20
Smart Gas Metering Project European Utility Week 2014 11/06/2014 Smart Gas Metering Project

Smart Gas Metering Project - Engerati.com Isabelle... · Conclusion : ... J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S ... 19 Smart Gas

Embed Size (px)

Citation preview

Smart Gas Metering Project

European Utility Week 2014

11/06/2014 Smart Gas Metering Project

2

Sommaire

11/06/2014 Smart Gas Metering Project

  Introduction : Project and last news

Hardware Status

Pilot Preparation

Dialogue with Stakeholders

Conclusion : Towards a Smarter Network

A Project Driven by Energy Efficiency Goals

11/06/2014 Smart Gas Metering Project 3

To the benefit of 11 million customers (households, small-business, municipalities)

Optimise distribution network Modernization and performance of gas distribution network

Improve invoicing quality and customer satisfaction

Invoicing based on actual consumption data

Improve Energy Management More frequent consumption data A B C D E F G A

B C D E F G

Gas Meter + radio module

Fixed radio Network

Data Concentrator GPRS network

National data collection and management

system

A simple, robust & reliable solution

3 major goals

Operator

Smart Gas Metering Project

Project Timeline

2010 2011 2012 2013 2014 2015 2016 2017 … 2022

Experimentation Framework setting Construction Roll-out pilot Mass roll-out

Test  Communica.on  chain  construc.on  

IS  construc.on  

Roll-­‐out  decision  

Change  management  and  communica.on  Mass  roll-­‐out  Roll-­‐out  

pilot  Roll-­‐out  prepara.on  

Equipment  produc.on  

Communica.on  chain  design  

Construc.on  decision  

Roll-­‐out  decision  confirmed  

End  

Change  management  se=ng  

IS  design  

Roll-­‐out  se=ng  

Today  

Local  dialogue  

 Mass  roll-­‐out  

Experimenta.ons  

4 11/06/2014

Project News

11/06/2014 Smart Gas Metering Project

A Project Confirmed by Recent Public Decisions

REGULATOR DECISION GOVERNMENT DECISION

July 2014 September 2014

French Energy Regulator (CRE) decision defining financing modalities and

incentive regulation

Comparisons

October, 1st 2014

Publication of the decision on the Official Journal (OJ)

OFFICIAL JOURNAL

Energy Transition Law : New Functionalities

Consumption alerts

The Energy Transition for Green Growth law is currently being discussed by the French Parliament. It requires DSO to put in place two new functionalities which weren’t foreseen in the first draft of the Project

Final roll-out decision taken by the Ministers of Economy

and Energy

5

Main Principles of Incentive Regulation

11/06/2014 Smart Gas Metering Project

Planning

Total CAPEX (without IS)

Performance

IS CAPEX

OPEX

Before mass roll-out

During mass roll-out After

Initial bonus on equipment ROI rate, only until theoric end

of roll-out

Min

imum

RO

I at

WA

CC

of D

istri

butio

n ra

te

Biennial penalty (until theoric end) then annual (during 2

years max) in case of delay

Yearly bonus / penalty if reduction or drift of total

CAPEX

Yearly bonus / penalty if performance exceeds or doesn’t reach expectations

Yearly bonus / penalty if reduction or drift

Integration of IS CAPEX within future distribution tariff incentive mecanisms

for budget compliance

Comparison between distribution tariff and Project budget during tariff negotiations

6

Incentives on

7

Sommaire

11/06/2014 Smart Gas Metering Project

Introduction : Project and last news

  Hardware Status

Pilot Preparation

Dialogue with Stakeholders

Conclusion : Towards a Smarter Network

Innovation & Contribution to Standardization Process Reminder of the motto : Keep it simple and robust

Two way communication but without expensive and energy hungry features such as : - In Home Display - Shut-off valve

Simple RF architecture :

- No repeaters - No RF Acknowledge - transmission layer based on the French proposal (2009) now part of the EN13757 standard

Simple but efficient Security : - End to End AES128 Encryption (Meter<-> Information System) - AES128 Authentication (Meter <-> data Concentrator) - TLS (data concentrator <-> Information system) - Security proposal sent (2012) to TC294 (EN13757 WG4)

11/06/2014 Smart Gas Metering Project 8

Innovation & Contribution to Standardization Process Contribution to standardization process : What is going on today

New work item proposal to TC294/WG4 will focus on the following content : - Improvement of the reliability of the transfer of a large volume data (e. g : firmware download) by the introduction of an error correcting process so called Reed Solomon. - Channel management optimization in relevant modes. - Optimization of addressing method for large volume of data transfer (e. g: broadcast addressing, timing). - High density situation and large volume of data transfer optimization through a better use of the spectrum. - Transmitted power adjustment 11/06/2014

Smart Gas Metering Project 9

European Request for Tender for AMR Devices A long but efficient process

Started in December 2012 with the Request For Information published in the Official Journal of the European Union. Ended with the contract signature in March 2014. Contracts awarded :

For ‘smart meters’ : AEM-Sagemcom, Dresser-Diehl Metering, Itron

For Remote RF device : Diehl Metering, Sagemcom

For Data concentrator : Kerlink, Sagemcom The final price is compliant with the Business Case published by the French Energy Regulator

11/06/2014 Smart Gas Metering Project 10

Project Status on the Hardware Point of View On tracks despite a very demanding schedule !

- Design phase now ended - Development phase launched - Mock-ups of the devices received during the summer - Prototypes with 80% of the functionnalities have been received this fall. - Final prototypes expected during the spring next year 11/06/2014

Smart Gas Metering Project 11

12

Sommaire

11/06/2014 Smart Gas Metering Project

Introduction : Project and last news

Hardware Status

  Pilot Preparation

Dialogue with Stakeholders

Conclusion : Towards a Smarter Network

Smart Gas Metering Project

Roll-out Pilot Saint  Brieuc  18  communes  

Lyon    Arr.  4,  Arr.  9,  Caluire  et  Cuire  

Hauts-­‐de-­‐Seine  Puteaux,  Nanterre,  Rueil-­‐Malmaison  

Le  Havre  

 

Pilot Planning 2015 2016 2017

Test  

Mass  roll-­‐out  

GrDF  Pilot  C.  –  S.  Pilot  

150 000 meters

50 concentrators

24 pilot municipalities

GrDF Pilot: 8 months to validate internal roll-out processes, data collection quality and IS performance.

Customer - Supplier Pilot: 4 months to validate end-to-end performance of the communication infrastructure until consumption data delivery to consumers & suppliers

11/06/2014 13

EU Tenders for Meters and Concentrators Installation

11/06/2014 Smart Gas Metering Project 14

Projet Compteurs Communicants Gaz

2014 2015 2016 2017 2018 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M

Consulta.on  and  award  

EUOJ   Ramp-­‐up  Consulta.on  and  award  

EUOJ   Ramp-­‐up  Consulta.on  and  award  

Tender 1

Tender 2

Tender 3

Ramp-­‐up  EUOJ  

01/10 Launch of the consultation

Consulta.on  and  award  

Award of contracts

Ramp-­‐up  

Operator

10% of meters

60% of meters

30% of meters

100% of concentrators

15

Sommaire

11/06/2014 Smart Gas Metering Project

Introduction : Project and last news

Hardware Status

Pilot Preparation

  Dialogue with Stakeholders

Conclusion : Towards a Smarter Network

Mas

s R

oll-o

ut

A Concerted Project Since its Launch

11/06/2014 Smart Gas Metering Project 16

With various stakeholders

Stakeholders

French Government and

regulations

Framework definition

experimentations, dialogue &

business case

CRE Technical & Economical Study together

with GrDF

Construction specifications, deployment

preparation and business case

update

Technical & Economical

Study Update

CRE decisions 2011/07/21

Construction Launch

Strong expectations

of meter-reading modern-isation

EU directives +

French Gvt Policies

Mass roll-out decisions mid 2013

CRE and associated stakeholders Gas suppliers

Local Authorities

Consumer associations

Other stakeholders Employees’ representatives

CRE decisions 2009/09/3 Production Pilot

local stakeholders

dialogue Roll-out preparation

Confirmation of the roll-out

decisions Publication on

the OJ 10/2014

Smart Gas Metering Project

A Dialogue led on the 4 Pilot Areas

Local Dialogue Objectives §  Improve roll-out and customer

relation processes efficiency and accuracy

§  Educate customers on how to use consumption data to reach energy savings objectives Main output: Roll-out Communication Kit to be provided after the pilot to all local stakeholders in France to facilitate the mass roll-out

Saint  Brieuc  18  communes  

Lyon    Arr.  4,  Arr.  9,  Caluire  et  Cuire  

Hauts-­‐de-­‐Seine  Puteaux,  Nanterre,  Rueil-­‐Malmaison  

Le  Havre  

 

Various participants

11/06/2014 17

Local Authorities

Licencing authorities

Social landlords

Suppliers

Pro Consumers and renters associations

Gas industry Public Institutions

18

Introduction : Project and last news

Hardware Status

Pilot Preparation

Dialogue with Stakeholders

  Conclusion : Towards a Smarter Network

Sommaire

11/06/2014 Smart Gas Metering Project

Hydrolysis

Methanisation

Gasification

BiomassCHP

Geothermalsink

Boiler

Gastransport system

Electric transport system

Hydro power

Wind turbines

PV panelsElectricitydemand

Gasdemand

Heatdemand

Gasstorage

Territory levelSmart pipes

Smart grids

District heating

The smart gas grid part of a wider smart networks project

Affordable future will be made of the combination of energies, uses and networks.

11/06/2014 19 Smart Gas Metering Project

Thank you

11/06/2014 Smart Gas Metering Project 20