Smarter Asset Management in Statnett Digitalisering i vattenkraften 9.maj 2019, Quality Airport hotel Arlanda Arne Smisethjell, Project Manager SAMBA, Statnett [email protected]

Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

  • Upload
    others

  • View
    1

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Smarter Asset Management in StatnettDigitalisering i vattenkraften 9.maj 2019, Quality Airport hotel Arlanda Arne Smisethjell, Project Manager SAMBA, Statnett [email protected]

Page 2: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

What is the SAMBA project?

The future is electric

• The SAMBA project has been a 3 year R&D project financially supported by the Norwegian Research Councils Energix program and completed end March 2019.

• The partners in this project have been:

Digitalisering i vattenkraften 9.maj 2019

Page 3: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

The challenges for Asset Management in Statnett

Total NOK ~26 mill

19 use case

3 summerStudents

from NTNU

~18 researchers from Sintef

53 presentations of the project

~70 Statnett

employees

• Aging and increased volume of assets• Statnett must optimize maintenance and investments• Statnett has a lot of data about its components, but can utilize

these in a better way

Some key figures from the SAMBA project:

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 4: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Why SAMBA project?• Predict now condition for critical

components• Predict the development over time for

critical components• The basis for predictive maintenance• Optimize the right time for critical

component replacement• Simplify and automated decision processes

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 5: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Execution of the SAMBA project

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 6: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Smart Grid Reference Architecture

• Use case• Use case is a list of actions or

event steps that define the interaction between roles and a system to achieve a goal

• Template from IEC standard 62559-2

Source: Smart Grid Reference Architecture (SGAM) proposed by the CEN-CENELEC-ETSI Smart Grid Coordination Group

Inte

rope

rabi

lity

Laye

rs

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 7: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Digitalisering i vattenkraften 9.maj 2019

Page 8: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

• Many subcomponents and different condition measurements.

• Oil analysis and temperature data are important

• But, What is the overall condition?• Health index is an aggregation/weighting

of several condition measurements in to one index

The future is electric

1) Winding with paper insulation. 2) Core. 3) Tap changer. 4) HV bushing 5) LV bushing. 6) Tank. 7) Oil expansion tank. 8) Cooling arrangement.

Transformer- AHI (Asset Health Index)

Digitalisering i vattenkraften 9.maj 2019

Page 9: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

• DGA. Continuous monitoring

• Oil condition. (Annual sampling)

• Temperature, PT100, fiber-hot spot

• Inspection, condition

Transformer monitoring and inspections

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 10: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Aging model (AHI)

The future is electric

Various models for the calculation of aging (AHI)

Digitalisering i vattenkraften 9.maj 2019

Page 11: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

• Levert fra SAMBA til Statnett anleggsforvaltning:

• Metoder for beregning av helseindeks fra GE, ABB og Sintef ER.

• Test på data for utvalgte transformatorer• Datagrunnlag:

• Anbefalinger for videre datainnsamling for transformatorer i Statnett også for å høyne kompletthetsindeks (completeness index).

• Implementering vil bli en del av en fremtidig software for anleggsforvaltningen.

Transformer- AHI

The future is electric

70 64 5841

73

3255

38

020406080

Asset Healt Index/kompletthetsindeks

Trafo A Trafo B

Digitalisering i vattenkraften 9.maj 2019

Page 12: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Example of transformer health index

Transformer 1…n

Alarms to AHC

Action operation

Action maintenanceRisk handling

Impact on human safetyEconomic impactImpact on reliabilityImpact on the environment

Needs for replacement

Needs for refurbishment

Operational restrictions

Risk impact/requirements

Should we maintain or reinvest and when?

Technical / Economic Analysis

Solution chosen on the basis of risk assessment

AHI

Risk analysis and prioritization

Condition inspection: Surface/painting Gasket condition Control wires Local readings Oil leaks etc.

Asset condition transformerAsset Management

Exam

ple

of a

hea

lth in

dex

(Com

Ed 2

015,

from

IEC

MSB

wor

ksho

p)

Sens

or s

trat

egy

for A

MRisk handling

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 13: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Todays ICT solution vs. future ICT needs in AM

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 14: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Innovations

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 15: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Innovation

• Tested on Statnett data• Possible to predict

temperature in cable• Goal: Used in operation

and detection of abnormal conditions

The future is electric

Cable temperature prediction

Digitalisering i vattenkraften 9.maj 2019

Page 16: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Recommendations

Improve data quality and availability

• Data Volume

• Data Velocity

• Data Variation

• Data Veracity

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 17: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

What is the benefit of the SAMBA project?Statnett has achieved:

• An ICT architecture suitable for asset management

• Demonstrate the need for sensors, measurements and data quality

• Expertise for condition monitoring models for power components

• Basis for development of Asset Health

The future is electric

SAMBA

Smarter asset management

Effective Smart Safe

Digitalisering i vattenkraften 9.maj 2019

Page 18: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Potential savings for Statnett

• Saving ~ 30 - 40% by going from preventative to predictive maintenance

• Annual savings by postpone the replacement of a transformer is approx. NOK ~ 0.5 million

The future is electricDigitalisering i vattenkraften 9.maj 2019

Page 19: Smarter Asset Management in Statnett - Energiforsk · The challenges for Asset Management in Statnett Total NOK ~26 mill 19 use case. 3 summer. Students from NTNU ~18 researchers

Åpen informasjon / Public information

Tank you for your attention!