Heron Resources Limited Tarago Operations Pty Limited
Woodlawn Mine
SML 20
Pollution Incident Response Management Plan
March 2017
Document Control Details
DOCUMENT DETAILS
Name: Pollution Incident Response Management Plan Author: Robert Byrnes Reference: PIRMP Revision No.: 3 Document Status Operational
REVISION DETAILS
Revision No.
Date Details of Revision Reviewed By
Approved By
1 20/2/15 Draft for Review RB HS 2 19/12/16 Revision 2 RB AL 3 20/3/17 Operational RB AL
CIRCULATION DETAILS
Name Department/Organisation
Heath Sandercock Heron Resources Andrew Lawry Heron Resources Brian Hearne Mine Manager
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page i
Table of Contents
1. Introduction 1
1.1 Objectives 1 1.2 Document Purpose 1 1.3 Document Definitions 1 1.4 Mandatory Requirements 2 1.5 Key Personnel and Responsibilities 2
2. Legislation 3
2.1 NSW Regulations 3 2.2 Pollution Incidents Causing Material Harm 3
3. Potential Pollution Incidents and Responses 4
3.1 Possible Pollution Incidents at the Woodlawn Mine 4 3.2 Pollution Incident Emergency Response 4 3.3 Emergency Procedure In The Event Of Fire Underground 6
4. Procedures for Calling Emergency Services 8
5. Notification 9
5.1 Internal Notification 9 5.2 Internal Contact List 9 5.3 Notification Details 9 5.4 Pollution Incident Authority Contact List 10 5.5 Resident Contact List 11 5.6 Implementation and Training Requirements 11 5.7 Record Keeping 11
Appendices Appendix A - Notification Logs List of Plans Plan 1 Locality Plan Plan 2 General Arrangement Plan 3 Environmental Monitoring Sites
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 1
1. Introduction 1.1 Objectives
This document details Woodlawn Mine’s Pollution Incident Response Management Plan. It provides a management plan designed to outline an appropriate response to a pollution event either on the surface or within the underground workings. This plan ensures compliance with the requirements of NSW’s Protection of the Environment Legislation Amendment Act 2011 (POELA Act) and is a requirement for all licensed mine premises in NSW. This plan forms part of the Environmental Management Strategy at the Woodlawn Mine and the Safety Management Plan prepared under the Mines Health and Safety Act 2002 Part 5, Division l, Subdivision 5, Clause 47.
1.2 Document Purpose The purpose of this Plan is to assure compliance of Woodlawn Mine in terms of management of pollution events and notification requirements in NSW in case of pollution incidents that cause or threaten to cause material harm to people or environment.
1.3 Document Definitions
Term Definition
Act A legal document created from the results of deliberation of a legislative body. In Australia, Acts are passed by State and Commonwealth Parliaments
ARA Appropriate Regulatory Authority. This includes EPA, relevant Local Authority, Fire Brigade, WorkCover and a local Public Health Unit plus any other Public Authority that is a statutory authority for the matter in question, if different from above
Material harm In terms of the POEO Act, material harm caused by a pollution incident relates to "actual or potential harm to the health or safety of people or ecosystems that is not trivial, or loss or property damage exceeding $10,000, either offsite or onsite". The $10,000 threshold includes any investigation costs associated with the pollution incident.
POELA Act Protection of the Environment Legislation Amendment Act 2011, issued by NSW Government to regulate environmental incident reporting and disclosure of environmental monitoring data
PIRMP Pollution Incident Response Management Plan. A detailed emergency response plan that needs to be implemented at all EPA-licensed sites in NSW by 1 September 2012
SOP Standard Operating Procedure. A formal procedure for undertaking complex and recurring tasks where neither physical nor environmental layout will change
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 2
1.4 Mandatory Requirements The minimum mandatory requirements for compliance to this Plan are outlined in the table below:
Requirement Examples of Evidence/Verification
The Mine Manager and Environmental Officer for Woodlawn Mine share responsibility to notify immediately the relevant Authorities and community as specified in this document following a serious environmental incident
Details of notifications summarised in the Incident Report
1.5 Key Personnel and Responsibilities Management responsibility for the Woodlawn Mine will be as follows. Table 1 - Key Mine Personnel
Position Personnel Company Responsibility Contact Details Managing Director Wayne Taylor Heron
Resources Limited
Overall responsibility for the construction and operation of the Woodlawn Project
02 9119 8111
Chief Operating Officer
Andrew Lawry Heron Resources
Responsible for project delivery and operations
02 9119 8111
Manager Mining Engineering
To be appointed Heron Resources Limited
Mine Planning and Design 02 9119 8111
Mine Manager Brian Hearne Heron Resources Limited
Conduct of mining operations
02 9119 8111
Exploration Manager, Chief Geologist
David von Perger
Heron Resources Limited
Resource evaluation 02 9119 8111
Environmental Manager
Robert Byrnes IEC Conduct of environmental management and compliance
02 4878 5502
The personnel will be updated from time to time as changes occur.
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 3
2. Legislation 2.1 NSW Regulations
The Protection of the Environment Legislation Amendment Act 2011 (POELA Act) requires:
Immediate notification of an expanded list of relevant statutory authorities in case of a pollution incident.
Establishment of a Pollution Incident Response Management Plan (PIRMP). Making publicly available any Licence related monitoring data. This document addresses the immediate notification requirements for pollution incidents at the Woodlawn Mine.
2.2 Pollution Incidents Causing Material Harm
Any pollution incident that cause or threaten material harm to the environment must be notified by a person to a site specific list of government authorities immediately upon becoming aware of the incident. In case new information comes to hand following the initial notification, this information must also be reported immediately. The failure to do so incurs the maximum penalty to $2,000,000 for a corporation, with $240,000 for each day the offence continues. The definition of “material harm” caused by a pollution incident relates to "actual or potential harm to the health or safety of people or ecosystems that is not trivial, or loss or property damage exceeding $10,000, either offsite or onsite". The $10,000 threshold includes any investigation costs associated with the pollution incident. As such, the incident need not be a significant one as this threshold could be quite easily exceeded within the context of a relatively minor environmental impact if it requires investigation and remediation. This also includes environmental harm caused only on site.
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 4
3. Potential Pollution Incidents and Responses 3.1 Possible Pollution Incidents at the Woodlawn Mine The potential, albeit not necessarily likely, pollution incidents at the Woodlawn Mine include:
Fire, explosions and smoke on the surface or within the underground workings. On-site spills or leaks of fuel, oil or hydraulic fluid that cause or threaten
environmental harm, property damage or personal injury.
Bushfire near or around the site which threatens the safety of the workforce or nearby residents.
Truck spills on public roads within or near the site premises which may cause fuel, lubricants or other products to enter the site or threaten to enter water ways.
Pipe burst resulting in contaminated water and/or tailings going off site.
Dam overtopping resulting in contaminated water going off site. This Pollution Incident Response Management Plan covers events and activities which may cause pollution incidents involving material harm. The main areas and issues covered in this plan are: Existing controls to prevent pollution incidents.
Incident response actions to mitigate potential incidents.
Immediate reporting of pollution incidents to relevant statutory authorities.
Maintaining communications with Appropriate Regulatory Authorities during incident response.
Reporting of incidents to stakeholders including local communities.
Site specific roles and responsibilities in incident response and reporting.
3.2 Pollution Incident Emergency Response In the event of a pollution incident the risk of harm to human health will be minimised by engaging an appropriate pollution response as outlined below:
1. Isolate the area: In the event of oil, fuel or hydraulic fluid spill or leak, the area
should be isolated and barricaded if required to reduce the risk of exposure to people. This must occur without exposure to danger.
2. Stop the source: If it safe to do so, stop the process causing the spill/leak or other
environmental incident.
3. Commence early notification: The Mine Manager or Environmental Manager must be notified immediately of the environmental incident. Should the incident
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 5
threaten environmental harm, they in turn must immediately proceed with the notification of Authorities as detailed in this Plan. If the environmental incident threatens off site impacts or involves the township of Tarago, the nominated person implements early notification procedures to the relevant Authorities including emergency services and alerts potentially affected residents, with regular updates provided as needed.
4. Provide a 1st aid response (if required): First aid kits including instruction on use are available at the Contractors Office and designated underground first aid stations. Appropriate PPE is worn by all staff during periods of potential exposure as outlined in relevant MSDS.
5. Identify the release to the greatest extent possible: Do so without being at risk. This includes identifying:
a. the type of material released, e.g. i. Class 2 Gases - compressed, liquefied or dissolved under
pressure. ii. Class 3 Flammable Liquids
iii. Solid material spill
b. The label and Material Safety Data Sheet for the product should give information on safe cleanup.
c. The size of the release and whether the release has stopped; d. Whether chemicals involved may be potentially incompatible; and e. Any unusual features such as foaming, odour, smoke, etc.
6. Determine the level of emergency: review chemical risk assessments, seek
internal advice from area specialists, review MSDSs and seek professional advice from the fire brigade and/or hazardous material specialists.
7. Determine if evacuation is required and consider the impact that wind, rain, local geographical features such as hills and stormwater drainage systems may have in exposing persons at emergency assembly points. The Mine Manager or Construction Contractor Manager is to determine if evacuation of the site is to occur.
8. Stop further release (if not done prior): prevent further release by isolating the source of the release. (Trained personnel only with suitable PPE).
9. Stop the release from spreading (if safe to do so): deploy spill kits to prevent
further contamination dispersal: a. Liquid spills. Use appropriate absorbent/containment materials such as
socks (land) and booms (water), plug drains to prevent contamination of stormwater.
b. Ensure that pollution control ponds remain as nil discharge by checking levels and pumps.
c. Powdered solid spills: cover drains to prevent contamination of stormwater
d. Large spills: Summon specialist spill emergency response contractors (e.g. Transpacific Industrial Solutions, 1800 SPILLS). Although the quantities of materials stored on site are minor, this procedure is relevant
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 6
if there is an incident involving a delivery truck. e. Dispose of contaminated spill clean materials and wastes using a
licensed contractor f. If required, remediate the site.
10. Fire on the Surface: Call 000 and report fire.
a. In the event of an equipment fire the operator should activate the fire suppression system on the equipment and disembark carrying any portable fire extinguisher with them. If safe to do so the operator should attempt to extinguish the fire using a portable fire extinguisher. Battery isolator should be turned off if safe to do so.
b. Portable fire extinguishers are located around the site and should be used to extinguish fires if they start within fixed plant. Any energy source should be isolated if safe to do so.
c. Evacuate surface personnel and assemble in the carpark d. Evacuate underground workforce and assemble in the carpark e. Once all personnel are accounted, evacuate the mine site if safe to do so
11. Fire Underground:
a. Call emergency internal number to report incident to the Mine Manager b. Check number of persons on shift c. Check mine monitoring system d. Is the power still on underground e. Is the main fan still running f. Note reports from any witnesses g. Determine level of incident h. Mine Manager to determine evacuation i. Evacuate mine and assemble in Carpark j. Determine contact list and reporting k. Contact Mines Rescue on 4284 4218 l. Contact Mines Inspector on 4222 8333
Further procedures in the event of underground fire is provided below
3.3 Emergency Procedure In The Event Of Fire Underground In the event of an equipment fire the operator should activate the fire suppression system on the equipment and disembark carrying any portable fire extinguisher with them. If safe to do so the operator should attempt to extinguish the fire. Contact and inform the senior mining official of the situation and the status at the mine. Write down any instructions you may be given in response. Summon trained persons around the mine surface to assist. Refer to "Mine Telephone" list and contact personnel in work areas of fire location. Briefly advise them of the situation and instruct them to commence evacuation procedures.
a) Telephone the work area nearest to the fire first. b) Messages to be as short as possible and ensure they are clearly understood.
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 7
c) Mark off telephone list as contact is made. d) If you have assistance use additional telephones to speed up this procedure. e) Record name of persons contacted.
Dispatch assistance if required. Assistance may be received from: -
a) Surface personnel b) Work areas unaffected by the fire.
Dispatch equipment if required. This can be done by: -
a) Men carrying the equipment. b) Any available underground vehicle,
Contact Mines Rescue Station and put them on stand-by after briefing them on situation. Arrange an underground transport to be on standby. Keep a log of all vehicle locations, phone calls and instructions. FIRE UNDERGROUND NOTES CHECK LIST
Item Done Time Assistance on the surface. Contact inbye of fire areas Contact officials at the mine. Dispatch assistance Dispatch equipment. Make necessary phone calls. Transport to surface on stand-by. Keep a log.
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 8
4. Procedures for Calling Emergency Services Dial 000 Ask for Ambulance/ Fire Brigade/Police. Be prepared to state: Woodlawn Mine calling Collector Road Tarago Nature of Emergency: Fire Serious Injury — number of injured and nature of injury Entrapment — number of personnel Mine Telephone Number: 02 9119 8111 Give your name Directions to the mine: Approaching from Bungendore: Turn left on Collector Road. Mine Entrance is 5.3 km but before the Veolia Bioreactor entrance. Approaching from Tarago: Proceed past the Crisps Creek Intermodal rail facility Turn right on Collector Road Mine Entrance is 5.3 km but before the Veolia Bioreactor entrance. GPS Coordinates 350 03’ 36.33” S 1490 35’ 02.20” E Ask for estimated time of arrival at the mine and log same: ETA………………..
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 9
5. Notification 5.1 Internal Notification Any pollution incident satisfying the material harm threshold must be immediately reported to relevant statutory authorities by either the Mine Manager or the Mine Environmental officer.
In cases where “material harm” level cannot be immediately assessed or insufficient information comes to hand on the severity of the incident, the general advice is to err on the site of caution and notify the Relevant Authorities with a qualification that the situation could not yet be fully assessed.
Although the listed personnel are authorised to contact the relevant agencies, as always, it is every employee’s responsibility to immediately call 000 in the event of emergency particularly if there is injury or rescue is required.
5.2 Internal Contact List
Position Name Phone Heron Resources Limited Sydney Office 02 9119 8111
Managing Director Wayne Taylor 02 9119 8111
COO Andrew Lawry 0411 873 356
Mine Manager Brian Hearne 0409 680 084
Environmental Manager Robert Byrnes 0417437120
OH&S Representative Alexandra Bonner 0422 169 365
Veolia Reception Bioreactor 02 4844 6262
Veolia Facility Manager Henry Gundry 02 4844 6351
Veolia Operations Manager David Figueiredo 02 4844 6352
5.3 Notification Details The Mine Manager or Environmental Manager is authorised to enact the necessary notification and must be done immediately upon becoming aware of the pollution incident. The initial notification should include as much of the following information (if known) as possible:
- location and time of the pollution incident
- type of the incident (spill, fire, unlicensed harmful discharge, etc) - assessed level of incident gravity and extent
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 10
- whether the Emergency Services have been required to attend.
All notifications must be documented in the Notification Log (form attached) with the details of time of notifications and the persons who took to the call.
5.4 Pollution Incident Authority Contact List The following contact list includes compulsory notification and a supplementary list which require notification depending on the nature of the incident.
Government Authority - Compulsory Notifications
Emergency notification phone number
EPA – Environment Line 131 555
NSW Police and Ambulance 000
NSW Fire and Rescue 1300 729 579
Goulburn Mulwaree Council 4823 4444
Palerang Shire Council 1300 735 025
Emergency Services 132500
WorkCover 131050 Company ABN asked: 62 008 528 523
Public Health Unit (Sydney South West) – Camperdown Office
BH: 9515 9420 AH: 9515 6111 Ask for Public Health Officer on call
Government Authority – If Relevant Emergency notification phone number
Mines Rescue 4286 5499
Sydney Catchment Authority 1800 061069
Roads and Maritime Services (road spills) 132 701
NSW Office of Water 8838 7885
Bush Fire Control Officer 1800 049933
Poisons Information Centre 131 126
Goulburn Hospital 4827 3111
Goulburn Police 4824 0799
Tarago Police 02 4849 4411 (not 24 hrs)
Endeavour Energy (power line emergencies) 131 003
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 11
5.5 Resident Contact List In case of pollution incidents that may potentially pose a threat to health or safety of the neighbours the nearby residents need to be urgently notified. As it is likely that not all residents can be contacted by phone, it will be the responsibility of the Mine Manager or Environmental Officer to make arrangements for available employees to door knock around the village of Tarago.
The Environmental Officer will undertake the early warning of the neighbourhood in the first instance by phone. The current contact list for neighbours is provided below. The initial notification should be brief and contain only a description of the environmental threat together with instructions what to do. For example:
Due to a fire on site or bushfire nearby, we are experiencing elevated dust emissions from the site. Please keep your doors and windows closed until further notice.
An accidental discharge occurred from the site. There maybe emergency vehicles using the Collector Road.
Due to a diesel spillage onto a street from the site, a cleanup operation is being organised. Please be watchful for road closures in relation to this operation.
Follow up information on the resolution of emergency situation would be timely conducted also on the phone. If required, further information would be disseminated by means of leaflets in a letterbox drop.
5.6 Implementation and Training Requirements The mine’s Environmental Officer is responsible for dissemination and training of the requirements of this Plan to all site staff and contractors.
Any changes to the document are to be communicated to personnel in a timely manner. Audits and checks will verify that the implementation and compliance to this Plan are monitored.
5.7 Record Keeping An accurate record of immediate notifications is to be kept in all cases. A Notification Log format as attached is preferable. Other proforma record cards are attached.
All training and induction records are to be kept at the mine by the Training Manager and entered into the training register. Records of any toolbox talks are to be maintained by the relevant supervisor using the toolbox talk meeting minutes’ proforma. Record of incident review and corrective action is to be generated and retained to provide evidence of complying with this Plan.
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 12
Appendix A - Attachments
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 13
Pollution Incident Immediate Notification Log
Person undertaking notification (Name/Function):
Date and time when first become aware of the incident:
Incident type:
Comments:
Initial immediate notification log
Appropriate Regulatory Authority
Time of call
Respondent’s name/function
Approximate call duration
Comments
EPA
Public Health Unit
NSW Fire Brigade
Police/Ambulance 000
Emergency Services
Mines Rescue
Sydney Catchment Authority (WaterNSW)
Goulburn Mulwaree Council
WorkCover
Other:
Other:
Summary of initial communication:
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 14
Person undertaking notification (Name/Function):
Date and time when additional information become available:
Comments:
Immediate notification of further pertinent information (if applicable)
Appropriate Regulatory Authority
Time of call
Respondent’s name/function
Approximate call duration
Comments
EPA
Public Health Unit
Emergency 000
Local Council
Tarago Township
Other:
Other:
Summary of additional communication
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 15
Log sheet Date:……………………………..
Item Time
Tarago Operations Woodlawn Mine - Pollution Incident Response Management Plan Page 16
Emergency Call Receiver Card
INFORMATION REQUIRED FOR AN ACCIDENT/EMERGENCY SITUATION
Name of person reporting emergency
Telephone number from where the person is calling
Location of accident or emergency
Type of accident or emergency
Name and number of injured
Type of injuries
Assistance required
Make sure someone stays at the phone, if this is not possible arrange a method for further contact
Log time of call and information received, commence a diary of events
STAY CALM. THINK BEFORE YOU ACT, REPEAT THE MESSAGE TO THE CALLER TO ENSURE YOU HAVE THE CORRECT INFORMATION
Notes:………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Heron Resources
Location: Woodlawn Mine Communications Officer
On becoming aware of an emergency the Communications Officer will take the following actions
Ascertain the nature and location of the incident Identify problems/ solutions to effective communications Notify the appropriate personnel Transmit and record instructions between Chief Warden and others Request outside emergency assistance if instructed by Chief Warden Notify any other parties i.e. neighbours etc
______________________________________________________________________________________ NATURE OF EMERGENCY? ……………………………………………………………………………….. ARE THERE PERSONS INJURED?------------------------------------------------------------------------------------ LOCATION? ……….……………………………………….. Date ……/……/……. Time ……………….
Communications Officer Name ……………………………………………….. Supervisor Name ………………………………………………..
Alarm sounded Yes / No Time ……………… Supervisor Notified Area Supervisor Name ………………………………………… Other Name ………………………………………….
Evacuation Status Prepare for evac Yes / No Time ……………… Evacuate Yes/No Time……………….Evacuation areas ……………………...
Communication Method Radio Runner(s) Phone Mobile/Landline Ph No……………………………..
Action Taken None Fire Suppression Extinguisher Fire Hose Other …………………………………………………………..
Outside Assistance Required Time requested by Chief ……………………….. Agency(s) contacted
Fire Brigade Time contacted …………… Name……………………. Ambulance Time contacted …………… Name……………………. Police Time contacted …………… Name……………………. SES Time contacted …………… Name……………………. SES Time contacted ……………
Heron Resources
Page 2 of 2
Neighbours contacted Person Time
Other ………………………………………………………………………… Other …………………………………………………………………………
Management Contacted Who ………………………………………………… Time ……………………… ………………………………………………… …………………….. ………………………………………………… …………………….. ………………………………………………… …………………….. Message Log From To Details of Message Time …..………………………………………………………………………………………………………….. ……………………………………………………………………………………………………………………………..…………………………………………………………………………………………………..………………………………………………………………………………………………………………………..……………………………………………………………………………………………………………. …..………………………………………………………………………………………………………….. ……………………………………………………………………………………………………………………………..…………………………………………………………………………………………………..…
Stand Down Stand down by Supervisor Time …………….. All Parties Notified of stand down Time of completion …………………..
GR
EAT
DIVID
ING
RA
NG
E
P o w e r l in e
"Willeroo"
"Torokina"
"Pylara"
RFS
6 115 000 N
6 120 000 N
6 115 000 N
6 120 000 N
740 000 E
735 000 E
MGA Zone 55
Drainage catchment boundary
Infigen Woodlawn Wind Farm turbines
Main road, secondary road
Powerline
Dam
SML 20 (The Woodlawn Site)
Tarago Operations area (The Project Site)
Veolia operational site (The Veolia Site)
Creek
Local Government Boundary
November 2015
732 500E
0 1000500 1500 2000 metres
Topographic map source : Lake Bathurst 8827-4-N
Allianoyonyiga1016m
Tarago
WOLLONDILLY
CATCHMENT
Crisps
Creek
LAKE GEORGE
CATCHMENT
Mul
warre
e
River
BUNGENDORE
SML 20
SML 20
ROAD
COLLECTOR
ROAD
Alliano
yony
igaCreek
Creek
Willeroo
Sally930m
Tarago831m
SML 20
MH
SYDNEYNewcastle
Wollongong
200 km
CANBERRA
New South Wales
Woodlawn
FIGURE 1Woodlawn Site - Locality Plan
MINE VOID
Collector - Tarago Road
EVAPORATION DAM 1(ED1)
TAILINGS DAM NORTH
(TDN)
TAILINGS DAM
SOUTH(TDS)
TAILINGS DAM WEST
(TDW
PA
LE
RA
NG
L
GA
GO
UL
BU
RN
- M
UL
WA
RE
E
LG
A
Woodlawn Farm
VEOLIABIOREACTOR
Lake Bathurst
Tarago
Bungendore
149° 30' E35° 00' S
35° 10' S
149° 40' E
0 5 10km
LAKE
GEORGE
6 115 000 N
6 117 500 N6 117 500 N
735 000 E
737 500 E
735 000 E
732 500E
WOLLONDILLYCATCHMENT
LAKE GEORGECATCHMENT
WOLLONDILLYCATCHMENT
LAKE GEORGECATCHMENT
GREAT DIVIDING RANGE
GR
EATDIVIDING
RAN
GE
0 1000 m500
"Pylara"
"Woodlawn Farm"
Nov 2015
SML 20 (The Woodlawn Site)
Tarago Operations area (The Project Site)
Veolia operational site (The Veolia Site)
Local Government Area
Infigen Woodlawn Wind Farm turbines
Proposed Heron Resources Infrastructure
Local Government Area
Drainage catchment boundary
Infigen Woodlawn Wind Farm turbines
Main road, track
Powerline
Embankment, Dam
Building
MH
MINE VOID Collector - Tarago Road
SML 20
SML 20
R E H A B I L I T A T E D W A S T E R O C K
D U M P
Evaporation Dam 3 South
(ED3S)
Evaporation Dam 1(ED1)
Evaporation Dam 2(ED2)
Veolia Office
Tailings Dam North(TDN)
Tailings Dam South(TDS)
Tailings Dam West(TDW
Magazine
VeoliaBioreactor
PA
LE
RA
NG
L
GA
GO
UL
BU
RN
- M
UL
WA
RE
E
LG
A
WASTEROCKDAM
732 500E
Water Tanks
Planned MBT Facility
SP
27702775
2765 27802775 2780 785
790
780
785
790
780
775
277
780
780
2785
780
785
790
785 790
795
800
800
770
2785
790
795
795 795
2785
2790
2785
2785
2790
795
790
790
780 780
790 800
770 790
800
790 790
2785
2785
2785
790
790
790
790
800
830
810
850
810
810
785
780
810
830 860
830 840
820
835 840
790
780 77
0
800
860
840
860
850
860
830 840
830840850
830
770 770
810 820 830
840
830
840
880 830
830 850
860 870
790
795
800
805
810
810 805
805 8
00
800 795 790 785
785
780
820
800 7
95
790
795
790
780
785
765
770
775
830 27
85
790
775
770 760
820 8
30 860
870 76
0
765
770 775 780
760
2765
765
770
770
765
2770
770
2760
2765
2765
770
780
790
800
810
770 780
790
800
770
780
790
780
790
770
780
830
840
810820
830
830
840
810
770
770 770
2780
770
780 790
800
810
820
800 810 820
780 7
90
790
780
780
790
790
800
2785
790 7
95
780 790
780
790 800
790
850
775
800
850
820 830
800
780
750
740
760
770
790
810
820
760
760
780
790
850
860
870880
840
830
820
800
800
800
850
820
750
840
820810800790
830 850
Proposed Tailings Storage Facility (TSF4)
Proposed Site Entry
Proposed Ventilation
Shafts
Proposed Box Cut and Mine Entry
TSF4
Proposed Mine Office and Car Park
Proposed Processing Plant
Proposed Haul Road
Proposed ROM Pad
Proposed Waste Rock Emplacement Area
Proposed Box Cut and Mine Entry
FIGURE 2 Woodlawn Site - Mine and ContextN
Datum GDA MGA Zone 55
Infigen Woodlawn Wind Farm EPL20436
DRAWN: Dean Oliver 17-03-2017
APPROVED: Robert Byrnes 17-03-2017
6 115 000 N
6 117 500 N6 117 500 N
735 000 E
737 500 E
735 000 E
732 500E732 500 E
737 500 E
SML 20
SML 20
March 2017
SML 20 (The Woodlawn Site)
Veolia Environmental ServicesEPL11436
Tarago Operations EPL20821
Veolia MBT FacilitySite Boundary
EPL 20476
Veolia MBT Plant EPL 20476
Stg 1
Stg 2
Tailings Storage Facility
(TSF4)
Site Entry
Ventilation Shafts
Paste Plant Mine Office
and Car Park
Processing Plant
Haul Road
ROM Pad
Waste Rock Emplacement
Box Cut and
Mine Entry
Proposed Heron Resources infrastructure
Tailings Dam North (TDN)
Tailings Dam South(TDS)
Tailings Dam West(TDW
N4ED 3 North
Collector
Evaporation Dam 1 (ED1)
Evaporation Dam 2 (ED2)
PA
LE
RA
NG
L
GA
GO
UL
BU
RN
- M
UL
WA
RE
E
LG
A
0 1000 m500
"Pylara"
N2N3 N1
ED3 South-South Lagoon 5
ED3 South Stormwater
Road
- Tarago
MINE VOIDVeolia BioreactorMINE VOID
Veolia Bioreactor
Attachment 1 Woodlawn Site EPL - Monitoring Sites
Drawing No: TOP - G - 001
Attachment 1 Woodlawn Site EPL - Monitoring Sites
Drawing No: TOP - G - 001
MH
Water Tanks
R E H A B I L I T A T E D W A S T E R O C K
D U M P
WASTEROCKDAM
Veolia Office
"Woodlawn Farm"
"Cowley Hills"
DP754919
DP754919
DP754919
DP754919
DP754919
DP827588
DP754919
DP754919
DP754919
DP754919
DP750033
DP827588
DP1179305
DP114586
DP534616
DP313945
DP754919
DP754919
DP954149
DP357155
DP523960
DP754894
DP754919
DP126600
DP754919DP754919
68
17
12
35
90
21
13
74
75
16
69
179
173
20
13
4
3
2
29
23
1
1
259
57
9687
1
1
1
1
74DP754919 Cadastral boundary and DP/lot numberCadastral boundary
Lot 4
Lot 3
Lot 1
Lot 2
Pt Lot 1
N
Datum : GDA MGA Zone 55
N
MB13
MB6
105
MB4
DG22
DG24
115
DG28
MB13
MW6RWM6
WM5
MW8DWM202, 203
SPRING2
MB3
MB10
MB2
MB8
109
MB5
WM201MB1
P100
WM4
WM1
P38A
P45
P44
MB13WM3
P58
P59
MW8SMW6RWM6
MB7
WM5
ED3B
MB15100
MB14
WM5
MB15
WM300GMBH1
GMBH4
LGF
LGEEP
Met Station
WM200
GEB
GMBH2
MB12
ED2
DG33
MB17MB16
MB11
TSF4
Tarago Operations
Veolia Environmental Services
Shared site
MONITORING SITES
779
790780790
770
780
780
785
775
780
760750
770
800
820
840
850
860
850
840830820
810
800800
810 820
830
800
790780
810
820 830
840
860
800
770
780
765
760
765
765
770
715
810
820
785
785780
785
820
790
800
810
840830
830
820
810 80
0
840
850
770780
770
780
785785
790
795
800
810820
820
830
810