TO BE RECONSTRUCTED AND REROUTED
THE EXISTING SIDEWALK AT EACH PIER LOCATION
IS REQUIRED PER CITY OF DALLAS CRITERIA.
DESIGNER TO DETERMINE IF CRASH PROTECTION
ADJACENT TO PROPOSED BRIDGE PIERS. FINAL
4. CRASH PROTECTION MAY BE REQUIRED FOR ROAD
DESIGN PROCESS.
REQUIRED PRIOR TO COMPLETION OF THE FINAL
CITY OF DALLAS AND DART ABOUT THIS ISSUE IS
PROPERTY. ADDITIONAL COORDINATION WITH THE
ROAD AT THE WEST SIDE OF THE POLICE STATION
ACCESS MAY NEED TO BE PROVIDED FROM CAMP WISDOM
IF THE DRIVEWAY IS REMOVED, REPLACEMENT
CLOSED AND DEMOLISHED AS PART OF THE PROJECT.
THE DRIVEWAY OPEN, OR THE DRIVEWAY MAY BE
DART AND THE CITY OF DALLAS AGREE TO LEAVE
REQUIRED DURING THE FINAL DESIGN EFFORT IF
STATION. A DART DESIGN EXCEPTION WILL BE
CONNECTION TO THE DALLAS SOUTH CENTRAL POLICE
NOT BEING PROVIDED OVER THE NORTHERN DRIVEWAY
FEET ACCORDING TO DART DESIGN CRITERIA IS
3. MINIMUM REQUIRED VERTICAL CLEARANCE OF 16.5
PROJECT.
OTHER SITE IMPROVEMENTS AFFECTED BY THIS
REPLACEMENT PARKING SPACES, DRIVE AISLES AND
DETERMINE THE LOCATION AND CONFIGURATION OF
FURTHER WITH THE CITY OF DALLAS AND DART TO
CONSTRUCTION. FINAL DESIGNER MUST COORDINATE
SUBSTATION MUST BE MITIGATED PRIOR TO
2. LOSS OF PARKING SPACES AT THE DALLAS POLICE
1. SEE DWG. No. CC1-0001 FOR ADDITIONAL NOTES.
NOTE:
(SEE NOTE 5)
WELL (TYP.)
GEOTHERMAL
EXISTING
WELL (TYP.) (SEE NOTE 5)
EXISTING GEOTHERMAL
SOC3-CC1-0010b-GEO.040 11/27/2012 5:01:29 PM
�" = 1’-0"
I. HWANG
C. KESTILA
C. KESTILA
C. ALLEN
1 TYPICAL SECTIONSCALE: �"=1’-0"
2 SCALE: �"=1’-0"
ELEVATION
À BRIDGE
MI
N
8"
40:1 40:140:1 40:1
LOW RAIL
TOP OF
POINT
LOW POINT
HIGH
DECK
EDGE OF DECK
EDGE OF
POINT
LOW
(TYP)
LEVEL
(TYP)
DRIP GROOVEPEJ
HANDRAIL
(TYP)
CONCRETE
TRACK10"
3’-6"
CABLE TROUGHPOLE, NIC
CATENARY
HAND RAIL, TYP
BE
ARI
NG
3"
@ À
10"
PGL
MI
N
1’-0"
FINISHED GRADE FINISHED GRADE
6’-0"
À PIER À PIER
DIA
DRILLED SHAFT
DIA
DRILLED SHAFT
6’-0" min.
6’-6" min.
6’-0" min.
6’-6" min.
TX28 I-GIRDER (TYP)
TEXAS DOT
À SB TRACKÀ NB TRACK
33’-2"
4’-3" 4’-3" 4’-3" 4’-3"8’-8"
MI
N
1’-0"
STA 78+38.50 TO STA 78+93.43
STA 58+96.00 TO STA 59+70.00
4’-10" APPROX.
6’-6"
3’-0"
URS CORPORATION TBPE ID #F-3162
ON 11/27/2012
B.W. ISAAC HWANG, P.E. NO. 59161
27 NOV 12 TYPICAL SECTION 3
TEXAS DOT TX28 I-BEAM
EXHIBIT 2 OF 2:
GEOTHERMAL WELL
DART, all rights reserved, 1987-2011c
I:\Projects\_
SO
UT
H\
GP
C 5\T
O 24 S
OC-3 PE-
EA\E
XHI
BITS\
Geo
Wells Exhibits\S
OC3S
X03-
GE
O.008
chad_allen_
V8i
$$
MO
DEL$$
I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3SX03-GEO.008
REV AMEND CR DATE DESCRIPTION APPCHKENGBY
CONTRACT DWG No. REV
DART PROJECTSCALE
DRAWN
DESIGNED
CHECKED
IN CHARGE
DATE
CONTRACT SHEET No.
DWG No.
11/27/2012
IN-PROGRESS
AUTHORITY OF:
FOR THE PURPOSE OF REVIEW UNDER THE
THIS DOCUMENT IS RELEASED
BIDDING, OR PERMIT PURPOSES.
IT IS NOT TO BE USED FOR CONSTRUCTION,
LINE SECTION SOC-3
LIGHT RAIL TRANSIT SYSTEM
URS CORPORATION TBPE ID #F-3162
214-741-7777
DALLAS, TEXAS 75207
SUITE 6000
1950 NORTH STEMMONS FREEWAY
PRELIMINARY ENGINEERING 5% DESIGN
NOT AN APPROVED DRAWING
SOC3SX03-GEO.008 11/27/2012 3:54:17 PM
South Oak Cliff Corridor Blue Line Extension
C‐6 Final Local Environmental Assessment
LEDBETTER STATION PLATFORM EXTENSION AND LEVEL BOARDING MODIFICATIONS CONCEPT
The anticipated extension and level boarding improvements at Ledbetter Station have been modified since the issuance of the 5% PE drawings for the project. A study is being conducted of existing platforms on the DART Red and Blue Lines in order to provide consistency with future extension and level boarding modifications throughout the LRT system. As part of the study, the plans for Ledbetter Station have been revised to incorporate a proposed canopy in the extension area and a shortened ramp length on the north end of the existing platform. The attached concept drawing shows these improvements relative to the existing conditions at the platform.
South Oak Cliff Corridor Blue Line Extension
C‐8 Final Local Environmental Assessment
LEDBETTER STATION ARCHITECTURAL SITE PLAN CHANGES
Additional coordination has been performed with TxDOT about the Ledbetter Station site improvements currently shown in the 5% PE drawings for the project. It was determined that the previously proposed northbound left turn lane into the proposed kiss & ride area from Lancaster Road was too short and did not meet TxDOT design criteria. As a result, a new location for the kiss & ride area has been developed in coordination with TxDOT. The kiss & ride area is now envisioned to be located between Shellhorse Street and 56th Street. Kiss & ride vehicles would enter at Shellhorse Street, drop‐off on a lane parallel to the bus lane, and exit south of 56th Street. A revised architectural site plan is attached to show the new improvements.
www.kaitexas.com
F. 214.742.0401
T. 214.742.0400
Dallas, TX 75270
Suite 5240
1201 Elm Street
TBPE REGISTRATION No. F-9010
c DART, all rights reserved, 2012-2014
R
LEDBETTER SITE STUDY
DATE
SCALE
DRAWN
DESIGNED
CHECKED
IN CHARGE
G. BRINGAS
V. SADR
J. LIBURY
D. JAMES
AS SHOWNDART PROJECT
URS CORPORATION ID #3162
214-741-7777
DALLAS, TEXAS 75207
SUITE 6000
1950 NORTH STEMMONS FREEWAY
BLUE LINE EXTENSION PE/EA
SOUTH OAK CLIFF 3
LANCASTER ROAD
LANCASTER ROAD
RAMP UP
RAMP UP
UP
UP
UP
UP
KISS AND RIDE
UP
TRACK
"ABOVE 2115
TRACK
"ABOVE 2115
TRACK
"ABOVE 2115
TRACK
8"ABOVE
TYP
GUARDRAIL,
TYP
GUARDRAIL,
SIDEWALK
4.8%SLOPED
22’ WIDE
SIDEWALK
4.8% SLOPED
22’ WIDE
SIDEWALK
4.8% SLOPED
22’ WIDE
LA
NDS
CAPE
NE
W
PLANTERS
NEW
PLATFORM
STEPS TO RAISED
PLATFORM
STEPS TO RAISED
REVISED
SITE LAYOUT STUDY
LEDBETTER STATION
26 NOV 12
PLATFORM
LEVEL BOARDING
GUARD RAIL
SIG
NA
L
TR
AFFIC
SIG
NA
L
TR
AFFIC
SIGNAL
TRAFFIC
UP
UP
PLANTERS
NEW
TRACK
"ABOVE2115
BUSES ONLY
ONLYONLY
ONLY
South Oak Cliff Corridor Blue Line Extension
C‐10 Final Local Environmental Assessment
ONCOR TRANSMISSION LINES CROSSING AND STEEL POLE ASSESSMENT
Additional coordination was conducted with Oncor about the proposed crossing under the transmission lines south of Camp Wisdom Road near Runyon Springs Branch Creek. Oncor has analyzed the crossing and has provided the attached drawing showing the steel pole modifications anticipated to be required as part of this project. Oncor currently believes it will be necessary to raise three nearby steel poles in order to provide the vertical clearance required over the proposed South Oak Cliff Corridor Blue Line Extension tracks. This includes the poles immediately adjacent to and on either side of the rail crossing and one additional pole to the east. All wires between the three poles and between these poles and the two adjacent outside poles will be required to be adjusted and raised. This assessment is based on the track profile currently shown in the 5% PE drawings that were issued with the Draft EA. The possible lowering of the track profile to reduce the extent of pole modification has not yet been assessed and was not considered at the time. Final design efforts may examine lowering the profile to minimize pole and wire modifications.
CONDUCTOR SHOT
32.0
’
90
’ S
TE
EL
PO
LE
95
’ S
TE
EL
PO
LE
85
’ S
TE
EL
PO
LE
364’
392’
403’
418’