1. INTRODUCTION:
This document relates tdocument. The major coapparently does not suproposed by the Business
It is quite clear that duringnetwork, the Engineeringstage, it was based on asdemands. Hence by definaccurate at the stage of s
2. THE ENGINEERING PL
The engineering plan presurvey that was well-knengineering plan presentwere checked in depth.
In the Tender Documentataken in regard to the exeavailability of the "Lapidquantitative) solution to awas presented and entmentioned previously. Itthat "the subject will be di
The basic postulates ofconservative and took intconditions into the distriaccepted flow velocitiesbased on the worst gassupplied by Israeli suppliensure an increased gas
up to 87,162 Sm3/hr or e
The consequence of thethe Tender would permit
eering Opinion Regarding the ClaimLetter Dated 14/11/2010inmmittee
o the engineering issues raised in thecern is the discrepancy between the Engiport the prediction of 1BCM per year iPlan.
the time of preparation of the Tender for tPlan is assumed to be a conceptual de
sumptions derived from a survey with theition from an engineering point of view, thebmission of the Tender.
N IN THE TENDER DOCUMENT
sented in the Tender documents was basown at the time of the preparation ofd was the preferred alternative between
tion at the end of Section 1.1.1 "Design",cution of the proposed network over a 5-yot" PRMS. The assumptions proposedpossible problem. The principle of the
ailed the implementation of one of theas evident that they are more expensivecussed separately with the Manager, if ne
the engineering plan presented in theo consideration an extremely poor gas qubution network, low pressure drops andin distribution networks were assumed.ualities presented by INGL. It is known thrs is better and in the future will be evenflow from 77,682 Sm3/hr as written in the
en 99,506 Sm3/hr as described in Section
e assumptions is that the distribution netas flows in excess of those shown in the c
7/12/2010
of the
above-mentionedineering Plan thatin 25 years time
he NG distributionsign only. At thisstimations for NGdesign cannot be
d on a consumerthe Tender. The
alternatives that
ssumptions werear period and the
a qualitative (notualitative solutionsix alternatives,
and it was statedessary".
Tender are verylity. Inferior entrythe low end of
he calculation isat the gas qualityhigher, which willEngineering Plan
3 & 5 later.
ork presented innsumer survey.
8/8/2019 Sngs Pofessional Opinion
2/21
Page 2 of21
3. COMENTS to the CHECKING of the ENGINEERING PLAN by GL CONSULTANT
In the documents of the Tender Committee it is written that the grid of Ashdod areahas been sent to an expert from GL as a test case, distinct from the whole grid of theSouthern District. The combination of isolating Ashdod together with the method bywhich the design data have been transferred to GL, created a distortion in the GL
expert's professional opinion and lead him to a wrong conclusion, as described below.The GL expert's conclusion is that it is impossible to transfer the 64,000 Sm3/hr basedon the fact the Ashdod local PRS will not operate, i.e. the system will see an upperpressure lower than 7.5 barg. We claim this is an incorrect finding as the local PRS willoperate only during the initial stage and later, when the consumption will reach themaximum, it will be either 100% open during its natural aspiration to compensate thedownstream pressure, or it will be by-passed.
Regarding the calculation, the process team carried out the Ashdod PRMS (ASD1) -local PRS (ASD8) section simulation by Aspen Plus (see Appendix D), which isconsidered to be the most accurate way to evaluate the compressible flows.
The following are the inherent assumptions:
1) The gas consumption was evaluated based on the future heat demand forecastbased on the lowest HHV reported by INGL (see Appendix C) as 0.0346MMBTU/Sm3. The 64,000 Sm3/hr is equivalent to 64,000 x 0.0346 = 2214.4MMBTU/hr.
2) Two extreme cases were checked:a) The lower gas quality (92 vol. % CH4) featuring 0.78 kg/Sm3 gas density. (SeeAppendix A)b) The higher gas quality (100% CH4) (see Appendix B), as was simulated in
PIPENET. During simulation the Joule-Thomson gas cooling effect was consideredin both cases assuming an adiabatic process (soil has poor thermal conductivityand the pipe flow can be approximated as adiabatic). As can be seen, both casestransfer 2214.4 MMBTU/hr and are both feasible.
3) The 40,000 Sm3/hr case for the lower quality gas (the worst hydraulic case) isattached as well and shows the necessity of the local PRS as the ASD8 pressure ishigher than 7.5 barg. Hence the conclusion, made by GL's expert, that the max flowwill be around 27,000 Sm3/hr is wrong.
Furthermore, as the original customers' gas demand forecast at the end of the 1stoperation decade was estimated at 77,700 Sm3/hr, the proposed network delivers the
60,595 kg/hr of pure CH4 at the temperature of 38o
C that actually is equivalent to:a) 60,595 kg/hr / 0.675 kg/Sm3 (100% CH4, 101325 Pa and 15oC) =89,770 Sm3/hr of
100% CH4. The gas temperature decrease to 15oC has a potential to increase thiscapacity to 89,770 x (273.15+38K)/(273.15+15K) = 96,936 Sm3/hr of pure CH4.
b) 60,595 kg/hr x 0.526 MMBTU/kg/[0.03460.0395 MMBTU/Sm3 taken from INGL]= [80,71992,150] Sm3/hr. As in the item (a), the gas temperature decrease to15oC has a potential to increase this capacity to[80,71992,150] x (273.15+38K)/ (273.15+15K) = [87,16299,506] Sm3/hr
8/8/2019 Sngs Pofessional Opinion
3/21
Page 3 of21
Considering the average annual operating hours as 7,650 hours / year, the proposednetwork can transfer 7,650 hr/year x [87,16299,506] Sm3/hr = [0.6670.761] BCMof gas annually.
Considering the higher Gas Quality, releasing the velocity limit from 20 m/s to 40 m/sand the lowest end-user pressure from 2 barg to 250 mbarg, the network actualcapacity will be even higher.
4. COMMENTS TO INGL's LETTER RELATED to the PRMSs
The tariff for PRMS with the capacity of 40,000 Sm3/hr, which is mentioned in INGL'sletter, amounts to MNIS 10 while the present tariff is MNIS 8.9 and very similar to thevalue which is presented in the Tender documentation as (M$ 2.38 x 3.75 )= MNIS8.925.
According the price breakdown for the design, purchasing and construction of PRMS,
as published on the NGA's internet web, this price includes all the additional costs thatare mentioned in INGL's letter. Hence the additional amount of MNIS 11-12, as writtenin paragraph 2 of that letter, is not clear and seems unnecessary.
It is correct that the PRMS for the distribution network, should be designed andordered from the beginning for the largest capacity, while in practice, during the firstperiod of operation it will be partially erected.
Only in the last few months has the characterization of PRMS for the distributionnetwork become clear to all parties in the Natural Gas market. However, the effects oncost considerations are relatively small.
5. COMPATIBILITY BETWEEN BUSINESS & ENGINEERING PLANS
In the afore-mentioned letter from the Tender Committee it was assumed that thegrowth of the demands would be uniform for all the sub-regions. Because of thisincorrect assumption a demand of 64,000 Sm3/hr has been taken for the Ashdod sub-region.
The growth of the demands is a function of the industrial development of a region. It ismore realistic than that because of many reasons, such as governmentalencouragement policy which will ensure that the industrial development ofundeveloped area will be more rapid than the established areas. Hence we canassume with reasonable certainty that the development rate of Ashdod will be more
moderate compared to the other regions.
For example, flow rate of 40,000 Sm3/hr in Ashdod reflects an annual demand of 0.3BCM after 25 years, which corresponds to a total growth of about 150% above theannual demand after 10 years, as had been calculated in the Engineering plan of theTender. Those figures are very reasonable for a well-developed area and are basedon assumptions which are not less reliable than the others.
8/8/2019 Sngs Pofessional Opinion
4/21
Page 4 of21
In the letter of Super NG South dated 5/10/2010 to the Tender Committee, it wasstated that the accumulative flow rate would be 130,870 Sm3/hr for all the 5 sub-regions connected to 4 PRMSs.
As mentioned in section 2 above, the hydraulic calculations presented for thedistribution system are very conservative, based on low quality NG at 380C and withinlet pressure of 2 barg into the yard of the furthest end users from the PRMS.
The hydraulic calculations of the same pipe network but based on high quality NG,pure CH4 at 15oC, corresponding to the 0.676 kg/Sm3 standard density, withreference conditions of 101325 Pa, 15.5555oC (60oF) and with inlet pressure of500mbarg to the same end users, gives the following results:
PRMS-Ashdod: can deliver 40,000 Sm3/hr NG without any piping changes. PRMS-Ashkelon: can deliver 10,870 Sm3/hr NG without any piping changes. PRMS-Lapidot: can deliver 40,000 Sm3/hr NG but with increasing the diameter
of 3.3 km piping from 150mm to 200mm. (One commercial size)
PRMS-Qiryat Gat: can deliver 40,000 Sm3/hr NG but with increasing the diameterof 5 km piping from 200mm to 250mm. (One commercial size)
All the data for the above information is presented in the attached PDF file which is theoutput of the PIPNET Appendix E.
The total additional cost of the above changes in the piping is NIS 567,000. Thisbudgetary deviation of ~0.5% is negligible and can be compensated by thecontingency. It should be remembered that the distribution system cost estimationsbased on conceptual design only. It is very common that during the detailed designthere are large changes in the sizes of the pipes. Changing one commercial size in 8.3km out of about 158 km in total is trivial and acceptable.
8/8/2019 Sngs Pofessional Opinion
5/21
Page 5 of21
APPENDIX A
8/8/2019 Sngs Pofessional Opinion
6/21
Page 6 of21
Low Quality NG
1 2 4 5 6 7 8 11 13 ASD1 ASD8
P2 ASD7 ASD32 P3 P1
ASD32 ASD32 ASD32 P2 P1 ASD7 ASD7 ASD7 ASD32 P3
VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR
Substream: MIXED
Mole Frac
C1 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
C2 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
C3 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
I-C4 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03
N-C4 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03 5.00E-03
I-C5 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
N-C5 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03 1.36E-03
N-C6 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03
N-C7 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05
N-C8 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05
N-C9 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05
N-C10 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05 1.00E-05
CO2 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266 0.0266
N2 0 0 0 0 0 0 0 0 0 0 0
H2O 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03 1.00E-03Mass Frac
C1 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568 0.798568
C2 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539 0.032539
C3 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859 0.023859
I-C4 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724
N-C4 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724 0.015724
I-C5 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038 0.039038
N-C5 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03 5.31E-03
N-C6 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03 4.66E-03
N-C7 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05 5.42E-05
N-C8 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05 6.18E-05
N-C9 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05 6.94E-05
N-C10 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05 7.70E-05
CO2 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334 0.06334
N2 0 0 0 0 0 0 0 0 0 0 0
H2O 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04 9.75E-04
Total Flow kmol/hr 59.13779 88.03035 1284.612 1284.612 2470.452 142.2445 113.3519 1029.016 1038.672 2470.452 1029.016
Total Flow kg/hr 1093 1627 23742.54 23742.54 45659.54 2629 2095 19018.54 19197 45659.54 19018.54Total Flow cum/hr 129.8874 193.3456 2821.46 4679.749 5425.98 518.1865 412.9329 3748.63 2281.288 3299.714 5331.818
Temperature C 10.99287 10.99287 10.99287 8.426937 10.99287 8.426937 8.426937 8.426937 10.99287 15 7.244853
Pressure barg 9.386808 9.386808 9.386808 5.280341 9.386808 5.280341 5.280341 5.280341 9.386808 16 3.419572
Vapor Frac 1 1 1 1 1 1 1 1 1 1 1
Liquid Frac 0 0 0 0 0 0 0 0 0 0 0
Solid Frac 0 0 0 0 0 0 0 0 0 0 0
Enthalpy kJ/kmol -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9 -85982.9
Enthalpy kJ/kg -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18 -4652.18
Enthalpy kW -1412.46 -2102.53 -30681.9 -30681.9 -59004.6 -3397.39 -2707.31 -24577.2 -24807.8 -59004.6 -24577.2
Entropy kJ/kmol-K -108.211 -108.211 -108.211 -104.145 -108.211 -104.145 -104.145 -104.145 -108.211 -112.132 -101.282
Entropy kJ/kg-K -5.85485 -5.85485 -5.85485 -5.63487 -5.85485 -5.63487 -5.63487 -5.63487 -5.85485 -6.06702 -5.47997
Density kmol/cum 0.455301 0.455301 0.455301 0.274505 0.455301 0.274505 0.274505 0.274505 0.455301 0.748687 0.192995
Density kg/cum 8.414984 8.414984 8.414984 5.073463 8.414984 5.073463 5.073463 5.073463 8.414984 13.83742 3.566989
Average MW 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226 18.48226
Liq Vol 60F cum/hr 3.296862 4.907589 71.61561 71.61561 137.7248 7.929963 6.319237 57.36641 57.90472 137.7248 57.36641
*** ALL PHASES ***
QVALGRS MMBtu/lb 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998 0.021998
QVALNET MMBtu/lb 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884 0.019884
Total Flow ncmh 1325.491 1973.078 28792.8 28792.8 55371.75 3188.213 2540.626 23063.96 23280.38 55371.75 23063.96
*** VAPOR PHASE ***
ZMX 0.966882 0.966882 0.966882 0.97932 0.966882 0.97932 0.97932 0.97932 0.966882 0.948509 0.985227
CPCVMX 1.326914 1.326914 1.326914 1.311627 1.326914 1.311627 1.311627 1.311627 1.326914 1.35157 1.304726
Density kg/cum 8.414984 8.414984 8.414984 5.073463 8.414984 5.073463 5.073463 5.073463 8.414984 13.83742 3.566989
MUMX cP 0.010859 0.010859 0.010859 0.0107 0.010859 0.0107 0.0107 0.0107 0.010859 0.011122 0.010628
CPMX kJ/kg-K 2.103173 2.103173 2.103173 2.066787 2.103173 2.066787 2.066787 2.066787 2.103173 2.162197 2.050405
KMX Watt/m-K 0.030162 0.030162 0.030162 0.029819 0.030162 0.029819 0.029819 0.029819 0.030162 0.030701 0.029661
TDEW C -4.39013 -4.39013 -4.39013 -10.4094 -4.39012 -10.4094 -10.4094 -10.4094 -4.39013 1.157764 -14.6077
THYDRATE C 0.103431 0.103431 0.103431 -7.63493 0.103431 -7.63493 -7.63493 -7.63493 0.103431 4.380542 -19.8053
8/8/2019 Sngs Pofessional Opinion
7/21
Page 7 of21
APPENDIX B
8/8/2019 Sngs Pofessional Opinion
8/21
Page 8 of21
High Quality NG
1 2 4 5 6 7 8 11 13 ASD1 ASD8
P2 ASD7 ASD32 P3 P1
ASD32 ASD32 ASD32 P2 P1 ASD7 ASD7 ASD7 ASD32 P3
VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR VAPOR
Substream: MIXED
Mole Frac
C1 1 1 1 1 1 1 1 1 1 1 1
C2 0 0 0 0 0 0 0 0 0 0 0
C3 0 0 0 0 0 0 0 0 0 0 0
I-C4 0 0 0 0 0 0 0 0 0 0 0
N-C4 0 0 0 0 0 0 0 0 0 0 0
I-C5 0 0 0 0 0 0 0 0 0 0 0
N-C5 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
N-C6 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
N-C7 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
N-C8 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
N-C9 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
N-C10 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
CO2 0 0 0 0 0 0 0 0 0 0 0
N2 0 0 0 0 0 0 0 0 0 0 0
H2O 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00Mass Frac
C1 1 1 1 1 1 1 1 1 1 1 1
C2 0 0 0 0 0 0 0 0 0 0 0
C3 0 0 0 0 0 0 0 0 0 0 0
I-C4 0 0 0 0 0 0 0 0 0 0 0
N-C4 0 0 0 0 0 0 0 0 0 0 0
I-C5 0 0 0 0 0 0 0 0 0 0 0
N-C5 0 0 0 0 0 0 0 0 0 0 0
N-C6 0 0 0 0 0 0 0 0 0 0 0
N-C7 0 0 0 0 0 0 0 0 0 0 0
N-C8 0 0 0 0 0 0 0 0 0 0 0
N-C9 0 0 0 0 0 0 0 0 0 0 0
N-C10 0 0 0 0 0 0 0 0 0 0 0
CO2 0 0 0 0 0 0 0 0 0 0 0
N2 0 0 0 0 0 0 0 0 0 0 0
H2O 0 0 0 0 0 0 0 0 0 0 0
Total Flow kmol/hr 68.13042 101.4165 1257.097 1257.097 2623.258 163.8745 130.5885 962.6339 1196.615 2623.258 962.6339
Total Flow kg/hr 1093 1627 20167.3 20167.3 42084.3 2629 2095 15443.3 19197 42084.3 15443.3Total Flow cum/hr 149.6156 222.7123 2760.607 4007.136 5760.722 522.3683 416.2653 3068.502 2627.787 3541.919 3650.304
Temperature C 11.53665 11.53665 11.53665 9.761019 11.53665 9.761019 9.761019 9.761019 11.53665 15 9.125069
Pressure barg 9.477722 9.477722 9.477722 6.22677 9.477722 6.22677 6.22677 6.22677 9. 477722 16 5.076836
Vapor Frac 1 1 1 1 1 1 1 1 1 1 1
Liquid Frac 0 0 0 0 0 0 0 0 0 0 0
Solid Frac 0 0 0 0 0 0 0 0 0 0 0
Enthalpy kJ/kmol -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4 -75202.4
Enthalpy kJ/kg -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62 -4687.62
Enthalpy kW -1423.21 -2118.54 -26260.2 -26260.2 -54798.7 -3423.26 -2727.93 -20109 -24996.7 -54798.7 -20109
Entropy kJ/kmol-K -102.166 -102.166 -102.166 -99.1515 -102.166 -99.1515 -99.1515 -99.1515 -102.166 -106.051 -97.7385
Entropy kJ/kg-K -6.36833 -6.36833 -6.36833 -6.18045 -6.36833 -6.18045 -6.18045 -6.18045 -6.36833 -6.61051 -6.09237
Density kmol /cum 0.45537 0.45537 0.45537 0.313715 0.45537 0.313715 0.313715 0.313715 0.45537 0.740632 0.263713
Density kg/cum 7.305388 7.305388 7.305388 5.032848 7.305388 5.032848 5.032848 5.032848 7.305388 11.88178 4.23069
Average MW 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276 16.04276
Liq Vol 60F cum/hr 3.648915 5.431643 67.32735 67.32735 140.4959 8.77676 6.994033 51.55655 64.08804 140.4959 51.55655
*** ALL PHASES ***
QVALGRS MMBtu/lb 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867 0.023867
QVALNET MMBtu/lb 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509 0.021509
Total F low ncmh 1527.049 2273.109 28176.08 28176.08 58796.7 3673.021 2926.96 21576.1 26820.45 58796.7 21576.1
*** VAPOR PHASE ***
ZMX 0.973324 0.973324 0.973324 0.981133 0.973324 0.981133 0.981133 0.981133 0.973324 0.958824 0.983992
CPCVMX 1.346726 1.346726 1.346726 1.33593 1.346726 1.33593 1.33593 1.33593 1.346726 1.368221 1.332104
Density kg/cum 7.305388 7.305388 7.305388 5.032848 7.305388 5.032848 5.032848 5.032848 7.305388 11.88178 4.23069
MUMX cP 0.010917 0.010917 0.010917 0.010807 0.010917 0.010807 0.010807 0.010807 0.010917 0.01114 0.010768
CPMX kJ/kg-K 2.267308 2.267308 2.267308 2.240945 2.267308 2.240945 2.240945 2.240945 2.267308 2.320166 2.231628
KMX Watt/m-K 0.032309 0.032309 0.032309 0.032064 0.032309 0.032064 0.032064 0.032064 0.032309 0.032788 0.031977
TDEW C -123.186 -123.186 -123.186 -130.965 -123.186 -130.965 -130.965 -130.965 -123.186 -111.757 -134.331
THYDRATE C -3.15 -3.15 -3.15 -3.15 -3.15 -3.15 -3.15 -3.15 -3.15 -3.15 -19.6319
8/8/2019 Sngs Pofessional Opinion
9/21
Page 9 of21
APPENDIX C
8/8/2019 Sngs Pofessional Opinion
10/21
Page 10 of21
8/8/2019 Sngs Pofessional Opinion
11/21
Page 11 of21
8/8/2019 Sngs Pofessional Opinion
12/21
Page 12 of21
8/8/2019 Sngs Pofessional Opinion
13/21
Page 13 of21
APPENDIX D
8/8/2019 Sngs Pofessional Opinion
14/21
Page 14 of21
40,000 Sm3/hr Low Quality NG
8/8/2019 Sngs Pofessional Opinion
15/21
Page 15 of21
64,000 Sm3/hr Low Quality NG
8/8/2019 Sngs Pofessional Opinion
16/21
Page 16 of21
64,000 Sm3/hr High Quality NG
8/8/2019 Sngs Pofessional Opinion
17/21
Page 17 of21
APPENDIX E
8/8/2019 Sngs Pofessional Opinion
18/21
Page 18 of21
8/8/2019 Sngs Pofessional Opinion
19/21
Page 19 of21
8/8/2019 Sngs Pofessional Opinion
20/21
Page 20 of21
8/8/2019 Sngs Pofessional Opinion
21/21