PARKING LOTS AND SIDEWALKS (SICOPS)
Liping Fu, PhD, P.Eng
Professor
Civil and Environmental Engineering
Snow and Ice Conference and Expos, Landscape Ontario
Sept 20, 2012,
2
www.civil.uwaterloo.ca/itss
3
iTSS Lab
RSC Monitoring and
Forecasting
Treatment
Evaluation
Maintenance Optimization
Traffic
Management
Benefit & Performance
Measurements
4
THE SICOPS PROJECT
Goal: Develop guidelines for snow
and ice control of parking lots and
sidewalks
4
5 PARTNERS
5 Several contractors …
6
PROJECT PROGRESS
Year 0 (2010/11):
Prep
Year 1
(2011/12):
Test on Solid Salt
Year 2 (2012/13):
Test on Liquid and Solid
Year 3:
(2012/13):
Organic materials
6
7
RESEARCH APPROACH
7
I. Survey of Practice
II. Theory of Deicing/Anti-
icing
III. UW Micro Testing
V. Model Calibration
VI. Guidelines
IV. Field Observation
SURVEY OF CURRENT PRACTICE
Part I:
9
SURVEY RESULTS: SURVEY RESPONSE
100 Complete Responses
9
10
SURVEY RESULTS: APPLICATION RATES
10
0%
10%
20%
30%
40%
0-5 5-10 10-20 20-30 30-40 40-50 50-60 60-70 70 +
Fre
qu
en
cy
(%)
Application Rate (lbs/1000 sq feet)
Heavy Light
OPTIMUM APPLICATION RATE:
THE MODEL
Part II:
12
THEORY: FACTORS ON MELTING SPEED…
12
Melting Speed
Dilution
Traffic
Sky View
Pavement
Temp Trend
13
THEORY: OTHER FACTORS …
13
Optimal
Rate
Spreading
Method
Circuit
Time Residual
Salt
UW MICRO TESTING
Part III:
15
MICRO TESTING: TEST SITE
15 University of Waterloo Parking Lot C
16
MICRO TESTING: PROCEDURE
16
Observe Initial
Conditions
Event Starts
Maintenance
Observations
End of Event
Observations until
Pare Pavement Measuring Friction
Measuring Pavement Temperature
Weighing Salt to be Spread
Spreading Salt Manually
17
MICRO TESTING: DATA COLLECTION
17
Weather
Condition
Pavement
Temp
Snow
Cover
Residual
Salt
Friction
Level
18
-25
-20
-15
-10
-5
0
5
10
15
Experiment Days
Snow Fall (cm)
Minimum Temp
Maximum Temp
MICRO TESTING: SNOW EVENTS (2011/2012)
18
RESULTS
ANALYSIS OF EFFECTS OF DIFFERENT
FACTORS
Melting
Performance Rate
Temperature
Traffic Parking
Material
Snow Type
19
RESULTS - EFFECT ANALYSIS
EFFECT OF APPLICATION RATE
0
1
2
3
4
5
6
7
8
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Re
ga
in T
ime
(h
r)
Rate (lbs/1000sft)
T (-10.08)
T (-8.9)
T (-8.2)
T (-6.98)
T (-4.67)
T (-4.85)
T (-5.10)
T (-3.33)
T (-6.17)
T (-0.75)
T (-3)
T (+2.4)
20
RESULTS - EFFECT ANALYSIS
EFFECT OF PAVEMENT TEMPERATURE
0
1
2
3
4
5
6
7
8
9
0 5 10 15 20 25
Re
ga
in T
ime
(h
r)
Application Rate (lbs/1000sft)
>-3C
-4C~-6C
-7C~-10C
<-10C
21
0
1
2
3
4
5
6
0 5 10 15 20
Re
ga
in T
ime
(h
r)
Rates (lbs/1000sft)
T (-4.5)
T (-10.3) (VL)
T (-7.61), (PC)
T (-3.92)
T (-6.33)
T (+2.3)
T (-3)
RESULTS - EFFECT ANALYSIS
EFFECT OF TRAFFIC WITH TRAFFIC
22
RESULTS - EFFECT ANALYSIS
EFFECT OF TRAFFIC WITHOUT TRAFFIC
0
1
2
3
4
5
6
7
8
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Re
ga
in T
ime
(h
r)
Rate (lbs/1000sft)
T (-10.08)
T (-8.9)
T (-8.2)
T (-6.98)
T (-4.67)
T (-4.85)
T (-5.10)
T (-3.33)
T (-6.17)
T (-0.75)
T (-3)
T (+2.4)
23
0
2
4
6
-12 -9 -6 -3 0
Re
ga
in T
ime
(h
r)
Temperature
Salt (5 to
8lbs/1000sft)
Sand-Salt Mix
(10
lbs/1000sft)
(50:50)
BP Regain Time:
Salt vs. Salt-Sand Mix
24
DATA COLLECTION AT EXTERNAL SITES
Part IV:
26
26
I T I S C H A L L E N G I N G B U T F U N . , ,
27
27 www.sicops.ca