30
SmartPlant Enterprise in Grenland Group The New Vision with SPE Core P2C2 - 2010 Insert Company Logo Here Tonia Pedersen Terje Ørbeck Grenland Group, Norway

Smart Plant Enterprise 2010

Embed Size (px)

Citation preview

Page 1: Smart Plant Enterprise 2010

SmartPlant Enterprise in Grenland Group

The New Vision with SPE Core

P2C2 - 2010

Insert Company Logo Here

Tonia PedersenTerje Ørbeck Grenland Group, Norway

Page 2: Smart Plant Enterprise 2010

Grenland Group

� An experienced oil & gas engineering, procurement and construction company

� Strong customer focus

� Uncompromising attitude in HSE matters

� An attractive employer for highly qualified

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 2 –

� An attractive employer for highly qualified personnel

� 1200 employees in Norway and Asia

Page 3: Smart Plant Enterprise 2010

Business areas

• World leading fabricator of subsea equipment

• NOK 683m in revenues in 2008

• Major supplier of maintenance & modification services to

the Norwegian continental shelf

• NOK 566.5m in revenues in 2008

Grenland Group Fabrication

Grenland GroupOffshore Partner

SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 3 –

• Leading supplier of engineering & procurement services

worldwide

• NOK 402m in revenues in 2008

Grenland Group Solutions

• Grenland Industri: Blue-collar resource company – NOK 137.8m in revenues in 2008

• GGEA: Onshore and offshore electrical & automation services, NOK 64.4m in revenues in 2008

Independent Subsidiaries

Page 4: Smart Plant Enterprise 2010

GLOBAL ENGINEERING

GG locations

GG representative Offices

Oslo

Drammen

Tønsberg

Stokke

Sandefjord

Langesund

Stathelle

Skien

SmartPlant Enterprise – Experience The Power– 4 –

HoustonNingbo/Shanghai, China

Kuala Lumpur

Szczecin, Poland

��

� Korea

Mexico�Qatar

�Spain

Aberdeen

India

Brasil

�Egypt

Skien

Porsgrunn

Notodden

Skudeneshavn

Stavanger

Harstad

��

November 3, 2010

Page 5: Smart Plant Enterprise 2010

Design & studies

� Rig design, Semisubmersible’s & Drillship design

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 5 –

Page 6: Smart Plant Enterprise 2010

Design studies

� Well intervention Equipment & Products

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 6 –

Page 7: Smart Plant Enterprise 2010

EXISTING CAD SYSTEM IN GG, 2006

� Complicated CAD Picture

� To many CAD/ Design system

� Innefficient data sharing

PDMS 3D MODELLING PIP/STR.

TEKLA-XSTEEL STRUCTURE

SMARTPLANT INSTRUMENTATION

PLANTSPACE - PIPING

PDS - PIPING

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 7 –

� Difficult to support all projects/ end users

� Key business driver to identify ’one’-system which could improve this picture dramatically

MICROSTATION

PLANTSPACE - PIPING

AUTOCAD

PROSESS. - manuel

MANUEL SYST.

EXCEL

Page 8: Smart Plant Enterprise 2010

Consolidated with SmartPlant Enterprise

DISIPLINE TOOLS

Pip

ing

Sm

artP

l 3D

Stru

ktu

r

Sm

artP

l 3D

Pro

sess

Sm

artPl P

&ID

Elec|tro

/Instr

Sm

artPl In

str.

Hvac

Sm

artPl 3D

Mech

an

ical

So

lid m

od

elling

Solid 2D/Review

Dra

ugh

ting

Sm

artS

ketch

DN

V

Na

uticu

s/Sesa

n

Intellish

ip

Ana

lysis

Sm

p R

eview

Sm

p M

ark

up

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 8 –

Sm

artPl P

&ID

Sm

artPl In

str.

So

lid m

od

elling

IFS

Financial

IFS

ProjectIFS

Purchasing

Sm

p M

ark

up

HIDOC

DOCUMENT

MANAGEMENT

SMARTPLANT FOUNDATION

Page 9: Smart Plant Enterprise 2010

A New Focus with SPE Core

SPE Core /

SmartPlant

Foundation

. Tag Register

. Doc Register

. Reporting Tool

Sm

artP

lant

Des

ign

Tool

s

Customer Systems

SmartMarine/SmartPlant 3D

SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 9 –

. Workflow

. Progress

. Asset Register

Sm

artP

lant

Des

ign

Engineering to Order and Project

Delivery

IFS

Lotus Notes

HiDoc

SmartPlant Electrical

SmartPlant Instrumentation

SmartPlant P&ID

Page 10: Smart Plant Enterprise 2010

Projects with SPE Core

� Åsgard Swivel, October 2010-present

Complete replacement of existing offshore swivel for

Åsgard A.

� Disciplines: Piping, Structural, Electro, Process,

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 10 –

Instrumentation

� Deliveries: Piping Isometrics, Piping MTO, Weight & CoG data,

client procurement data, Structural Arrangements & Detail

manufacturing drawings. Tag Master List, Tag-Document and

Tag-Tag relationships.

Page 11: Smart Plant Enterprise 2010

Projects with SPE Core

� Gullfaks B, June 2010-present

Upgrade of water injection unit for Gullfaks B

� Disciplines: Process, Piping, Structural, Electro, Instrument,

HVAC

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 11 –

� Deliverables: Delivery P&ID Drawing, Linelist, Valvelist,

Equipment list, Piping Isometrics, Piping MTO, Piping &

Layout Arrangement drawings, Structural Arrgt . Drawings,

Structural Foundation Drawings. Tag Master List, Tag-

Document and Tag-Tag relationships.

Page 12: Smart Plant Enterprise 2010

SPF/SPE "In Use"

� Type Hierarchies

� Plant Break Down Structure

� Tag Type Hierarchy

� Document Type Hierarchy

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 12 –

� Classification Types

Page 13: Smart Plant Enterprise 2010

SPF/SPE "In Use"

� Configuration Spreadsheets

� Plant Break Down Structure

� Tag Type Hierarchy

� Document Type Hierarchy

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 13 –

� User Access

Page 14: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Registry

� Central registry of all tags for each project.

� Central tag creation point for SmartPlant tools

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 14 –

� tag hierarchy reflects the individual tool

requirements for tag typing.

Page 15: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Data Loading Spreadsheets

� Bulk Tag Loading

� Easy to configure

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 15 –

Page 16: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Publish

� SPE supports tag publish

to the SmartPlant tools.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 16 –

Page 17: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Retrieve

� SPE published tags are

correlated with the tags

retrieved from Tools

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 17 –

Page 18: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Inconsistency Checking

� Central Tag Registry with ”Shared Objects” provides for easier checking of

tag data across disciplines.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 18 –

Page 19: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Document Registry

� SmartPlant Foundation updated regularly with Document meta data from

HiDoc via XML load files.

� HiDoc : central document

registry for transmittals

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 19 –

� SPF: tag-document

relationship registry

Page 20: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag - Document Linking

� SmartPlant published documents

incorporate tag-document links.

� Drag and Drop supported within

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 20 –

SPE Core between SPX Tags

and SPX Documents.

� Tag – Document relationship

report from SPF.

Page 21: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Published Document Workflow� HiDoc is updated with approved engineering documents via workflow.

� Published documents to be sent on

transmittal are first approved using a

SPF workflow step

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 21 –

� Approved documents are output via

SPE Core ’internal transmittal’

workstep for retrieval by HiDoc.

Page 22: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Engineering Data Reporting� Bringing together engineering tag data

� Tag data distributed across

SmartPlant domains.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 22 –

� Shared Object references

’Last-In’ data

Page 23: Smart Plant Enterprise 2010

Short Term

� Full integration of tags between SPE and SPF and SmartPlant Tools

� Asset Managment

� Tag – Asset linking and reporting

SPF/SPE ”Next Steps"

SmartPlant Enterprise – Experience The Power

� More comprehensive tag data reporting from SPF

November 23, 2010 – 23 –

Page 24: Smart Plant Enterprise 2010

SPF/SPE ”Next Steps"

Longer Term

� ENS management of tags and documents in SPF

� Central Document Registry

� Document Transmittal

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 24 –

� Document Progress

Page 25: Smart Plant Enterprise 2010

Grenland Group can compete in a ”higher engineering division”.

� Centralized tag registry

� Tag – Document management

Benefits

SmartPlant Enterprise – Experience The Power

� Tag – Document management

� Centralized documentmanagement

November 23, 2010 – 25 –

Page 26: Smart Plant Enterprise 2010

� Workflow management

� End-User Access

� SPE Worksheets

Benefits (cont..)

� Transmittals

� ENS Management

� Asset Management

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 26 –

Page 27: Smart Plant Enterprise 2010

Challenges

� Integration between SPF and the Tools is crucial for a central tag registry.� Currently integration does not exist for all tag types for the ’ootb’ applications

� This is an ’Off the Shelf System’. � Require in-house configuration according to company standards.

� Requires time to determine what is ’Out of the Box’

� What is required to be configured to ensure an ’up and running’ system.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 27 –

� Each tool requires a talented Administrator� Require much more knowledge in IT (operating system, networking and databases)

� Still require good engineering knowledge

� Positive ’can-do’ attitude

� Management Support� Support for time and resources is essential

� This is not a tool that is immediately ’up and running’ after installation

Page 28: Smart Plant Enterprise 2010

Challenges (cont..)

� Communication and Training� Effective communication channels

� Between tool administrators and between administrators and end-users

� End-user training of tools and work processes

� This is a new approach to engineering and is confronting for some engineers.

� Testing� Easy to introduce problems.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 28 –

� Easy to introduce problems.

� Remember this is an integrated system

� Change Management� Configuration and data dictionary changes must be co-ordinated and managed

� Work Process Management� Determining a effective engineering work processes

� Managing exceptions to the defined work processes

Page 29: Smart Plant Enterprise 2010

� This is a vision we believe in!

� And although we face many challenges….

If you start such a project and want to succeed:

LAST WORDS…..

SmartPlant Enterprise – Experience The Power

� Be prepared to stick your head out

� Be ready for a ’fight’!

� Never give up!!

November 23, 2010 – 29 –

Page 30: Smart Plant Enterprise 2010

”ONE TEAM-ONE SYSTEM”ALL WINNERS

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 30 –

www.grenlandgroup.com Thank youTonia Pedersen / Terje ØrbeckGrenland Group