    M IN RO DS

    Western Australia

    Revision Register

    EXAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES

    template for SOR/BQ p reparat ion.)

    REVISION REGISTER

    Date Item Number Description of Revision Authorised By

    10-Jul-12 Whole document Complete Review SCO

    3-May-11 302.1 Amended duplicate numbering for 302.10 A/MPCMP

    12-Aug-09 503.08 Geotextile Reinforced Seal added PSM

    502 Stone Mastic Asphalt has been added A/SCO

    504 Reference to Polymer Modified Binder added

    30-Jan-08 References to 'Particular Preambles' amendedto 'Contract Specific Preambles'

    MPCMP

    02-Feb-07 204.07 Unit corrected from 'Item' to 'No.' SO

    28-Sep-06 General Items -Series 100 Section numbers added and Item numberingamended SO

    07-Sep-06 General "Revision Register" created SOGeneral Some section/specification titles updatedFurther

    ExamplesNote added

    Author's Notes Reference to "Particular Preambles" added

    (For Information o nly - Delete this sheet & table from Spreadsheet if i t is to be used as a

    24-Apr-09

    ]

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    2/63

    MAIN ROADSWestern Australia

    Contents

    EXAMPLE OF FORMAT AND LAYOUT

    SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES

    CONTRACT No. ??/??

    SCHEDULES OF RATES/BILLS OF QUANTITIES

    CONTENTS

    THIS PAGE - CONTENTS 1

    SCHEDULE No. 1 - GENERAL ITEMS 2

    SCHEDULE No. 2 - ROADWORKS 6

    SERIES 300 - EARTHWORKS 7

    SERIES 400 - DRAINAGE 10

    SERIES 500 - PAVEMENT & SURFACING 14

    SERIES 600 - TRAFFIC FACILITIES 17

    SERIES 700 - ELECTRICAL & LIGHTING 20

    SERIES 900 - MISCELLANEOUS 22

    SCHEDULE No. 3 - PROVISIONAL SUMS 24

    SCHEDULE No. 4 - DAYWORK 26

    BILL No. 1 - BRIDGE No. ? OVER ? 28

    SERIES 800 - BRIDGES & MAJOR STRUCTURES 29

    SUMMARY 39

    FURTHER EXAMPLES 41

    AUTHOR'S NOTES 43

    REVISION REGISTER 45

    Contract No. ??/?? Page 2

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    3/63

    MAIN ROADS

    Western Australia

    Summary

    SUMMARY

    Contract No. ??/?? Page 3

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    4/63

    MAIN ROADSWestern Australia

    Summary

    EXAMPLE OF FORMAT AND LAYOUT

    SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES

    CONTRACT No. ??/??

    SUMMARY

    SCHEDULE No. 1 - GENERAL ITEMS $0.00

    SCHEDULE No. 2 - ROADWORKS

    SERIES 300 - EARTHWORKS $0.00

    SERIES 400 - DRAINAGE $0.00

    SERIES 500 - PAVEMENT & SURFACING $0.00

    SERIES 600 - TRAFFIC FACILITIES $0.00

    SERIES 700 - ELECTRICAL & LIGHTING $0.00

    SERIES 900 - MISCELLANEOUS $0.00 $0.00

    SCHEDULE No. 3 - PROVISIONAL SUMS $0.00

    SCHEDULE No. 4 - DAYWORK $0.00

    BILL No. 1 - BRIDGE No. ? OVER ? $0.00

    SERIES 800 BRIDGES & MAJOR STRUCTURES $0.00

    GST EXCLUSIVE AMOUNT $0.00

    ESTIMATED GST PAYABLE $0.00

    TOTAL OF TENDER $0.00

    Contract No. ??/?? Page 4

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    5/63

    MAIN ROADSWestern Australia

    General Items

    SCHEDULE No. 1 - GENERAL ITEMS

    Contract No. ??/?? Page 5

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    6/63

    MAIN ROADSWestern Australia

    General Items

    Item Description Unit Qty Rate Amount

    CONDITIONS OF CONTRACT

    GCC GENERAL CONDITIONS OF CONTRACT

    GCC.01 Insurances in accordance with the General

    Conditions of ContractItem 1

    GCC.02 Contractor's superintendence during the execution ofthe Works

    Item 1

    GCC.03 All charges, costs and obligations relating to theGeneral Conditions of Contract not provided forelsewhere

    Item 1

    SPECIAL CONDITIONS OF CONTRACT

    SCC.01 All charges, costs and obligations relating to theSpecial Conditions of Contract not provided for

    elsewhere

    Item 1

    SERIES 100 - GENERAL REQUIREMENTS

    101.00 DESCRIPTION OF WORKS

    101.01 Provision of access for others to undertake work Item 1

    101.02 Contractors programs Item 1

    101.03 Project works sign No.

    102 SURVEY INFORMATION

    102.01 Survey information, control and setting out of theworks

    Item 1

    103 SITE FACILITIES

    Contractors Site Facilities

    103.01 Provision of Contractor's site facilities Item 1

    103.02 Maintenance of Contractor's site facilities Item 1

    103.03 Removal of Contractor's site facilities Item 1

    Superintendent's Site Facilities

    103.04 Provision of the Superintendent site facilities Item 1

    103.05 Maintenance of the Superintendent site facilities Item 1

    103.06 Removal of the Superintendent site facilities Item 1

    Superintendent's Living Facilities

    103.07 Provision of the Superintendent living facilities Item 1

    103.08 Maintenance of the Superintendent living facilities Item 1

    Contract No. ??/?? Page 6

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    7/63

    MAIN ROADSWestern Australia

    General Items

    Item Description Unit Qty Rate Amount

    103.09 Removal of the Superintendent living facilities Item 1

    103.10 Superintendent's meals M/day

    104 ENTRY TO LAND

    104.01 Entry to land Item 1

    105 WATER SUPPLIES

    105.01 Supply of water Item 1

    106 UTILITIES AND SERVICES

    106.01 Liaison, programming, location and protection ofutilities and services

    Item 1

    106.02 Relocation of ? mains Item 1

    106.03 Relocation of existing street lighting Item 1

    SERIES 200 - MANAGEMENT REQUIREMENTS

    202 - TRAFFIC

    202.01 Traffic management Item 1

    202.02 Traffic control devices Item 1

    202.03Traffic controllers

    Item 1

    202.04 Construction, maintenance and removal ofsidetracks, temporary driving surfaces and temporarypedestrian access

    Item 1

    202.05 Maintenance of existing roads Item 1

    203 - OCCUPATIONAL SAFETY AND HEALTH

    203.01 Occupational safety and health including safety plansand safety audits

    Item 1

    204 - ENVIRONMENT

    204.01 Protection, preservation and monitoring of Aboriginalsites

    Item 1

    204.02 Protection of flora and fauna Item 1

    204.03 Fire prevention Item 1

    204.04 Waste disposal Item 1

    204.05 Dieback control Item 1

    Contract No. ??/?? Page 7

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    8/63

    MAIN ROADSWestern Australia

    General Items

    Item Description Unit Qty Rate Amount

    204.06 Protection of public and property Item 1

    204.07 Pre-construction property inspections No. 1

    204.08 Dust control Item 1

    To Summary

    Contract No. ??/?? Page 8

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    9/63

    MAIN ROADSWestern Australia

    Roadworks

    SCHEDULE No. 2 - ROADWORKS

    Contract No. ??/?? Page 9

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    10/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    SERIES 300 - EARTHWORKS

    301 - CLEARING

    301.01 Site clearing ha,m

    302 - EARTHWORKS

    TOPSOILINGTopsoil Removal

    302.01 Topsoil removal, ? deep ha,m

    302.02 Topsoil removal, ? deep, and disposal of to Contractor'sspoil area off-site

    ha,m

    Topsoil Spreading

    302.03 Respread topsoil, ? thick ha,m

    Topsoil Stockpiles

    302.04 Batter protection to stockpiles using hydro-mulch ha,m

    REMOVAL OF REDUNDANT ITEMS302.05 Removal of redundant pavement including seal m

    302.06 Removal of redundant seal from existing pavement m

    302.07 Ripping and rehabilitating redundant pavement m

    302.08 Preparation of retained pavement to receive overlay m

    302.09 Removal of redundant kerbs m

    302.10 Marking out and cutting edge along junction between newpavement and existing pavement including trimmingexisting pavement layers as required to bond to newpavement

    m

    UNSUITABLE MATERIAL

    302.11 Excavation and removal of unsuitable material m

    302.12 Backfilling unsuitable material excavations with site

    excavated material or imported materialm

    EXCAVATION IN ROCK

    302.13 Excavation and removal of rock m

    EMBANKMENT CONSTRUCTION

    302.14 Embankment foundation compaction m

    302.15 Embankment foundation compaction in widenings m

    302.16 Embankment construction using site excavated materialand imported material

    m

    Contract No. ??/?? Page 10

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    11/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    302.17 Embankment construction in widenings using siteexcavated material and borrow material

    m

    302.18 Embankment construction for noise bunds using siteexcavated material

    m

    SUBGRADE

    302.19 Subgrade improvement ? thick using select borrowmaterial

    m

    302.20 Subgrade m

    302.21 Subgrade in road widenings m

    302.22 Subgrade to principal shared path m

    303 - PITS AND QUARRIES

    EMBANKMENT MATERIAL BORROW PITS303.01 Establishment of embankment material borrow pits Item 1

    303.02 Reinstatement of embankment material borrow pits Item 1

    EXISTING PAVEMENT MATERIAL BORROW PITS

    303.03 Reinstatement of existing pavement material borrow pits Item 1

    304 - REVEGETATION AND LANDSCAPING

    304.01 Seed collection hr

    304.02 Transplanting ? Plants No.

    304.03 Herbicide treatment ha,m

    304.04 Ground preparation ha,m

    304.05 Erosion control netting type? ha,m

    304.06 Imported topsoil, ? thick ha,m

    304.07 Seed mixture type ? ha,m

    304.08 Seed mixture type ? by hydro-seeding ha,m

    304.09 Grass turf ha,m

    304.10 Grass stolons planted at the rate of ?m of turf to cover?m of ground

    ha,m

    304.11 Grass seeding planted at the rate of ?m of seed to ?mof ground

    ha,m

    304.12 Plants type? No.

    304.13 Mulch, ? thick, in plant beds ha,m

    Contract No. ??/?? Page 11

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    12/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    304.14 Hydro-mulch, ? thick ha,m

    304.15 Tree grates No.

    304.16 Reinstate existing verges including landscaped areas,

    irrigation, etc.

    Item 1

    304.17 Irrigation system installed complete including connectionto scheme water supply

    Item 1

    304.18 Establishment of vegetation wk

    To Summary

    Contract No. ??/?? Page 12

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    13/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    SERIES 400 - DRAINAGE

    401- NOT USED

    402 - SURFACE DRAINS AND LEVEES

    SURFACE DRAINS AND LEVEES

    402.01 Drain type ? m

    402.02 Drain type ? and parallel levee m

    402.03 Culvert outlet drain type ?, not exceeding ?m wide atbase

    m

    402.04 Levee, not exceeding ? high m

    402.05 Extra over surface drains for excavation in rock m

    402.06 Table drain block No.

    402.07 Reinforced concrete check structure type ? No.

    SPOON DRAINS

    402.08 Spoon drain type ?, size ? x ? m

    DRAINAGE BASINS

    402.09 Drainage basin at Cha. ? (Approx. cut volume ? m) No.

    403 - SUBSOIL DRAINS

    403.01 ? Diameter slotted PVC pipe subsoil drain including filteraggregate, geotextile lining and drainage layer

    m

    403.02 Cleanout/flushout point to ? diameter pipe subsoil drainincluding concrete cover and removable cap

    No.

    404 - CULVERTS

    CULVERTSReinforced Concrete Pipes Class ?

    404.01 ? Diameter pipe culvert m

    Corrugated Steel Pipes

    404.02? Diameter pipe culvert

    m

    Reinforced Concrete Box Sections

    404.03 ? x ? Box culvert m

    All Culverts

    404.04 Selected bedding material m

    404.05 Extra over culverts for cement stabilised backfill m

    404.06 Reinforced concrete base slab and shear keys m

    Contract No. ??/?? Page 13

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    14/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    404.07 Reinforced concrete insitu end treatment m

    404.08 Extra over culverts for excavation in rock m

    404.09 Precast concrete end treatment to suit ? diameter pipe No.

    Redundant Culverts

    404.10 Removal of existing ? diameter pipe culvert andbackfilling excavations

    m

    404.11 Removal of existing ? diameter pipe culvert (Nobackfilling - culvert replaced)

    m

    404.12 Removal of existing ? x ? box culvert and backfillingexcavations

    m

    404.13 Removal of existing ? x ? box culvert (No backfilling -culvert replaced)

    m

    404.14 Extra over removal of existing ? diameter pipe culvert fordelivering salvageable pipes to Main Roads depot at ?

    m

    404.15 Removal of existing culvert end treatment (All sizes) No.

    STORMWATER DRAINSReinforced Concrete Pipes Class ?

    404.16 ? Diameter drain in trench, depth not exceeding 1.5m m

    404.17 ? Diameter drain in trench, depth exceeding 1.5m but notexceeding 2.5m

    m

    404.18 ? Diameter drain in trench, depth exceeding 2.5m but notexceeding 3.5m

    m

    404.19 ? Diameter drain in trench, depth exceeding 3.5m but notexceeding 4.5m

    m

    All Stormwater Drains

    404.20 Extra over stormwater drains for cement stabilised backfill m

    404.21 Extra over stormwater drains for excavation in rock m

    Redundant Stormwater Drains

    404.22 Removal of existing ? diameter pipe drain and backfilling

    excavations

    m

    404.23 Extra over removal of existing ? diameter pipe drain fordelivering salvageable pipes to Main Roads depot at ?

    m

    405 - DRAINAGE STRUCTURES

    MANHOLES

    405.01 Manhole type ? No.

    GULLIES

    Contract No. ??/?? Page 14

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    15/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    405.02 Gully type ? No.

    405.03 Gully type ? with silt trap No.

    CATCHPITS

    405.04 Catchpit type ? No.

    ALTERATIONS TO EXISTING DRAINAGE STRUCTURES405.05 Breaking into existing drainage structure and building-in ?

    diameter pipeNo.

    405.06 Breaking into existing drainage structure, building-in ?diameter pipe and alteration of structure and cover to suitnew finished level

    No.

    405.07 Alteration of structure and cover to suit new finished level No.

    405.08 Replacement of existing non-trafficable cover withtrafficable cover type ? No.

    REDUNDANT DRAINAGE STRUCTURES

    405.09 Removal of existing drainage structure No.

    406 - ROCK PROTECTION

    406.01 ? Rock protection to embankments m

    406.02 ? Grouted rock protection to embankments m

    406.03 ? Limestone spalls m

    406.04 Rock Mattresses m

    406.05 Gabions m

    406.06 Geotextile Lining m

    407 - KERBING

    407.01 Kerb type ? m

    407.02 Temporary kerb type ? m

    407.03 Kerb opening type ? No.

    407.04 Extra over kerbs for pedestrian ramp type ? No.

    407.05 Extra over kerbs for driveway kerb m

    408 - REVETMENT MATTRESS

    408.01 ? Thick revetment mattress m

    408.02 Extra over ? revetment mattress for footing includingexcavation

    m

    Contract No. ??/?? Page 15

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    16/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    409- NOT USED

    410 - LOW STRENGTH INFILL

    REDUNDANT STORMWATER DRAINS410.01 Filling of existing redundant ? diameter pipe, box or duct

    drains with low strength infillm

    REDUNDANT DRAINAGE STRUCTURES

    410.02 Filling of existing redundant ? drainage structure with lowstrength infill

    No.

    To Summary

    Contract No. ??/?? Page 16

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    17/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    SERIES 500 - PAVEMENT & SURFACING

    501 - PAVEMENTS

    DRAINAGE LAYER

    501.01 ? Geotextile lining laid over subgrade m

    501.02 ?mm Thick sand drainage layer m

    SUBBASE

    501.03 ?mm Thick subbase m

    501.04 ?mm Thick subbase in widenings m

    501.05 Varying thickness subbase overlay m

    501.06 Final trimming of varying thickness subbase overlay m

    Material Supplied By Principal Free Of Charge From Stockpiles501.07 ?mm Thick gravel subbase m

    501.08 ?mm Thick gravel subbase in widenings m

    501.09 Varying thickness gravel subbase overlay m

    501.10 Final trimming of varying thickness gravel subbaseoverlay

    m

    BASECOURSE

    501.12 ?mm Thick basecourse m

    501.13 ?mm Thick basecourse inwidenings

    m

    501.14 Varying thickness basecourseoverlay

    m

    501.15 Final trimming of varying thickness basecourse overlay m

    Material Supplied By Principal Free Of Charge From Stockpiles501.16 ?mm Thick gravel basecourse m

    501.17 ?mm thick gravel basecourse in widenings m

    501.18 Varying thickness gravel basecourse overlay m

    501.19 Final trimming of varying thickness gravel basecourseoverlay

    m

    PAVEMENT STABILISATION

    501.20 Extra over gravel pavement for cement stabilisation, ?deep

    m

    501.21 Extra over gravel pavement in widenings for cementstabilisation, ? deep

    m

    Contract No. ??/?? Page 17

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    18/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    501.22 Extra over gravel pavement for lime stabilisation, ? deep m

    501.23 Extra over gravel pavement in widenings for limestabilisation, ? deep

    m

    PRINCIPAL SHARED PATH

    501.24 ?mm Thick basecourse m

    Material Supplied By Principal Free Of Charge From Stockpiles501.25 ?mm Thick gravel basecourse m

    502 - STONE MASTIC ASPHALT

    ROADWORKS

    502.01 Tack coat m

    502.02 ?mm Thick stone mastic asphalt m

    502.03 ?mm Thick stone mastic asphalt with Polymer ModifiedBinder (PMB)

    m

    502.04 Varying thickness stone mastic asphalt t

    502.05 Varying thickness stone mastic asphalt with PMB t

    503 - BITUMINOUS SURFACING

    ROADWORKSPrime

    503.01 Prime coat with BAR of ? litres/m m

    Primerseal

    503.02 First coat primerseal with BAR of ? litres/m and ?mmaggregate

    m

    503.03 Second coat primerseal with BAR of ? litres/m and ?mmaggregate

    m

    503.04 Single coat primerseal with BAR of ? litres/m and ?mmaggregate

    m

    Seal

    503.05 First coat seal with BAR of ? litres/m and ?mmaggregate

    m

    503.06 Second coat seal with BAR of ? litres/m and ?mmaggregate

    m

    503.07 Single coat seal with BAR of ? litres/m and ?mmaggregate

    m

    Geotextile Reinforced Seal (GRS)

    503.08 Single coat GRS with BAR of ? litres/m and ?mmaggregate

    m

    Contract No. ??/?? Page 18

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    19/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    503.09 First coat GRS with BAR of ? litres/m and ?mmaggregate

    m

    503.10 Second coat GRS with BAR of ? litres/m and ?mmaggregate

    m

    BRIDGEWORKSPrime

    503.11 Prime coat with BAR of ? litres/m m

    Seal

    503.12 Single coat rubberised seal with BAR of ? litres/m and?mm aggregate

    m

    PRINCIPAL SHARED PATH

    503.13 Prime coat with BAR of ? litres/m m

    Primerseal

    503.14 Single coat primerseal with BAR of ? litres/m and ?mmaggregate m

    504 - ASPHALT SURFACING

    ROADWORKS

    504.01 Tack coat m

    504.02 ?mm Thick dense graded asphalt m

    504.03 ?mm Thick dense graded asphalt with PMB m

    504.04 ?mm Thick dense graded coloured asphalt m

    504.05 Varying thickness dense graded asphalt t

    504.06 Varying thickness dense graded asphalt with PMB t

    504.07 ?mm Thick open graded asphalt m

    504.08 ?mm Thick open graded asphalt with PMB m

    504.09 Varying thickness open graded asphalt t

    504.10 Varying thickness open graded asphalt with PMB t

    BRIDGEWORKS

    504.11 Tack coat m

    504.12 ?mm dense graded asphalt on bridge deck m

    PRINCIPAL SHARED PATHS

    504.13 Tack coat m

    504.14 ?mm Thick dense graded coloured asphalt m

    Contract No. ??/?? Page 19

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    20/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    505 - SEGMENTAL PAVING

    PRINCIPAL SHARED PATHS

    505.01 ?mm x ?mm Brick paving units on and including ?mmsand bedding

    m

    505.02 Tactile ground surface indicators m

    MEDIANS AND TRAFFIC ISLANDS

    505.03 ?mm x ?mm Brick paving units on and including ?mmsand bedding

    m

    505.04 Removal of existing concrete slab paving, storage andrelaying including ?mm sand bedding

    m

    508 - COLD PLANING

    508.01 Cold planing of ?mm asphalt m

    509 - POLYMER MODIFIED BITUMINOUS SURFACING

    ROADWORKSSeal

    509.01 Single coat PMB seal with BAR of ? litres/m and ?mmaggregate

    m

    To Summary

    SERIES 600 - TRAFFIC FACILITIES

    601 - SIGNS

    SINGLE POST SIGNS

    601.01 Traffic sign ? (Stop) No.601.02 Not used

    DOUBLE POST SIGNS

    601.03 Traffic sign ? (Hazard board) No.

    MAJOR SIGNS

    601.04 Major sign ?, size ?m x ?m No.

    REMOVAL OF EXISTING SIGNS

    601.05 Single post sign No.

    601.06 Double post sign No.

    601.07 Major sign No.

    RELOCATION OF EXISTING SIGNS

    601.08 Single post sign No.

    601.09 Double post sign No.

    Contract No. ??/?? Page 20

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    21/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    601.10 Major sign No.

    REPLACEMENT OF EXISTING SIGN COMPONENTS

    601.11 Post type ? No.

    601.12 Sign panel type ? No.

    602 - GUIDE POSTS

    602.01 Guide post No.

    602.02 Guide post with footing cast into concrete edge wall No.

    602.03 Guide post (supplied by Principal free of charge fromMain Roads depot at ?)

    No.

    602.04 Removal of existing guide post No.

    602.05 Relocation of existing guide post No.

    603 - ROAD SAFETY BARRIER SYSTEMS

    BARRIER

    603.01 Galvanised W-Beam barrier m

    603.02 Galvanised Thriebeam barrier m

    603.03 Galvanised Thriebeam/W-Beam transition No.

    603.04 Galvanised modified eccentric loader terminal (MELT) No.

    WIRE ROPE ROAD SAFETY BARRIER SYSTEM

    603.05 Wire rope road safety barrier system complete m

    603.06 Anchor block to wire rope road safety barrier No.

    REDUNDANT ROAD SAFETY BARRIER SYSTEM603.07 Removal of redundant W-Beam guardrail m

    INSITU CONCRETE BARRIER

    603.08 Cast insitu concrete barrier complete m

    603.09 Transition treatment between instu concrete barrier and

    W-Beam barrierNo.

    603.10 Insitu concrete end treatment No.

    604 - PAVEMENT MARKING

    ROAD PAVEMENT MARKINGS

    604.01 Line type ? m

    604.02 Gore/Diagonal marking type ? m

    604.03 ? Turn arrow No.

    604.04 Removal of redundant road pavement markings m

    Contract No. ??/?? Page 21

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    22/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    RAISED PAVEMENT MARKERS

    604.05 Raised pavement marker type ? No.

    604.06 Temporary raised pavement markers No.

    604.07 Removal of redundant raised pavement marker No.

    605 - GRAB RAILS AND BOLLARDS

    GRAB RAILS

    605.01 ? Wide x ? diameter pipe grab rail type ? No.

    605.02 Removal of redundant grab rail No.

    605.03 Relocation of existing grab rail No.

    BOLLARDS

    605.04 ? Diameter bollard type ? No.

    605.05 Removal of redundant bollard No.

    605.06 Relocation of existing bollard No.

    To Summary

    Contract No. ??/?? Page 22

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    23/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    SERIES 700 - ELECTRICAL & LIGHTING

    701 - ROADWAY LIGHTING

    LIGHTING POLES

    701.01 Concrete base for single outreach arm pole No.

    701.02 Galvanised steel light pole (Type ?) ?m high overallcomplete with ?m outreach arm

    No.

    701.03 Roadway lighting luminaire fixed to lighting pole outreacharm

    No.

    SWITCHBOARDS

    701.04 Switchboard No. ? No.

    CONDUITS AND CABLING

    Conduits701.05 ? Diameter heavy duty PVC conduit in trench m

    701.06 Extra over conduit in trench for excavation in rock m

    701.07 Extra over conduit in trench for directional drilling underexisting roadway

    m

    701.08 Cable pit type ? No.

    Cabling

    701.09 ? Core ?mm diameter cabling between Switchboard No.? and lighting poles

    m

    701.10 ? Core ?mm diameter cabling between circuit cabling andluminaire

    m

    701.11 Connection to consumer mains Item 1

    702 - EMERGENCY ROADSIDE TELEPHONES

    702.01 Emergency roadside telephone No.

    702.02 ? Thick concrete paving surround Item 1

    704 - CABLE CONDUITS FOR INTELLIGENT TRANSPORT SYSTEMS

    704.01 ?mm Diameter heavy duty PVC conduit in trench m

    704.02 Extra over conduit in trench for excavation in rock m

    704.03 Extra over conduit in trench for directional drilling underexisting roadway

    m

    704.04 Lockable cable pit type ? No.

    712 - TRAFFIC SIGNALS

    Contract No. ??/?? Page 23

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    24/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    ? STREET INTERSECTION

    712.01 Traffic signal controller No.

    712.02 Traffic signal poles No.

    712.03 Traffic signal aspects No.

    712.04 Traffic signal detection loop No.

    712.05 Pedestrian push button No.

    712.06 Advanced flashing warning signal mounted on doublepoles

    No.

    712.07 Red light infringement camera and housing No.

    712.08 Red light infringement camera pole No.

    712.09 Traffic signal cable pit type ? No.

    712.10 ? Diameter heavy duty PVC conduit in trench m

    712.11 Extra over conduit in trench for directional drilling underexisting roadway

    m

    712.12 ? Core ?mm diameter cabling between traffic controllerand traffic signals, (pedestrian push buttons, red lightinfringement camera and advanced flashing warningsignal> as required

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    25/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    SERIES 900 - MISCELLANEOUS

    901 - CONCRETE - GENERAL WORKS

    901.01 ?mm Thick concrete footpath m

    903 - FENCING

    Chainlink Fencing

    903.01 ? High chainlink non-railed tension wire fence (Type ?) m

    903.02 ? Wide x ? high single chainlink gate No.

    Agricultural Fencing

    903.03 ? High agricultural fence (Type ?) m

    Relocation Of Existing Fencing

    903.04 Relocation of existing ? high chainlink fencing m

    903.05 Relocation of existing ? wide x ? high chainlink gate No.

    Removal Of Redundant Fencing

    903.06 Removal of redundant ? high chainlink fencing includinggates

    m

    904 - NOISE WALLS

    904.01 Reinforced concrete footings including excavation,formwork and reinforcement

    m

    904.02? Brickwork in noise wall type ?

    m

    904.03 Extra over brickwork in noise wall for ? x ? pier (In ? No.piers)

    m

    904.04 ? x ? capping to pier No.

    906 - STOCK GRIDS

    906.01 Stock grid type ?, size ?m x ?m No.

    906.02 Removal of redundant stock grid type ?, size ?m x ?m No.

    907 - LITTER BINS

    907.01 Litter bin No.

    907.02 Relocation of existing litter bin No.

    907.03 Removal of redundant litter bin No.

    908 - ANTI-GRAFFITI

    908.01 Anti-graffiti coating to brick noise wall m

    Contract No. ??/?? Page 25

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    26/63

    MAIN ROADSWestern Australia

    Roadworks

    Item Description Unit Qty Rate

    To Summary

    Contract No. ??/?? Page 26

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    27/63

    MAIN ROADSWestern Australia

    Roadworks

    Contract No. ??/?? Page 27

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    28/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 28

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    29/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 29

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    30/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 30

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    31/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 31

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    32/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 32

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    33/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 33

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    34/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 34

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    35/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 35

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    36/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 36

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    37/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 37

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    38/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 38

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    39/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 39

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    40/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 40

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    41/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 41

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    42/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 42

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    43/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 43

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    44/63

    MAIN ROADSWestern Australia

    Roadworks

    Amount

    Contract No. ??/?? Page 44

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    45/63

    MAIN ROADSWestern Australia

    Provisional Sums

    SCHEDULE No. 3 - PROVISIONAL SUMS

    Contract No. ??/?? Page 45

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    46/63

    MAIN ROADSWestern Australia

    Provisional Sums

    Item Description Unit Qty Rate Amount

    PROVISIONAL SUMS

    SUPERINTENDENT'S TELEPHONE AND FACSIMILE CALLS

    PS.01 Allow the Provisional Sum of $? (? Thousand

    Dollars) for the cost of metered telephone andfacsimile calls of the Superintendent

    P.S.

    EARTHWORKS

    PS.02 Allow the Provisional Sum of $? (? ThousandDollars) for the removal and replacement ofunsuitable material

    P.S.

    PS.03 Allow the Provisional Sum of $? (? ThousandDollars) for the excavation of rock

    P.S.

    PS.04 Allow the Provisional Sum of $? (? Thousand

    Dollars) for landscaping

    P.S.

    DRAINAGE

    PS.05 Allow the Provisional Sum of $? (? ThousandDollars) for the removal and replacement ofunsuitable insitu bedding material

    P.S.

    PAVEMENTS AND SURFACING

    PS.06 Allow the Provisional Sum of $? (? ThousandDollars) for backrolling of sealed sections of

    P.S.

    MISCELLANEOUS

    PS.07 Allow the Provisional Sum of $? (? ThousandDollars) for fencing

    P.S.

    BRIDGEWORKS

    PS.08 Allow the Provisional Sum of $? (? ThousandDollars) for pile set-up tests

    P.S.

    PS.09 Allow the Provisional Sum of $? (? ThousandDollars) for load testing of falsework

    P.S.

    SERVICES

    PS.10 Allow the Provisional Sum of $? (? ThousandDollars) for the relocation of existing ?? Mains

    P.S.

    To Summary

    Contract No. ??/?? Page 46

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    47/63

    MAIN ROADSWestern Australia

    Daywork

    SCHEDULE No. 4 - DAYWORK

    Contract No. ??/?? Page 47

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    48/63

    MAIN ROADSWestern Australia

    Daywork

    Item Description Unit Qty Rate Amount

    DAYWORK

    LABOUR

    DW.01 Allow the Provisional Sum of $? (? Thousand

    Dollars) for labour of the Contractor only expendedon persons employed on daywork

    P.S.

    DW.02 Labour on-costs %

    MATERIALS

    DW.03 Allow the Provisional Sum of $? (? ThousandDollars) for the net cost of delivered materials of the

    Contractor only expended on daywork includingdelivery to site

    P.S.

    DW.04 Materials on-costs %

    PLANT

    DW.05 Allow the Provisional Sum of $? (? ThousandDollars) for the cost of plant of the Contractor onlyexpended on daywork

    P.S.

    DW.06 Subcontractors on-costs %

    SUBCONTRACTORS

    DW.07 Allow the Provisional Sum of $? (? ThousandDollars) for the cost of labour, materials and plant ofSubcontractors expended on daywork

    P.S.

    DW.08 Subcontractors on-costs %

    To Summary

    Contract No. ??/?? Page 48

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    49/63

    MAIN ROADSWestern Australia

    Bridge

    BILL No. 1 - BRIDGE ? OVER ?

    Contract No. ??/?? Page 49

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    50/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    SERIES 800 - BRIDGES AND MAJOR STRUCTURES

    801 - EXCAVATION AND BACKFILL FOR STRUCTURES

    STRUCTURAL EXCAVATION

    Abutments And Approach Slabs

    801.01 Abutment footing excavation not exceeding ? m deepcommencing at existing ground level

    m3

    801.02 Extra over abutment footing excavation forexcavation in rock

    m3

    Piers

    801.03 Pier footing excavation not exceeding ? m deep

    commencing at existing ground levelm3

    801.04 Extra over pier footing excavation for excavation inrock

    m3

    Retaining Walls

    801.05 Retaining wall footing excavation not exceeding ? mdeep commencing at existing ground level

    m3

    801.06 Extra over retaining wall footing excavation forexcavation in rock

    m3

    EMBANKMENT CONSTRUCTION

    801.07 Embankment construction behind abutment usingselect material

    m3

    801.08 Extra over selected embankment fill for compactionin zone of special compaction

    m3

    801.09 Preparation, levelling and trimming embankmentconstruction to receive wingwall footing

    m2

    802 - MECHANICALLY STABILISED EARTH WALLS

    802.01 Mechanically stabilised earth wall to abutment Item 1

    803 - DISMANTLING AND DEMOLITION

    803.01 Demolition of existing Bridge No. ? m2

    803.02 Removal of redundant reinforced concrete deck

    overlay

    m2

    803.03 Removal of redundant timber traffic barrier m

    808 - INCREMENTAL LAUNCHING

    808.01 Casting bay and temporary supports Item 1

    808.02 Launching girder Item 1

    808.03 Launching system Item 1

    Contract No. ??/?? Page 50

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    51/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    808.04 Launching of deck segment No.

    810 - DRIVEN STEEL PILES

    810.01 Mobilisation and demobilisation of piling plant Item 1

    810.02 ?UC? Steel pile (In ? No. piles) t

    810.03 ?UC? Steel pile extension (Provisional Quantity) t

    810.04 Extra over ?UC? steel piles and ?UC? steel pileextensions for galvanising (Provisional Quantity)

    t

    810.05 Preparation, handling and pitching of ?UC? steel pile No.

    810.06 Driving of ?UC? steel pile (Provisional Quantity) m

    810.07 Site welded splice to ?UC? steel pile (ProvisionalQuantity) No.

    810.08 Re-driving of ?UC? steel pile (Provisional Quantity) m

    810.09 Cutting off top of ?UC? steel pile and preparing headfor bonding into structure

    No.

    811 - DRIVEN CONCRETE PILES

    811.01 Mobilisation and demobilisation of piling plant Item 1

    811.02 ? x ? Concrete pile, ?m long No.

    811.03 Preparation, handling and pitching of ? x ? concretepile

    No.

    811.04 Driving of ? x ? concrete pile m

    811.05 ? x ? Concrete pile extension m

    811.06 Re-driving of ? x ? concrete pile m

    811.07 Cutting off top of ? x ? concrete pile and preparinghead for bonding into structure

    No.

    819 - FALSEWORK

    819.01 Provision and erection of falsework Item 1

    819.02 Maintenance of falsework Item 1

    819.03 Removal of falsework Item 1

    820 - CONCRETE FOR STRUCTURES

    ABUTMENTS AND APPROACH SLABSPlain Insitu Concrete Class ?

    820.01 ? Blinding layer under abutment footing (In ? m2) m3

    Contract No. ??/?? Page 51

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    52/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    820.02 ? Blinding layer under abutment capbeam andwingwalls (In ? m2)

    m3

    820.03 ? Blinding layer under wingwall (In ? m2) m3

    820.04 ? Blinding layer under approach slab (In ? m2) m3

    820.05 ? Blinding layer under dual use path (In ? m2) m3

    Reinforced Insitu Concrete Class ?

    820.06 Abutment footing m3

    820.07 Abutment wall and wingwalls m3

    820.08 Abutment column m3

    820.09 Abutment capbeam and wingwalls m3

    820.10 Wingwall m3

    820.11 Approach slab m3

    820.12 Dual use path m3

    PIERSPlain Insitu Concrete Class ?

    820.13 ? Blinding layer under pier footing (In ? m2) m3

    Reinforced Insitu Concrete Class ?

    820.14 Pier footing m3

    820.15 Pier m3

    820.16 Pier column m3

    820.17 Pier capbeam m3

    RETAINING WALLSPlain Insitu Concrete Class ?

    820.18 ? Blinding layer under retaining wall footing (In ? m2) m3

    Reinforced Insitu Concrete Class ?

    820.19 Retaining wall footing m3

    820.20 Retaining wall m3

    DECKReinforced Insitu Concrete Class ?

    820.21 Deck slab, diaphragms and beams m3

    820.22 Dual use path m3

    Post-tensioned Prestressed Insitu Concrete Class ?820.23 Deck slab, diaphragms and beams m3

    821 - FORMWORK

    Contract No. ??/?? Page 52

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    53/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    ABUTMENTS AND APPROACH SLABSFormwork Class ?

    821.01 Sides of abutment footing m2

    821.02 Sides of abutment wall and wingwalls m2

    821.03 Sides of abutment wall and wingwalls, curved on m2

    821.04 Sides of abutment column, curved on plan m2

    821.05 Sides of abutment capbeam and wingwalls m2

    821.06 Sides of wingwall m2

    821.07 Sides of wingwall, curved on plan m2

    821.08 Sides of approach slab m2

    821.09 Sides of dual use path m2

    PIERSFormwork Class ?

    821.10 Sides of pier footing m2

    821.11 Sides of pier m2

    821.12 Sides of pier, curved on plan m2

    821.13 Sides of pier column, curved on plan m2

    821.14 Sides and soffit of pier capbeam m2

    RETAINING WALLSFormwork Class ?

    821.15 Sides of retaining wall footing m2

    821.16 Sides and ends of retaining wall m2

    821.17 Sides of retaining wall, curved on plan m2

    DECKFormwork Class ?

    821.18 Sides of diaphragm m2

    821.19 Soffit of deck slab m2

    821.20 Sides of deck slab and upstand m2

    821.21 Sides and soffit of diaphragm m2

    821.22 Sides of kerb/edge beam m2

    821.23 Sloping soffit of diaphragm m2

    821.24 Sides of dual use path m2

    Contract No. ??/?? Page 53

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    54/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    Permanent Steel Formwork

    821.25 ? Bondek to soffit of deck slab m2

    Permanent Void Formwork

    821.26 ? Diameter x ? thick helical lock seam corrugated

    galvanised steel pipe void former (In ? No.)

    m

    822 - STEEL REINFORCEMENT

    ABUTMENTS AND APPROACH SLABSReinforcing Bars

    822.01 Bars less than 16 diameter in abutment footing t

    822.02 Bars less than 16 diameter in abutment wall andwingwalls

    t

    822.03 Bars less than 16 diameter in abutment column t

    822.04 Bars less than 16 diameter in abutment capbeamand wingwalls t

    822.05 Bars less than 16 diameter in wingwall t

    822.06 Bars less than 16 diameter in approach slab t

    822.07 Bars less than 16 diameter in dual use path t

    822.08 Bars 16 - 36 diameter in abutment footing t

    822.09 Bars 16 - 36 diameter in abutment wall and wingwalls t

    822.10 Bars 16 - 36 diameter in abutment column t

    822.11 Bars 16 - 36 diameter in abutment capbeam andwingwalls

    t

    822.12 Bars 16 - 36 diameter in wingwall t

    822.13 Bars 16 - 36 diameter in approach slab t

    822.14 Bars 16 - 36 diameter in dual use path t

    Reinforcing Fabric

    822.15 ? Fabric in approach slab m2

    822.16 ? Fabric in dual use path m2

    PIERSReinforcing Bars

    822.17 Bars less than 16 diameter in pier footing t

    822.18 Bars less than 16 diameter in pier t

    822.19 Bars less than 16 diameter in pier column t

    822.20 Bars less than 16 diameter in pier capbeam t

    Contract No. ??/?? Page 54

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    55/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    822.21 Bars 16 - 36 diameter in pier footing t

    822.22 Bars 16 - 36 diameter in pier t

    822.23 Bars 16 - 36 diameter in pier column t

    822.24 Bars 16 - 36 diameter in pier capbeam t

    Reinforcing Wire

    822.25 Wire less than 16 diameter in pier column t

    Reinforcing Fabric

    822.26 ? Fabric in pier capbeam m2

    RETAINING WALLSReinforcing Bars

    822.27 Bars less than 16 diameter in retaining wall footing t

    822.28 Bars less than 16 diameter in retaining wall t

    822.29 Bars 16 - 36 diameter in retaining wall footing t

    822.30 Bars 16 - 36 diameter in retaining wall t

    Reinforcing Fabric

    822.31 ? Fabric in retaining wall m2

    DECKReinforcing Bars

    822.32 Bars less than 16 diameter in deck slab, diaphragmsand beams

    t

    822.33 Bars less than 16 diameter in dual use path t

    822.34 Bars 16 - 36 diameter in deck slab, diaphragms andbeams

    t

    822.35 Bars 16 - 36 diameter in dual use path t

    822.36 ?mm Diameter mechanical splice No.

    Reinforcing Fabric

    822.37 ? Fabric in deck slab, diaphragms and beams m2

    822.38 ? Fabric in dual use path m2

    824 - PRESTRESSING OF CONCRETE

    DECK

    824.01 Stressing anchorage type ? No.

    824.02 Dead end anchorage type ? No.

    824.03 Coupler type ? No.

    Contract No. ??/?? Page 55

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    56/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    824.04 Prestressing tendon comprising ? No. ? diameterwires in ? diameter tendon sheathing duct (In ? No.tendons)

    m

    824.05 Stressing of ? No. x ? diameter wire tendon and

    grouting of ? diameter tendon sheathing duct

    No.

    825 - SANDBLASTED CONCRETE FINISH

    ABUTMENTS AND APPROACH SLABS

    825.01 Sandblasted finish to exposed surfaces of abutmentwall and wingwalls

    m2

    PIERS

    825.02 Sandblasted finish to exposed surfaces of pier m2

    RETAINING WALLS

    825.03 Sandblasted finish to exposed surfaces of retaining

    wall

    m2

    828 - PRECAST CONCRETE MEMBERS

    Precast Prestressed Concrete "I" Beams

    828.01 ?m Long "I" beam No.

    Precast Prestressed Concrete Plank Beams

    828.02 ? x ? Plank beam, ?m long No.

    829.01 Parapet panel type ?, ? long No.

    830 - STRUCTURAL STEELWORK

    830.01 ?WB? Deck beam (In ? No. beams) t

    830.02 ?UC? Deck bracing (In ? No. braces) t

    830.03 ? x ? x ? Beam base plate No.

    831 - MINOR STEEL ITEMS

    831.01 Galvanised ? x ? x ? plate fixed to abutment wall withchemical anchors

    No.

    831.02 Galvanised pier shear key No.

    603 - SAFETY BARRIER SYSTEMS FORSTRUCTURES

    BARRIER

    603.01 3 rail RHS traffic barrier system for structure m

    603.02 Galvanised Thriebeam barrier system m

    603.03 Galvanised W-Beam barrier system m

    603.04 Galvanised Thriebeam/W-Beam barrier systemtransition

    No.

    Contract No. ??/?? Page 56

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    57/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    603.05 Galvanised modified eccentric loader terminal No.

    833 - BALUSTRADES AND HANDRAILS

    BALUSTRADES833.01 Galvanised and painted balustrade (complete

    system)m

    833.02 Extra over balustrade for light pole base all asDrawing ? including conduit connection to junctionbox, and casting in edge plate and tie-inreinforcement to deck slab

    No.

    835 - PROTECTIVE TREATMENT OF STEELWORK

    835.01 Extra over ?WB? deck beam for galvanising t

    835.02 Extra over ?UB? bracing for galvanising t

    835.03 ? Coat chlorinated rubber paint to deck beam m2

    850 - TIMBER BRIDGES

    850.01 Preparation of timber decking to receive concreteoverlay

    m2

    850.02 Routine maintenance of outside timber stringer (In ?No. stringers)

    m

    850.03 Replacement of timber stringer with ?UB? Stringer(In. ? No. stringers)

    m

    850.04 Stringer or corbel bolting No.

    850.05 Anti-fungal groundline treatment of timber pile No.

    850.06 Pile repair type ? to abutment pile No.

    850.07 Pile band to variable diameter timber pile No.

    850.08 Bolt tightening to ? No.

    850.09 End grain sealing to ? Item 1

    850.10 Vegetaion and debris clearance below bridge Item 1

    860 - BRIDGE BEARINGS

    BRIDGE BEARINGS

    860.01 ? Diameter x ? elastomeric laminated rubber bearingincluding galvanised ? O.D. x ? CHS socket cast intoconcrete, ? diameter galvanised dowel ? long, drypack mortars, forming horizontal recess, etc.

    No.

    Contract No. ??/?? Page 57

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    58/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    860.02 ? x ? Rubber bearing pad including ? diametergalvanised dowel cast into concrete

    No.

    APPROACH SLAB BEARINGS

    860.03 Approach slab bearing comprising ? x ? x ?

    polyethylene sheet (HDPE), ? x ? x ? rubber bearingpad, galvanised dowel cap cast into approach slaband ? diameter galvanised dowel ? long cast intodeck slab all as Drawing ?

    No.

    870 - COMPRESSION JOINT SEAL

    870.01 ? Compression seal including galvanised expansionjoint edging with anchor straps cast into concrete andgalvanised cover plates all as Drawing ? (In ? No.expansion joints)

    m

    875 - WATERPROOF MEMBRANE

    ABUTMENTS AND APPROACH SLABS

    875.01 Bituthene ? waterproof membrane (? wide) appliedbehind contraction joint in abutment wall

    m2

    DECK

    875.02 Bituthene ? waterproof membrane laid on deck slabunder dual use path and median

    m2

    908 - ANTI-GRAFFITI - BRIDGES/MAJOR

    STRUCTURES

    ABUTMENTS AND APPROACH SLABS

    908.01 Anti-graffiti coating to exposed surfaces of abutment

    wall and wingwalls

    m2

    PIERS

    908.02 Anti-graffiti coating to exposed surfaces of pier m2

    RETAINING WALLS- BRIDGES

    908.03 Anti-graffiti coating to exposed surfaces of retainingwall

    m2

    407 - KERBING

    407.01 ? x ? Overall precast concrete kerb laid on deck slabincluding mortar bed and all necessary insitu infill

    m

    MISCELLANEOUS

    ABUTMENTS AND APPROACH SLABSExpansion Joints

    M.01 Expansion joint between ? approach slab andabutment wingwalls including treating wingwall facewith bond breaker, forming ? x ? groove at top andsealing with approved sealant as Drawing ?

    m

    Contract No. ??/?? Page 58

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    59/63

    MAIN ROADSWestern Australia

    Bridge

    Item Description Unit Qty Rate Amount

    M.02 ? x ? Polystyrene foam between approach slabblinding layer and abutment as Drawing ?

    m

    Contraction Joints

    M.03 Contraction joint in ? approach slab comprising ?

    plywood ? wide set vertically and ? deep groove attop surface sealed with approved sealant as Drawing

    m

    M.04 ? Diameter Class ? PVC pipe set vertically inabutment wall and tied to reinforcement behinddummy joint including end caps (In ? No.)

    m

    Waterstops

    M.05 ? Waterstop cast into concrete m

    RETAINING WALLSExpansion Joints

    M.06 Expansion joint comprising ? bitumen impregnated

    fibreboard joint filler ? wide with ? x ? sealant and ?centre type waterstop cast into concrete, ? diametergalvanised dowels ? long with PVC caps andbituminous paint cast into concrete at ? centres andforming groove in front face all as Drawing ?

    m

    To Summary

    Contract No. ??/?? Page 59

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    60/63

    MAIN ROADSWestern Australia

    Further Examples

    FURTHER EXAMPLES

    Contract No. ??/?? Page 60

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    61/63

    MAIN ROADSWestern Australia

    Further Examples

    Item Description Unit Qty Rate Amount

    SERIES 300 - EARTHWORKS

    304 - REVEGETATION AND LANDSCAPING

    304.01 Notwithstanding Main Roads Standard Method of

    Measurement for Construction Works Clause304.2.4, establishment of landscaping shall bemeasured as an Item.

    Note

    304.02 Ground preparation m2

    304.03 Imported topsoil, ? thick m2

    304.04 Mulch, ? thick, in plant beds m2

    304.05 Grass stolons planted at the rate of ?m2 of turf tocover ?m2 of ground

    m2

    304.06 Establishment of landscaping Item 1

    To Summary

    Note Refer also to SMM Example Contract Speci f ic

    Preamblesfor alternative method where items

    not currently measured in SMM need to be

    included

    Example of a "Contract Specific

    Preamble"inserted in the relevant

    schedule/bill in accordance with the

    "Principles For Preparing Schedules Of

    Rates And Bills Of Quantities" Clause 1.5

    Contract No. ??/?? Page 61

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    62/63

    MAIN ROADSWestern Australia

    Author's Notes

    Where additional items are added to Schedule 2 - Roadworks, the Cont

    should be checked, and when necessary manually corrected.

    If the "Bridge" Bill(s) is/are not required, delete the sheet and the entri

    and Summary pages. If extra Bridge Bills are required, copy the Bridge

    edit/amend both the Contents and the Summary page to suit.

    ALL items in the Schedule of Rates/Bill of Quantities that have, 'Item'

    measurement shall have the quantity of '1'entered in the Quantity colu

    encourage tenderers to provide an individual rate or price for each item

    the requirements of the Preambles To The Schedule of Rates And Bills

    Clause 9.12 of the Conditions Of Tendering.

    Correct the Contract number shown in ALL the footers :

    Press the CTRL & i keys together, and follow the prompts.

    With correct use of this document, ALL totals should automatically be

    Section Total and Summary. However, Authors should still check that

    happened.

    This document must be completed by a Qualified Quantity Surveyor ex

    Roads WA Major Works Contracts. Main Roads' Quantity Surveyor ca

    to ensure accuracy and completeness of these Schedules of Rates and/o

    Quantities and compliance with Main RoadsStandard Method Of Me

    Construction Works.

    The Project Description lines only need to be entered on the Contents P

    information entered there will automatically appear on the Summary Pa

    AUTHOR's NOTES

    Delete these notes fr om (or Do Not Prin t with) fi nal tende

    This Document must be measured and compiled in accordance with M

    Standard Method Of Measurement For Construction Worksand in

    Preambles To The Schedule of Rates And Bills Of Quantities andwContract Specific Preambles.

    Contract No. ??/?? Page 62

  • 8/10/2019 SMM Example Schedule of Rates - Bill of Quantities 10July2012.u_3842828r_1n_D12^23210355

    63/63

    MAIN ROADSWestern Australia

    Author's Notes