SNAGGING REPORT OF APROPERTY
Tuesday, 27 March 2018
Prepared For A Client
68 Snag Identified
Inspected By An InspectorSnag My Property
SNAG 1Assigned To SiteDoor require clean off and make good all marks
SNAG 2Door frame inner side chip
SNAG 3Inner main door frame chip
SNAG 4Lounge walls on entrance require finish
11:13 27/03/201811:13 27/03/2018
11:14 27/03/201811:14 27/03/2018
11:14 27/03/201811:14 27/03/2018
11:18 27/03/201811:18 27/03/2018
Page 2 of 18
SNAG 5Dents to entrance wall
SNAG 6Entrance wall chips
SNAG 7Floor and skirting require finish
SNAG 8Kick boards needed
11:19 27/03/201811:19 27/03/2018
11:19 27/03/201811:19 27/03/2018
11:21 27/03/201811:21 27/03/2018
11:21 27/03/201811:21 27/03/2018
Page 3 of 18
SNAG 9Kitchen no plug
SNAG 10Cracked to back
SNAG 11Base under sink marked require attention
SNAG 12Marks to edge of hob metal
11:22 27/03/201811:22 27/03/2018
11:22 27/03/201811:22 27/03/2018
11:24 27/03/201811:24 27/03/2018
11:26 27/03/201811:26 27/03/2018
Page 4 of 18
SNAG 13Extractor fan pulls well
SNAG 14Master bedroom door chip
SNAG 15Master bed door chip to return
SNAG 16Master bed window many chips
11:28 27/03/201811:28 27/03/2018
11:29 27/03/201811:29 27/03/2018
11:30 27/03/201811:30 27/03/2018
11:31 27/03/201811:31 27/03/2018
Page 5 of 18
SNAG 17Master window frame dented
SNAG 18Master window unable to open wide lock requireadjustment
SNAG 19Master window frame base all heavily marked
SNAG 20Master frame marked high level
11:31 27/03/201811:31 27/03/2018
11:32 27/03/201811:32 27/03/2018
11:33 27/03/201811:33 27/03/2018
11:34 27/03/201811:34 27/03/2018
Page 6 of 18
SNAG 21Dent to master floor
SNAG 22Position of dent to master bed
SNAG 23MasterFloor edge required
SNAG 24Master Clean out wardrobe
11:34 27/03/201811:34 27/03/2018
11:35 27/03/201811:35 27/03/2018
11:36 27/03/201811:36 27/03/2018
11:37 27/03/201811:37 27/03/2018
Page 7 of 18
SNAG 25Master Carpet in wardrobe poor fit
SNAG 26Boiler cupboard in master bedSurround marks require make good
SNAG 27Boiler cupboard in master require screw cap
SNAG 28Tape loose to boiler covers
11:37 27/03/201811:37 27/03/2018
11:38 27/03/201811:38 27/03/2018
11:39 27/03/201811:39 27/03/2018
11:40 27/03/201811:40 27/03/2018
Page 8 of 18
SNAG 29Boiler cupboard snots and chips to paint
SNAG 30Boiler cupboard marks dents and chips to walls requireattention
SNAG 31Boiler wall dent rhs
SNAG 32Boiler cupboard require finish
11:41 27/03/201811:41 27/03/2018
11:41 27/03/201811:41 27/03/2018
11:42 27/03/201811:42 27/03/2018
11:43 27/03/201811:43 27/03/2018
Page 9 of 18
SNAG 33Ensuite light switches chips
SNAG 34Ensuite thermostat require paint
SNAG 35Outside ensuite marks low rhs
SNAG 36No cold feed to ensuite
11:43 27/03/201811:43 27/03/2018
11:44 27/03/201811:44 27/03/2018
11:44 27/03/201811:44 27/03/2018
11:46 27/03/201811:46 27/03/2018
Page 10 of 18
SNAG 37Ensuite Require finish
SNAG 38Ensuite Cupboard require paint in/out
SNAG 39Ensuite Under sink require paint
SNAG 40Ensuite Loose fixing to wall
11:46 27/03/201811:46 27/03/2018
11:47 27/03/201811:47 27/03/2018
11:48 27/03/201811:48 27/03/2018
11:48 27/03/201811:48 27/03/2018
Page 11 of 18
SNAG 41Ensuite
No heat to radiator
SNAG 42Ensuite radiator fuse poor paint
SNAG 43Main bathroom switches paint required
SNAG 44Main bathroom door require paint
11:49 27/03/201811:49 27/03/2018
11:50 27/03/201811:50 27/03/2018
11:54 27/03/201811:54 27/03/2018
11:55 27/03/201811:55 27/03/2018
Page 12 of 18
SNAG 45Main bathroom glue near threshold
SNAG 46Main bathroom Require finish to under sink cupboard in/out
SNAG 47Main bathroom require finish and remove pads
SNAG 48Main bathroom Chip base of bath
11:56 27/03/201811:56 27/03/2018
11:57 27/03/201811:57 27/03/2018
11:58 27/03/201811:58 27/03/2018
11:59 27/03/201811:59 27/03/2018
Page 13 of 18
SNAG 49Main bathroom chip
SNAG 50Main bathroom clean off marks
SNAG 51Main bathroom sealant required attention corner of bath
SNAG 52Bed 2Door not fully closing
11:59 27/03/201811:59 27/03/2018
12:00 27/03/201812:00 27/03/2018
12:01 27/03/201812:01 27/03/2018
12:02 27/03/201812:02 27/03/2018
Page 14 of 18
SNAG 53Bed 2 threshold paint
SNAG 54Bed 2 chips to window frame
SNAG 55Bed 2 marks to frame
SNAG 56Bed 2 frame marks
12:02 27/03/201812:02 27/03/2018
12:03 27/03/201812:03 27/03/2018
12:04 27/03/201812:04 27/03/2018
12:04 27/03/201812:04 27/03/2018
Page 15 of 18
SNAG 57Bed 2 frame require attention
SNAG 58Lounge require finish
SNAG 59Chip over lounge patio door
SNAG 60Patio door heavily chipped
12:05 27/03/201812:05 27/03/2018
12:07 27/03/201812:07 27/03/2018
12:08 27/03/201812:08 27/03/2018
12:09 27/03/201812:09 27/03/2018
Page 16 of 18
SNAG 61Patio doorGeneral marks require attention
SNAG 62Patio all require finishing
SNAG 63Chips to patio rails
SNAG 64Patio require finishing
12:10 27/03/201812:10 27/03/2018
12:10 27/03/201812:10 27/03/2018
12:11 27/03/201812:11 27/03/2018
12:11 27/03/201812:11 27/03/2018
Page 17 of 18
SNAG 65Patio scratched to surrounds
SNAG 66Further scratchesPlease make good all areas in/out
SNAG 67Patio lifting to floor
SNAG 68All sockets working
12:12 27/03/201812:12 27/03/2018
12:13 27/03/201812:13 27/03/2018
12:14 27/03/201812:14 27/03/2018
12:17 27/03/201812:17 27/03/2018
Page 18 of 18