S.M.A.R.T. Project ProposalDecember 9, 2014 Referendum
PROCESS
• January, 2014– Initial meeting of large group; many stakeholders– To review project needs beyond septic• Interest group input• Building Condition Survey 2010
• Met in March, June• Admin group held several meetings to finalize
scope
PROPOSAL
• $6,450,000 Project involving all three instructional buildings.
• Security• Mechanical• Architectural• Reconstruction• Technology
FUNDING
$1,000,000 Debt “falling off” in 2016-2017 $350,000 Local share “falling off”
Approximately $140,000 of Approximately $210,000 local share will be replaced with local share remaining
will Septic Project costs ($4.1m) pay for SMART Project
NO ADDITIONAL OR NEW BUDGET IMPACTNO ADDITIONAL OR NEW TAXES TO FINANCE
HIGH SCHOOL • Boilers and boiler room piping replacement• Gym Air Handling Units replaced• Elevator Replacement• Pool – UV disinfection system; – Filter and plumbing upgrades
• Music Teaching Space (3 practice rooms)• Sports Boosters Concession Stand• Second Floor Teacher Work and Copier space
MIDDLE SCHOOL• Auditorium/Lobby– New ADA bathrooms – Replace doors around Auditorium
• ADA-accessible addition to front of building• Reconfigure Main Office entrance for security• Basement drainage• Ventilation (exhaust) in all crawl spaces• Library climate improvements (fans, window
treatments)• Replace Electrical switchboard and Panel boards
MIDDLE SCHOOL – cont’d
• Walk-in freezer• Tie generator into school to access excess
capacity
TECHNOLOGY BUILDING• New Boiler, piping, controls, water heater
ELEMENTARY SCHOOL
• Translucent/security film on café windows• New locks on café doors • Additional set of doors in entrance hall• Access controls at front doors• Ventilation in crawl spaces• Drainage improvements at upper playground• Time/motion site lighting• Crowd-control fence and entry at Sobus Field
ALL INSTRUCTIONAL BUILDINGS
• UPGRADES TO – Phone, – Clocks, – PA, – Fire systems, – Emergency Lighting– Notification appliances
GROUNDS BUILDING
• Upgrade fire systems to bring to code• Provide illuminated exit signs and emergency
lighting to bring to code
TRANSPORTATION• Replace roll-up doors in work bays• Protect exposed ceiling insulation with non-
combustible
TIMELINE
• December 9, 2014: Referendum– Yes vote leads to 6 month design preparation
• June (late), 2015: Design submittals to State Ed Facilities
• January (late), 2016: Solicitation of bids• February (late), 2016: Bid Awards• Summer 2016: Construction
SUMMARY
• SMART Project proposed at $6.45M• Infrastructure, Security, Safety, ADA, Program• No additional budget/tax impact• December 9, 2014 Referendum• Work planned for Summer 2016
NEXT STEPS
Get out the word for December referendum!