Smart.IC II project

Page 3: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Forklift truck connection

Forklift truck connection, outside of the connector

Automatic data download through GPRS and anlaysis of working cycles.

Data access from: www.alfaprogetti.com

Field applications

Page 4: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Smart.IC II

GPRS AP882

Forklift truck

GPRS communication

TELEPHONE company

SmartView II

CUSTOMER

Serverweb

ALFA PROGETTI

Smart.IC II system

INTERNET

Page 5: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

• Cutting down on maintenance costs

• Overall monitoring on battery and forklift truck use

• Automatic signalling if water topping up is needed

• Automatic weekly email messages reporting bad uses and needed actions

• Problems supported with written evidence in disputes with customers and suppliers

• Saving thanks to an optimized fleet management

• Rating of suppliers and customers according to their reliability

• Extraordinary maintenance invoicing possible

Features

• Invoicing of maintenance required because of bad use

Smart.CB:

• Makes battery life longer

• Allows you to save on charging costs

• Customers made more responsible

Page 6: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Power SavingSMART.IC II + SMART.CB

Charges battery during the cheapest hours

Restores only the capacity used by the battery

Makes battery life longer

The cheapest hours to charge battery can be programmed

Page 7: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Data collected by Smart.IC II can be displayed with:

SmartView II: Personal computer program

SmartWeb: web pages accessible from www.alfaprogetti.com

Software: PC and WEB

In addition SmartService will send you an email message if a failure is detected or forklift truck or battery needs checking.

Page 8: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

It is possibile to analyze instantaneous data ONLINE

System status

Smart.IC II panel

Relay status indication

Battery level indicator

Battery voltage

Inside and outside temperature

Data: Monitor

Page 9: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Instantaneous diagrams downloaded by the Smart.IC II connector ONLINE

Current diagram

Voltage diagram

Data: Diagram

Page 10: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

General information on the stored cycle

Data for searching the Smart.IC II connector

Rating

Battery state while charging

Date and time of charge start

Battery state on discharge

Date and time of discharge start

Battery state at cycle start

Battery state at cycle end

Data: Old

Page 11: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Details of the stored cycle

Discharge data Charging data

Data: Info Old

Page 12: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Averages calculated from stored data

Cycles selection

Discharge stage:

Average capacity at the end of the discharge cycle

Discharged average capacity

Average capacity not available

Charging stage:

Average capacity at the end of charging

Data: Averages

Page 13: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Statistics collected by the Smart.IC II connector

Battery statistics:

Discharge time

Charging time

Stop time

Statistics collected and faults, if any

Data: StatisticsStatistics collected by the

Smart.IC II connector

Page 14: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

The functioning of Smart.IC II can be customized by using some programming parameters concerning the discharge and charging stage of the traction battery where the connector is installed

Rating

Discharge parameters

WEB parameters

Charging parameters

Data: Programming

Page 15: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Data: DailyMonthly report on data concerning the daily working cycles

Time selection Daily summary of operating data:

Start and end date of the cycle

Duty hours during a day

Downloaded Ah during a day

Minimum voltage reached in the last working cycle of the day

Underdischarge time of the last working cycle of the day

Cycle no. which it refers to

Monthly total

Page 16: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Faults SummaryFaults summary

Battery Faults

Charger Faults

User Faults

Page 17: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Data SummaryTabular Data Summary

Page 18: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Example: weekly e-mail reportWeekly check

Page 19: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of

Example: monthly e-mail reportMonthly summary

Page 20: Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of