2
Sommaire
11/06/2014 Smart Gas Metering Project
Introduction : Project and last news
Hardware Status
Pilot Preparation
Dialogue with Stakeholders
Conclusion : Towards a Smarter Network
A Project Driven by Energy Efficiency Goals
11/06/2014 Smart Gas Metering Project 3
To the benefit of 11 million customers (households, small-business, municipalities)
Optimise distribution network Modernization and performance of gas distribution network
Improve invoicing quality and customer satisfaction
Invoicing based on actual consumption data
Improve Energy Management More frequent consumption data A B C D E F G A
B C D E F G
Gas Meter + radio module
Fixed radio Network
Data Concentrator GPRS network
National data collection and management
system
A simple, robust & reliable solution
3 major goals
Operator
Smart Gas Metering Project
Project Timeline
2010 2011 2012 2013 2014 2015 2016 2017 … 2022
Experimentation Framework setting Construction Roll-out pilot Mass roll-out
Test Communica.on chain construc.on
IS construc.on
Roll-‐out decision
Change management and communica.on Mass roll-‐out Roll-‐out
pilot Roll-‐out prepara.on
Equipment produc.on
Communica.on chain design
Construc.on decision
Roll-‐out decision confirmed
End
Change management se=ng
IS design
Roll-‐out se=ng
Today
Local dialogue
Mass roll-‐out
Experimenta.ons
4 11/06/2014
Project News
11/06/2014 Smart Gas Metering Project
A Project Confirmed by Recent Public Decisions
REGULATOR DECISION GOVERNMENT DECISION
July 2014 September 2014
French Energy Regulator (CRE) decision defining financing modalities and
incentive regulation
Comparisons
October, 1st 2014
Publication of the decision on the Official Journal (OJ)
OFFICIAL JOURNAL
Energy Transition Law : New Functionalities
Consumption alerts
The Energy Transition for Green Growth law is currently being discussed by the French Parliament. It requires DSO to put in place two new functionalities which weren’t foreseen in the first draft of the Project
Final roll-out decision taken by the Ministers of Economy
and Energy
5
Main Principles of Incentive Regulation
11/06/2014 Smart Gas Metering Project
Planning
Total CAPEX (without IS)
Performance
IS CAPEX
OPEX
Before mass roll-out
During mass roll-out After
Initial bonus on equipment ROI rate, only until theoric end
of roll-out
Min
imum
RO
I at
WA
CC
of D
istri
butio
n ra
te
Biennial penalty (until theoric end) then annual (during 2
years max) in case of delay
Yearly bonus / penalty if reduction or drift of total
CAPEX
Yearly bonus / penalty if performance exceeds or doesn’t reach expectations
Yearly bonus / penalty if reduction or drift
Integration of IS CAPEX within future distribution tariff incentive mecanisms
for budget compliance
Comparison between distribution tariff and Project budget during tariff negotiations
6
Incentives on
7
Sommaire
11/06/2014 Smart Gas Metering Project
Introduction : Project and last news
Hardware Status
Pilot Preparation
Dialogue with Stakeholders
Conclusion : Towards a Smarter Network
Innovation & Contribution to Standardization Process Reminder of the motto : Keep it simple and robust
Two way communication but without expensive and energy hungry features such as : - In Home Display - Shut-off valve
Simple RF architecture :
- No repeaters - No RF Acknowledge - transmission layer based on the French proposal (2009) now part of the EN13757 standard
Simple but efficient Security : - End to End AES128 Encryption (Meter<-> Information System) - AES128 Authentication (Meter <-> data Concentrator) - TLS (data concentrator <-> Information system) - Security proposal sent (2012) to TC294 (EN13757 WG4)
11/06/2014 Smart Gas Metering Project 8
Innovation & Contribution to Standardization Process Contribution to standardization process : What is going on today
New work item proposal to TC294/WG4 will focus on the following content : - Improvement of the reliability of the transfer of a large volume data (e. g : firmware download) by the introduction of an error correcting process so called Reed Solomon. - Channel management optimization in relevant modes. - Optimization of addressing method for large volume of data transfer (e. g: broadcast addressing, timing). - High density situation and large volume of data transfer optimization through a better use of the spectrum. - Transmitted power adjustment 11/06/2014
Smart Gas Metering Project 9
European Request for Tender for AMR Devices A long but efficient process
Started in December 2012 with the Request For Information published in the Official Journal of the European Union. Ended with the contract signature in March 2014. Contracts awarded :
For ‘smart meters’ : AEM-Sagemcom, Dresser-Diehl Metering, Itron
For Remote RF device : Diehl Metering, Sagemcom
For Data concentrator : Kerlink, Sagemcom The final price is compliant with the Business Case published by the French Energy Regulator
11/06/2014 Smart Gas Metering Project 10
Project Status on the Hardware Point of View On tracks despite a very demanding schedule !
- Design phase now ended - Development phase launched - Mock-ups of the devices received during the summer - Prototypes with 80% of the functionnalities have been received this fall. - Final prototypes expected during the spring next year 11/06/2014
Smart Gas Metering Project 11
12
Sommaire
11/06/2014 Smart Gas Metering Project
Introduction : Project and last news
Hardware Status
Pilot Preparation
Dialogue with Stakeholders
Conclusion : Towards a Smarter Network
Smart Gas Metering Project
Roll-out Pilot Saint Brieuc 18 communes
Lyon Arr. 4, Arr. 9, Caluire et Cuire
Hauts-‐de-‐Seine Puteaux, Nanterre, Rueil-‐Malmaison
Le Havre
Pilot Planning 2015 2016 2017
Test
Mass roll-‐out
GrDF Pilot C. – S. Pilot
150 000 meters
50 concentrators
24 pilot municipalities
GrDF Pilot: 8 months to validate internal roll-out processes, data collection quality and IS performance.
Customer - Supplier Pilot: 4 months to validate end-to-end performance of the communication infrastructure until consumption data delivery to consumers & suppliers
11/06/2014 13
EU Tenders for Meters and Concentrators Installation
11/06/2014 Smart Gas Metering Project 14
Projet Compteurs Communicants Gaz
2014 2015 2016 2017 2018 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
Consulta.on and award
EUOJ Ramp-‐up Consulta.on and award
EUOJ Ramp-‐up Consulta.on and award
Tender 1
Tender 2
Tender 3
Ramp-‐up EUOJ
01/10 Launch of the consultation
Consulta.on and award
Award of contracts
Ramp-‐up
Operator
10% of meters
60% of meters
30% of meters
100% of concentrators
15
Sommaire
11/06/2014 Smart Gas Metering Project
Introduction : Project and last news
Hardware Status
Pilot Preparation
Dialogue with Stakeholders
Conclusion : Towards a Smarter Network
Mas
s R
oll-o
ut
A Concerted Project Since its Launch
11/06/2014 Smart Gas Metering Project 16
With various stakeholders
Stakeholders
French Government and
regulations
Framework definition
experimentations, dialogue &
business case
CRE Technical & Economical Study together
with GrDF
Construction specifications, deployment
preparation and business case
update
Technical & Economical
Study Update
CRE decisions 2011/07/21
Construction Launch
Strong expectations
of meter-reading modern-isation
EU directives +
French Gvt Policies
Mass roll-out decisions mid 2013
CRE and associated stakeholders Gas suppliers
Local Authorities
Consumer associations
Other stakeholders Employees’ representatives
CRE decisions 2009/09/3 Production Pilot
local stakeholders
dialogue Roll-out preparation
Confirmation of the roll-out
decisions Publication on
the OJ 10/2014
Smart Gas Metering Project
A Dialogue led on the 4 Pilot Areas
Local Dialogue Objectives § Improve roll-out and customer
relation processes efficiency and accuracy
§ Educate customers on how to use consumption data to reach energy savings objectives Main output: Roll-out Communication Kit to be provided after the pilot to all local stakeholders in France to facilitate the mass roll-out
Saint Brieuc 18 communes
Lyon Arr. 4, Arr. 9, Caluire et Cuire
Hauts-‐de-‐Seine Puteaux, Nanterre, Rueil-‐Malmaison
Le Havre
Various participants
11/06/2014 17
Local Authorities
Licencing authorities
Social landlords
Suppliers
Pro Consumers and renters associations
Gas industry Public Institutions
18
Introduction : Project and last news
Hardware Status
Pilot Preparation
Dialogue with Stakeholders
Conclusion : Towards a Smarter Network
Sommaire
11/06/2014 Smart Gas Metering Project
Hydrolysis
Methanisation
Gasification
BiomassCHP
Geothermalsink
Boiler
Gastransport system
Electric transport system
Hydro power
Wind turbines
PV panelsElectricitydemand
Gasdemand
Heatdemand
Gasstorage
Territory levelSmart pipes
Smart grids
District heating
The smart gas grid part of a wider smart networks project
Affordable future will be made of the combination of energies, uses and networks.
11/06/2014 19 Smart Gas Metering Project