21
Smart Fenders A Long Over Due Revolution PIANC Congress 2014 Presented By Johnny Qiu Zalda Technology Corporation

Smart Fenders A Long Over Due Revolution

Embed Size (px)

DESCRIPTION

Smart Fenders A Long Over Due Revolution. PIANC Congress 2014 Presented By Johnny Qiu Zalda Technology Corporation. Fendering Since 1950s. Smart Fenders – The Vision. THE FUTURE IS FINALLY HERE !. How To Build Smart Fenders. Internal Installation Scheme For New Fenders. - PowerPoint PPT Presentation

Citation preview

Page 1: Smart Fenders A Long Over Due Revolution

Smart Fenders A Long Over Due Revolution

PIANC Congress 2014

Presented By Johnny QiuZalda Technology Corporation

Page 2: Smart Fenders A Long Over Due Revolution

Fendering Since 1950s

Invention of Engineered Fenders• Definition of fender – A means for controlled release of berthing kinetic energy• Makeshift solutions prior to engineered fenders• Invention of engineered fenders

Innovations 1950s – 1980s• 30 years of development process centered around compression rate• Square – Trapezoidal – Arch – Element• Cylindrical – Cell – Cone – Stacked Cone

Technical Stalemate Since 1980s• Frontier technology of the 1950s• Lack of significant technical development since 1980s• Technical Stalemate, lack of data, single purpose, generic design and products

Page 3: Smart Fenders A Long Over Due Revolution

Smart Fenders – The Vision

Exploration of Fender Potentials• Location Advantage – Unique Waterfront Location• Carrier of Ship - Dock Interaction• Basic Fender Functions – Better Protecting Ships and Docks

Directions of Smart Fender Development• Reinvent An Age Old Product with New Technologies • Expanded & Diversified Functions and Possibilities of Individuation • Generate Values with Services and Information

A Long Over Due Revolution

THE FUTURE IS FINALLY HERE !

Page 4: Smart Fenders A Long Over Due Revolution

How To Build Smart Fenders

Inertial Guidance & Multi Layer Positioning Technology

Conventional Fender System + Positioning Hardware (PSU)

Central Software On PC (CS) To Process Positioning Data

Rendering Fender 3D Model In PC

Further Data Analysis To Generate Warnings and Alarms

PSU are mounted on predetermined locations on

fender frontal structure

CS generates dynamic 3D model of the fender system along with its motion characteristics, based on position and heading of PSU

With motion data, CS generates fender related warnings, alarms,

and analysis using fender engineering and design principles

Page 5: Smart Fenders A Long Over Due Revolution

Smart Fenders - InstallationInternal Installation Scheme For New Fenders

External Installation Scheme For Existing Fenders

Page 6: Smart Fenders A Long Over Due Revolution

Smart Fenders - Graphic User Interface

Fender System View Window

• Monitoring details of one particular fender system• Five real time 2D views of the fender system • Real time 3D view of the fender system• Comprehensive data - warning table• Integrated ER curve view• Fender system navigation window

Berth Overview Window

• Birdseye view of a marine terminal and its Smart Fender status

Historical Data Replay & Impact Distribution Graph

Page 7: Smart Fenders A Long Over Due Revolution

Smart Fenders – New Era, New Objectives

Reduce Fender Related Costs

• Prevent Fender Related Dock - Ship Structural Damages• Minimize Unexpected Fender Maintenance • Prevent Fender Permanent Damages

Provide Real Time Accident - Damage Alarms

• Berthing Accident Alarm• Fender Damage Alarm• Instant Alarms with Supporting Data Across Multiple Platform

New Approach To Fender Design

• Data Based Fender Asset Reconfiguration And Redistribution• "Impact Distribution Based" Fender System Design Standard ?

Page 8: Smart Fenders A Long Over Due Revolution

Collect Berthing Impact Base Data• Fender Development• Berthing / Navigation Practice Study• Structural Fatigue Studies

Building A Platform with Fender System

• The Smart Waterfront System

Cost and Operational Realistic Technology

• No dramatic Increase In Fendering Costs• Low Maintenance and Zero Effect on Harbor Operation

Smart Fenders – New Era, New Objectives

Page 9: Smart Fenders A Long Over Due Revolution

Smart Fenders – The Interactive FenderFender Design Weakness Warnings

• Preemptive Fender Design Improvement

Imminent Fender Failure Warnings

• Preemptive Fender Maintenance

Instant Berthing Accident / Fender Damage Alarms

• The Information Technology Approach

3D Fender Motion Monitoring & Permanent Database

• The Ship – Dock Impact Black Box

Page 10: Smart Fenders A Long Over Due Revolution

Smart Fenders – Reducing Costs

Reducing Fender Related CostsAddress The Causes Of Fender Related Costs

Page 11: Smart Fenders A Long Over Due Revolution

Smart Fenders – Transparent Fendering

Page 12: Smart Fenders A Long Over Due Revolution

Smart Fenders – Total Understanding, Better Design

New Approach To Fender Design

• Impact Distribution Graph & Historical Data Replay• Easily Answer “Necessities” Questions• Definitively Answer “Cause” Questions

Unveil Mysteries Of Fender Design

• Fender System Reconfiguration• Fender Asset Redistribution• Follow The Trends To See The Future

Impact Distribution Based Fender Design

Page 13: Smart Fenders A Long Over Due Revolution

Ship Berthing Contact Velocity Vix -- The initial

movement speed reading of the first

fender system contacted by the ship

during a berthingShip Berthing Impact

Kinetic Energy Amplitude Es is

calculated based on Measured Vix and

known ship and dock characteristics

If calculated ship berthing kinetic energy exceeds berth fender

system design capacity, berthing energy

amplitude alarm will be triggered

Smart Fender will trigger a fender design

energy capacity warning if :

--- Measured ship berthing energy

frequently approaches design value

--- Fender compression frequently approaches rated fender deflection

Smart Fenders Explained – Energy Warnings & Alarms

Whereas W: ship loaded mass V: MEASURED ship berthing configuration velocity Vix Ce: ship eccentric coefficient Cm: ship mass coefficient Cs: ship softness coefficient Cc: berth configuration factor

Page 14: Smart Fenders A Long Over Due Revolution

Smart Fenders Explained – Reaction & Structural Impact Alarm

BIM monitors compression displacements of all fender elastomers and interpolates their real time reaction forces using their C-RE curve

Instantaneous Berthing Impact Load RT = total fender reaction force of all fender elastomers compressed by the berthing ship

If RT reaches or frequently approaches preset berth structural limit, Smart Fender will trigger Berth Structural Load Alarm

Page 15: Smart Fenders A Long Over Due Revolution

Smart Fenders Explained – Data Based Fender Design

Fender Side Motion (Y Axis ) Historical Data:Easily determining if a fender system needs shear chain on one side, both sides, or none at all.

Fender Compression Motion (X Axis) Historcal Data:Berthing Impact Distribution is uneven along the berth. Therefore it is clearly unreasonable to distribute fender asset evenly.

Optimize Fender Components Using Data Approach

• Fender Elastomer• Shear Chain / Weight Chain / Tension Chain• Fender Frontal Structure• ETC

Preemptive Fender Design Optimization

• Prevent Fender System Permanent Damage• Prevent Damage to Ship and Dock Structures Due to Insufficient Fender Design.

Page 16: Smart Fenders A Long Over Due Revolution

Smart Fenders Explained – Imminent Failure Warning

By tracking long term trend of fender

static posture and general compression range, Smart Fender can predict fender

failure when fender deterioration

reaches critical level.

This allows preemptive preventive

maintenance to be preformed at

chosen time frame, to avoid costly

adverse influence to terminal operation due to unexpected

fender maintenance

Page 17: Smart Fenders A Long Over Due Revolution

• First Major Smart Fender Project In The World• 12 Fender System Project In East Asia Installed On March, 2011• Smart Fender System On 8 Main Fender Systems And 2 Auxiliary

Fender Systems• Each Main Fender System Has Two Off I 1000x2000l S2 ( ER=

76.8tm / 166.8t @ 57.5% ) And One Off 3150x2750x320 Fender Panel, With No Restraining Devices

• On Each Fender Panel, Four PSU Modules, One LIS Module, And One Auxiliary Battery Module Were Installed Using Internal Installation Scheme

• A Generic PC Workstation ( Intel I 3 / 1GB / 500 GB / Win 7 ) As Smart Fender System Central Station

Smart Fenders – Case Study YHL 1103

General Information

Page 18: Smart Fenders A Long Over Due Revolution

• 14 Berthing Speed Alarms Since Mar. 2011 • 40+ Fender Lateral Movement Alarms Since Mar. 2011• 2 Low Impact Alarms Since Sept. 2011• 10+ Angle Alarms Since June, 2011• Fender Design Weakness Warnings On Insufficient Fender

Energy Capacity And Insufficient Restraints. Berthing Practice Change Recommended and Adopted. Preemptive Design Optimization Performed With I 1000x2000 H2.

• Fender 3D Berthing & Fatigue Motion Statistics & IDG• Multiple Improvements Made To Smart Fender Design

Smart Fenders – Case Study YHL 1103

Achievements

Page 19: Smart Fenders A Long Over Due Revolution

Smart Fenders – Background

Based on Zalda MMCS Platform

• Network Monitoring - Automation Platform for Marine Applications• 10+ Marine / Highway Applications Developed• Seamless Integration with MLM / BSM / ACM

A Part of Berthing Impact Monitoring Technology ( BSM )

• Smart Fender System • Smart Pile System • Ship Accidental Drift Monitoring • Dock Seismic Monitoring

Page 20: Smart Fenders A Long Over Due Revolution

Smart Fender Head - A Platform of Possibilities

The Smart Waterfront System – An Integral Part of Smart Harbor

Fender Warning Light / Navigational & General Purpose Lighting

Waterfront Wireless Networking Infrastructure

Environmental / Hydrology Sensor Hub

Development Of “Accident Preventive" Berthing Impact Threshold Set

Base Data For Fender Development & Structural - Navigational Studies

Real Time Dock Structural FEA ?

The Smart Waterfront System – An Integral Part of Smart Harbor

YOUR APPLICATION HERE

YOUR APPLICATION HERE

YOUR APPLICATION HERE

YOUR APPLICATION HERE

YOUR APPLICATION HERE

YOUR APPLICATION HERE

Page 21: Smart Fenders A Long Over Due Revolution

BIM Development TeamJohnny Qiu – Author, Original Concept / Functionality / GUI Design

Wei Yu – Co-author, System Design, Software ProgrammingGuoping Tang – Hardware & Mechanical Design

Weimin Xia – Software ProgrammingCuiping Jin – Fender Integration Design

COPRI / PIANC PORTS 2013 PIANC World Congress 2014Aug. 25-Aug. 28. 2013 June 1 – June 5, 2014Sheraton Seattle Hotel San Francisco Marriott Marquis1400 Sixth Avenue 55 Fourth StreetSeattle, WA 98101, USA San Francisco, California 94103

Contact Information

Zalda Technology Integrated Solutions for Berthing, Fendering, and Mooring

2488 Technology Dr.Hayward, CA 94545-4867

T. +1 510-783-4910F. +1 510-783-1897

W. www.zaldatechnology.com/BIM.htmlE. [email protected]

Thank You !