Upload
soni
View
219
Download
0
Embed Size (px)
Citation preview
8/10/2019 Smart Contracting Nuts and Bolts
1/161
8/10/2019 Smart Contracting Nuts and Bolts
2/161
8/10/2019 Smart Contracting Nuts and Bolts
3/161
8/10/2019 Smart Contracting Nuts and Bolts
4/161
8/10/2019 Smart Contracting Nuts and Bolts
5/161
8/10/2019 Smart Contracting Nuts and Bolts
6/161
8/10/2019 Smart Contracting Nuts and Bolts
7/161
8/10/2019 Smart Contracting Nuts and Bolts
8/161
8/10/2019 Smart Contracting Nuts and Bolts
9/161
8/10/2019 Smart Contracting Nuts and Bolts
10/161
8/10/2019 Smart Contracting Nuts and Bolts
11/161
8/10/2019 Smart Contracting Nuts and Bolts
12/161
8/10/2019 Smart Contracting Nuts and Bolts
13/161
8/10/2019 Smart Contracting Nuts and Bolts
14/161
8/10/2019 Smart Contracting Nuts and Bolts
15/161
8/10/2019 Smart Contracting Nuts and Bolts
16/161
8/10/2019 Smart Contracting Nuts and Bolts
17/161
8/10/2019 Smart Contracting Nuts and Bolts
18/161
8/10/2019 Smart Contracting Nuts and Bolts
19/161
8/10/2019 Smart Contracting Nuts and Bolts
20/161
8/10/2019 Smart Contracting Nuts and Bolts
21/161
8/10/2019 Smart Contracting Nuts and Bolts
22/161
8/10/2019 Smart Contracting Nuts and Bolts
23/161
8/10/2019 Smart Contracting Nuts and Bolts
24/161
8/10/2019 Smart Contracting Nuts and Bolts
25/161
8/10/2019 Smart Contracting Nuts and Bolts
26/161
8/10/2019 Smart Contracting Nuts and Bolts
27/161
8/10/2019 Smart Contracting Nuts and Bolts
28/161
8/10/2019 Smart Contracting Nuts and Bolts
29/161
8/10/2019 Smart Contracting Nuts and Bolts
30/161
8/10/2019 Smart Contracting Nuts and Bolts
31/161
8/10/2019 Smart Contracting Nuts and Bolts
32/161
8/10/2019 Smart Contracting Nuts and Bolts
33/161
8/10/2019 Smart Contracting Nuts and Bolts
34/161
8/10/2019 Smart Contracting Nuts and Bolts
35/161
8/10/2019 Smart Contracting Nuts and Bolts
36/161
8/10/2019 Smart Contracting Nuts and Bolts
37/161
8/10/2019 Smart Contracting Nuts and Bolts
38/161
8/10/2019 Smart Contracting Nuts and Bolts
39/161
8/10/2019 Smart Contracting Nuts and Bolts
40/161
8/10/2019 Smart Contracting Nuts and Bolts
41/161
8/10/2019 Smart Contracting Nuts and Bolts
42/161
8/10/2019 Smart Contracting Nuts and Bolts
43/161
8/10/2019 Smart Contracting Nuts and Bolts
44/161
8/10/2019 Smart Contracting Nuts and Bolts
45/161
8/10/2019 Smart Contracting Nuts and Bolts
46/161
8/10/2019 Smart Contracting Nuts and Bolts
47/161
8/10/2019 Smart Contracting Nuts and Bolts
48/161
8/10/2019 Smart Contracting Nuts and Bolts
49/161
8/10/2019 Smart Contracting Nuts and Bolts
50/161
8/10/2019 Smart Contracting Nuts and Bolts
51/161
8/10/2019 Smart Contracting Nuts and Bolts
52/161
8/10/2019 Smart Contracting Nuts and Bolts
53/161
8/10/2019 Smart Contracting Nuts and Bolts
54/161
8/10/2019 Smart Contracting Nuts and Bolts
55/161
8/10/2019 Smart Contracting Nuts and Bolts
56/161
8/10/2019 Smart Contracting Nuts and Bolts
57/161
8/10/2019 Smart Contracting Nuts and Bolts
58/161
8/10/2019 Smart Contracting Nuts and Bolts
59/161
8/10/2019 Smart Contracting Nuts and Bolts
60/161
8/10/2019 Smart Contracting Nuts and Bolts
61/161
8/10/2019 Smart Contracting Nuts and Bolts
62/161
8/10/2019 Smart Contracting Nuts and Bolts
63/161
8/10/2019 Smart Contracting Nuts and Bolts
64/161
8/10/2019 Smart Contracting Nuts and Bolts
65/161
8/10/2019 Smart Contracting Nuts and Bolts
66/161
8/10/2019 Smart Contracting Nuts and Bolts
67/161
8/10/2019 Smart Contracting Nuts and Bolts
68/161
8/10/2019 Smart Contracting Nuts and Bolts
69/161
8/10/2019 Smart Contracting Nuts and Bolts
70/161
8/10/2019 Smart Contracting Nuts and Bolts
71/161
8/10/2019 Smart Contracting Nuts and Bolts
72/161
8/10/2019 Smart Contracting Nuts and Bolts
73/161
8/10/2019 Smart Contracting Nuts and Bolts
74/161
8/10/2019 Smart Contracting Nuts and Bolts
75/161
8/10/2019 Smart Contracting Nuts and Bolts
76/161
8/10/2019 Smart Contracting Nuts and Bolts
77/161
Goods in Transit
8/10/2019 Smart Contracting Nuts and Bolts
78/161
Goods in TransitContract Carrier
The liability of contract carriers isdefined by the contract between thecarrier and the shipper.
If contracts are initiated by thecarrier, they often release the carrierfrom substantial responsibility except
in the case of extreme negligence.
Goods in Transit
8/10/2019 Smart Contracting Nuts and Bolts
79/161
Goods in TransitPrivate Carriers
Private carriers usually are carryingtheir own goods and are exposed forthe full value of those goods if theyare damaged or destroyed, subjectto the Terms of Merchandise Sale.
Goods in Transit
8/10/2019 Smart Contracting Nuts and Bolts
80/161
F.O.B means free on board and indicates thepoint at which ownership and exposure to lossshift from the seller to the buyer. For example: F.O.B. shippers loading dock means that
the transit exposure would be the buyersonce the goods are on the shippers loadingdock.
F.O.B. destination means that the transitexposure would be the sellers until the goodsreach the buyers destination.
Goods in TransitPrivate Carriers
Terms of Merchandise Sale
Goods of Bailees Customers
8/10/2019 Smart Contracting Nuts and Bolts
81/161
Goods of Bailee s Customers A bailment exists when goods are left to be
held in trust for a specific purpose andreturned when that purpose has ended.
The bailor is the owner of the goods. The bailee is the one in possession of the goods. Almost any person or enterprise that accepts
the property of the state for storage, service,repair, or processing needs to carry an InlandMarine Policy for the Goods of BaileesCustomers in order for this property to be
covered for loss or damage while in the baileespossession.
Inland Marine Coverage
8/10/2019 Smart Contracting Nuts and Bolts
82/161
Instrumentalities of Communicationand Transportation
Exposures related totransportation (rolling stock,bridges, and tunnels) can be
insured using inland marineinsurance. Inland marine insurance can also
be provided on instrumentalitiesof communication such astelevision towers andtransmission equipment.
Other Types of
8/10/2019 Smart Contracting Nuts and Bolts
83/161
Inland Marine Coverage Tractors, mobile equipment, cranes, and
backhoes. Computer equipment. Livestock.
Fine arts. Patterns, molds, and dies. Partially completed products that are
sent to another location for completion orprocessing. Valuable papers, records, records ofaccounts receivable.
Goods on exhibition.
When Should Your Agency
8/10/2019 Smart Contracting Nuts and Bolts
84/161
When Should Your AgencyRequire Inland Marine Coverage?
When agency goods or property are beingtransported by another entity.
When agency goods or property are left in
the care, custody, and control of anotherentity. When a contractor is transporting state
equipment from one place to another. When state property is placed on
exhibition by another entity e.g. artwork,historical documents, artifacts, etc.
B ild Ri k C
8/10/2019 Smart Contracting Nuts and Bolts
85/161
Builders Risk Coverage
Inland Marine Insurance that providesdirect damage coverage to buildings orstructures under construction.
Also covers foundations, fixtures,machinery, and equipment used to servicethe building, materials, and supplies usedin the course of construction.Fire, theft, and vandalism are the mostfrequent claims.
When Does Your Agency Need
8/10/2019 Smart Contracting Nuts and Bolts
86/161
When Does Your Agency Needto Ask for Builders Risk
Coverage?When a building is being
constructed.When substantial alterations willbe made to an existing structure
i.e., bearing walls, liftingfoundations, extensiveconstruction.
When Your Agency Doesnt
8/10/2019 Smart Contracting Nuts and Bolts
87/161
W e ou ge cy oes tNeed to Ask for
Builders Risk Coverage For construction to an existing building
that does not involve structuralmodifications, or substantial alterationof the building.
For construction of structures otherthan buildings e.g. tunnels, bridges,roads, culverts, etc.
Builders Risk Installation Floater
8/10/2019 Smart Contracting Nuts and Bolts
88/161
Builder s Risk Installation Floater Usually an add-on to a Builders RiskPolicy, but may be purchasedseparately by subcontractors on theproject.Insurance that covers machinery andequipment of all kinds during transit,installation, and testing at thepurchasers premises. Theft and vandalism are covered.
h Sh ld i
8/10/2019 Smart Contracting Nuts and Bolts
89/161
When Should You Require a
Builders RiskInstallation FloaterWhen a building is being constructed,
repaired, or remodeled and there willbe:More than $10,000 in building
materials and supplies at a storagelocation, or in transit that areintended to become a permanent partof the building.
Builders Risk Occupancy Clause
8/10/2019 Smart Contracting Nuts and Bolts
90/161
An add-on to a Builders Risk Policy. Allows Builders Risk coverage tocontinue once the owner or tenants
occupy a building under constructionprior to substantial completion of thebuilding.
If not purchased, Builders Riskcoverage ends once the building isoccupied by the owner or tenants.
Builders Risk Occupancy Clause
Aircraft Liability
8/10/2019 Smart Contracting Nuts and Bolts
91/161
yCovers liability for bodily injury andproperty damage to others (i.e., injuryto, or death of persons outside theaircraft as well as property damage ordestruction done with the aircraft),arising out of the ownership,maintenance, or operation of anaircraft.
8/10/2019 Smart Contracting Nuts and Bolts
92/161
When Do You Need
Aircraft Liability Coverage?When the contractor is using an
airplane to provide the contractedservice.
Aircraft Liability Coverage
8/10/2019 Smart Contracting Nuts and Bolts
93/161
If the contract involves the aerial application ofany chemical, fertilizer, seed, or baitadd Aircraft Aerial Application LiabilityCoverage.
Check the qualifications and certifications ofthe pilot. If carrying state passengers on behalf of the
state, make sure that:
(1) The pilot is certified to carry passengersand(2) The Aircraft Liability provides coverage
for the passengers on a per seat limit.
y gConsiderations
Garage and Garagekeepers
8/10/2019 Smart Contracting Nuts and Bolts
94/161
Garage and GaragekeepersLegal Liability Coverage
Garage Liability Coverage
8/10/2019 Smart Contracting Nuts and Bolts
95/161
Garage Liability Coverage
Covers garage operators for liability,medical payments, and automobilephysical damage arising out of the
operations of auto dealers, servicestations, auto repair shops, andparking lots.
Includes General Liability coveragefor garage operations.
Garagekeepers Legal Liability
8/10/2019 Smart Contracting Nuts and Bolts
96/161
g p g yCoverage
Coverage for autos left for service,repair, storage, or Safekeeping.
The limits of coverage should behigh enough to cover the total valueof any autos left for safekeeping
(yours and others) at any time.
Wh t Ab t S lf I ?
8/10/2019 Smart Contracting Nuts and Bolts
97/161
What About Self-Insurance?
Before Accepting Self-Insurance
8/10/2019 Smart Contracting Nuts and Bolts
98/161
p g Make sure the contractor has the
financial stability to be self-insured. Askfor: Audited financial statements of their
self-insurance fund. Assurance that funds have been setaside in a funded reserve to pay claims.
Ask for policies, procedures, or otheradequate documentation demonstratingthe contractors ability to adjust, process,settle, litigate, and pay claims.
Tail Coverage
8/10/2019 Smart Contracting Nuts and Bolts
99/161
Tail CoverageCan be purchased to extend theperiod of time a claim can bereported for a claims made policy. Should be required when acontractor provides insurancecoverage that is on a claims madebasis.
8/10/2019 Smart Contracting Nuts and Bolts
100/161
What is a Bond?
8/10/2019 Smart Contracting Nuts and Bolts
101/161
What is a Bond?
8/10/2019 Smart Contracting Nuts and Bolts
102/161
A Surety Bond is a risk transfer
mechanism that performs the followingfunctions:Guarantees that the bonded project will becompleted according to the terms of thecontract and at the determined contractprice.Guarantees that the laborers, suppliers, andsubcontractors will be paid even if thecontractor defaults.Relieves the owner from the risk of financialloss arising from liens filed by unpaidlaborers, suppliers, and subcontractors.
What is a Bond?
8/10/2019 Smart Contracting Nuts and Bolts
103/161
What is a Bond?(Continued)
Reduces the possibility of acontractor diverting funds from theproject.
Provides an intermediary (the surety)to whom the owner can air complaintsand grievances.
Lowers the cost of construction insome cases by facilitating the use ofcompetitive bids.
Bonds?
8/10/2019 Smart Contracting Nuts and Bolts
104/161
Bonds?
Bonds are different from insurance.A bond is a simple guarantee.If there is a loss, the bonding company
(Surety) will pay but will seek fullreimbursement from the contractor.Premium is based on the contractors
loss experience, assets, and finances.
8/10/2019 Smart Contracting Nuts and Bolts
105/161
8/10/2019 Smart Contracting Nuts and Bolts
106/161
What Are The Typical Kindsof Bonds Used in Contracts?
Bid Bond
8/10/2019 Smart Contracting Nuts and Bolts
107/161
Bid Bond
Provides financial assurance that thebid is submitted in good faith and thatthe contractor intends to enter into the
contract at the bid price and if statedin the bid, provide the requiredperformance and payment bonds.
Performance Bond
8/10/2019 Smart Contracting Nuts and Bolts
108/161
Performance Bond
Protects the state from financialloss should the contractor fail toperform the contract in accordancewith contract terms and conditions.
Payment Bond
8/10/2019 Smart Contracting Nuts and Bolts
109/161
Payment Bond
(Labor & Materials Bond) Guarantees that the contractor will paycertain subcontractors, laborers and
material suppliers associated with theproject.
Maintenance Bond
8/10/2019 Smart Contracting Nuts and Bolts
110/161
Maintenance Bond
Protects the state against defectsin workmanship or materials (usuallyfor two years) after the contractor
has completed the work.
Additional Bond Information
8/10/2019 Smart Contracting Nuts and Bolts
111/161
Additional Bond Information
Bond terms are usually 12 24months.The bond amount requesteddepends on the risk of thecontract.
In most cases, bonds cost about 1%- 3% of the contract amount.
Coverage Assessment
8/10/2019 Smart Contracting Nuts and Bolts
112/161
Coverage Assessment
How muchinsurance?
Two Schools of Thought
8/10/2019 Smart Contracting Nuts and Bolts
113/161
Two Schools of Thought
Traditional Contract
8/10/2019 Smart Contracting Nuts and Bolts
114/161
Risk Assessment What is the activity? Who could be harmed? What could go wrong? How bad could it be? How much could it cost?
Assignment of insurance amounts basedon the Risk Rating.
Use the risk rating to set
8/10/2019 Smart Contracting Nuts and Bolts
115/161
ginsurance and bonding limits.
INSIGNIFICANT MINOR MODERATE MAJOR CRITICAL
ALMOST
CERTAIN
M H E E E
LIKELY M M H E E
POSSIBLE L M H E E
UNLIKELY L L M H ERARE L L M H H
L i k e l i h o o d
Severity
8/10/2019 Smart Contracting Nuts and Bolts
116/161
E = Extreme Risk:
First, consider not doingthe activity.
If you must, you will needto decide how much apotential loss could cost?
In general, risks at thislevel warrant more than$1 million in coverage.
H = High Risk:
8/10/2019 Smart Contracting Nuts and Bolts
117/161
Could a potential loss cost in
excess of $1 million? If so,ask for more coverage. Make sure your assessment
considers all costs ofpotential losses.
Risk Management would notrecommend limits of less
than $1 million for Highrated risks.
M = Moderate Risk:
8/10/2019 Smart Contracting Nuts and Bolts
118/161
Standard limit ofinsurance is $1 million.
Assessment shouldconsider all costs ofpotential losses. If assessment revealspotential loss in excess of
$1 million, your risk mayactually be high (see H forHigh Risk.)
L = Low Risk:If i k i i i l thi i th h
8/10/2019 Smart Contracting Nuts and Bolts
119/161
If risk is minimal, this is the area wherecoverage and limits may potentially beflexible.
Standard limit is still $1 million. In the case of minimal risks, the agency
could make a business decision to lower thelimits of coverage.
Risk Management would not generallyrecommend insurance limits of less than$500,000.
If the risk assessment reveals onlyminute risk, agency could make abusiness decision to waive coverage.
8/10/2019 Smart Contracting Nuts and Bolts
120/161
OR
Try Backing Into theC A
8/10/2019 Smart Contracting Nuts and Bolts
121/161
Coverage Amount
Coverage Assessment
8/10/2019 Smart Contracting Nuts and Bolts
122/161
Coverage Assessment
Analyze the perilscovered by the type ofinsurance you will berequiring.
Looking at the perils,and analyze if theseperils exist in theperformance of thecontracted work.
Coverage Assessment
8/10/2019 Smart Contracting Nuts and Bolts
123/161
For each peril that exists in thecontracted work, perform a riskassessment of: Who could be harmed? What could go wrong? How bad could it be? How much could it cost?
Rate the perils and assign insuranceamounts based on the Risk Rating.
Coverage Assessment
Supplemental Clauses
8/10/2019 Smart Contracting Nuts and Bolts
124/161
Supplemental Clauses
ICING ON THE CAKE
8/10/2019 Smart Contracting Nuts and Bolts
125/161
Additional Insured
8/10/2019 Smart Contracting Nuts and Bolts
126/161
Should be issued as anendorsement to the contractorsinsurance coverage.
The endorsement to thecontractors insurance coveragemay be issued on a blanket basisthat applies to any entity thecontractor enters into a contractwith.
Notice of CancellationCh
8/10/2019 Smart Contracting Nuts and Bolts
127/161
or ChangeRequires the contractor or serviceproviders insurance company tonotify us if:
There is a possibility of the policylimits being exhausted.The policy is cancelled or non-renewed.
Certificates of Insurance
8/10/2019 Smart Contracting Nuts and Bolts
128/161
Certificates of Insurance
8/10/2019 Smart Contracting Nuts and Bolts
129/161
What Does SIR Mean?f f
8/10/2019 Smart Contracting Nuts and Bolts
130/161
Stands for Self-Insured Retention.Works like a deductible.If you see this on a Certificate ofInsurance, it means the contractorwill perform all the functionsnormally undertaken by an insurancecompany for claims within the SIR.
Any losses must exceed the SIRamount before the insurancecompany will handle the claim.
What Document(s) areA t bl t V if
8/10/2019 Smart Contracting Nuts and Bolts
131/161
Acceptable to Verify
Insurance Coverage?Certificate of Insurance.Letter from corporation stating theyare self-insured. This should beaccompanied by a financial statement,unless you are certain about the entitysfinancial stability.Letter from bank stating the amountheld in reserves to pay claims andlawsuits.
Make sure the coverage and policy limitsmatch the contract requirements
8/10/2019 Smart Contracting Nuts and Bolts
132/161
match the contract requirements.Look at the policy effective date andexpiration dates to make sure they coincidewith the contract term. If not, requestanother certificate several months beforethe policy expires.
The State of Oregon or your agency isnamed as the certificate holder andadditional insured.What do the comments in the descriptionsection say? Contact the agent with anyquestions.Is there an SIR (self-insured retention)listed?
Reading Certificates of Insurance
8/10/2019 Smart Contracting Nuts and Bolts
133/161
Contractual
http://localhost/var/www/apps/conversion/Training/Smart%20Contracting/2005/SampleCertificateofInsurance.pdf8/10/2019 Smart Contracting Nuts and Bolts
134/161
Risk Assessment ExampleLottery Purchase ofPoker/Slot Machines
What is the scope of thet t l ti it ?
8/10/2019 Smart Contracting Nuts and Bolts
135/161
contractual activity?
What is the overall activity?Procurement of 325 Video Poker/Slot
Machines
What are the activitycomponents?
8/10/2019 Smart Contracting Nuts and Bolts
136/161
components?
Design and development ofspecifications for themachines.
Manufacture of the machines. Quality control and testing. Transportation of the
machines to the LotteryWarehouse.
When and where does the activity
8/10/2019 Smart Contracting Nuts and Bolts
137/161
When and where does the activity
take place(s)? Victoria B.C. 5/26/05 through 11/30/05
Who will be performing theactivities? Victoria Games, Inc. ABC Trucking, Inc. a Common Carrier,F.O.B. Shippers Dock
Will the contractor interact withthe public, staff, vendors, etc.?
8/10/2019 Smart Contracting Nuts and Bolts
138/161
the public, staff, vendors, etc.?
There will be interaction between themanufacturer and various Lottery employeesduring design, development, manufacturing,and quality control.
The Common Carrier will have interactionwith Lottery employees during the deliveryof the machines to the Lottery Warehouse
Will there be any hazardous materials
8/10/2019 Smart Contracting Nuts and Bolts
139/161
yinvolved? Only at the manufacturing site and related toproperty disposal of the machines when they
are no longer useable. The manufacturer hasall appropriate premises coverage for the on-
site pollution exposure and maintainsregulatory compliance. Lottery has madearrangements for appropriate disposal ofmachines.
What could go wrong?Who could be harmed?
8/10/2019 Smart Contracting Nuts and Bolts
140/161
Who could be harmed?
Bodily injury and/or illness tocontractor employees on-site.
Bodily injury and/or illness toLottery employees on-site duringdesign, development, qualitycontrol, and testing.
Bodily injury to vendors or patronsof the machines if they aredefective and start a fire, causeelectrocution, sharp edges, etc.
Bodily Injury:
What could go wrong?Who could be harmed?
8/10/2019 Smart Contracting Nuts and Bolts
141/161
Who could be harmed?
Machines could be damaged at themanufacturers location or during
transport. Machines could be defective andcause a fire at the vendors location.
Machines could be stolen while intransit. Machines could improperly pay out
causing financial loss.
Property Damage:
What could go wrong?Who could be harmed?
8/10/2019 Smart Contracting Nuts and Bolts
142/161
Who could be harmed?
It is unlikely that theLottery would be heldresponsible for pollutionexposures during themanufacturing process ortransportation.
The Lottery has alreadymade arrangements forappropriate disposal ofmachines.
Environmental Damage:
What could go wrong?Who could be harmed?
8/10/2019 Smart Contracting Nuts and Bolts
143/161
Who could be harmed?
Faulty manufacturing due toimproper design.
Dangerous conditions inmachines due to faulty design.
Payouts of machines could be
defective, causing financialloss to the Lottery andvendors.
Design Flaws:
What could go wrong?Who could be harmed?
8/10/2019 Smart Contracting Nuts and Bolts
144/161
Bodily injury and/or illness to thevendor or patrons using the machines.
Damage to property of vendor or nearor adjacent property owners due toconditions in machines that causes fire.
Financial loss to vendors if machinesare defective an cause improperpayouts. Financial loss to patrons if machines aredefective and dont pay out as much asthey should.
Liability:
Is there any impact on workload ordamage to our systems?
8/10/2019 Smart Contracting Nuts and Bolts
145/161
damage to our systems?
- Delay in installation andimplementation of marketingprogram for machines in vendorlocations.
- Additional costs for repair or re-design of machines.
What are the potentiall i d
8/10/2019 Smart Contracting Nuts and Bolts
146/161
loss exposures associatedwith this activity?
Bodily injury Property damage Design flaw Liability
Rate the Severity of EachPotential Loss Exposure.
8/10/2019 Smart Contracting Nuts and Bolts
147/161
Potential Loss Exposure.How bad can each loss be?
What could it cost? Bodily Injury : Minor, Hundreds to
Thousands Property Damage : Major, Thousands toMillions
Design Flaw : Critical, Thousands toMillions Liability: Major, Thousands to Millions
What is the Likelihood ThatEach of These Potential
8/10/2019 Smart Contracting Nuts and Bolts
148/161
Each of These Potential
Losses Will Happen? Bodily Injury - Unlikely Property Damage - Possible Design Flaw Possible Liability Possible
Use the Risk Rating to SetInsurance Limits
8/10/2019 Smart Contracting Nuts and Bolts
149/161
Insurance Limits
INSIGNIFICANT MINOR MODERATE MAJOR CRITICAL
ALMOSTCERTAIN
M H E E E
LIKELY M M H E E
POSSIBLE L M H E E
UNLIKELY L L M H E
RARE L L M H H
L i k
e l i h o o d
Severity
Determine the Risk Rating
8/10/2019 Smart Contracting Nuts and Bolts
150/161
Determine the Risk Ratingor Level of Risk for EachLoss Exposure.
Bodily Injury : Low RiskProperty Damage : Extreme RiskDesign Flaw : Extreme Risk
Liability: Extreme
Weighing the Value of OpportunitiesRating Value Description (Opportunity)
8/10/2019 Smart Contracting Nuts and Bolts
151/161
g p ( pp y)
1 Insignificant Minor budgetary, funding, or resource gain; Little orno gain in public and/or client relations.
2 Minor Low budgetary, funding, or resource gain; Somegain in public and/or client relations.
3 Moderate Moderate budgetary, funding, or resource gain; Adequate public and/or client relations.
4 Major Major budgetary, funding, or resource gain; Goodpublic and/or client relations.
5 Critical Huge budgetary, funding, or resource gain;Excellent public and/or client relations.
What Could Be The OpportunitiesOn This Project?
8/10/2019 Smart Contracting Nuts and Bolts
152/161
Funding for government. Good public perception for theeffective negotiation with vendors,
effective installation of machines. Good vendor relations for effectivelymanaging implementation of the
machines. Economic stimulation from additionalfunding sources.
Determine Non-InsuranceRisk Control Measures
8/10/2019 Smart Contracting Nuts and Bolts
153/161
Include safety protocols and trainingrequirements in the contract.
Verify that all of the contractors employeesare properly trained and/or certified asrequired for the scope of work.
Verify that all Lottery employees going to themanufacturers location are properly trainedand/or certified as required for the dutiesthey will perform. Require the contractor to log all incidents andto include mitigation strategies for preventingthe incident in the future.
Risk Control Measures Bodily Injury:
Determine Non-InsuranceRisk Control Measures
8/10/2019 Smart Contracting Nuts and Bolts
154/161
Contractual terms that hold the contractorresponsible for damage to the machines whileon their premises.
Contractual terms that hold the contractorresponsible for defects in the product thatare not discovered during quality control ortesting.
Negotiation of contract with manufacturerand/or common carrier for responsibility formachines during transit and security protocol.
Property Damage:
Determine Non-InsuranceRisk Control Measures
8/10/2019 Smart Contracting Nuts and Bolts
155/161
Lottery review of manufacturers design workprior to production.
Use of best practices in design work. Require high levels of knowledge, skills, and
experience of manufacturers design staff. Lottery oversight of design work and
manufacturing application during all phases ofproject.
Contractual warranty of design work andretention of manufacturer compensation untilwork is inspected and found to be satisfactory.
Design Flaws:
Determine Non-InsuranceRisk Control Measures
Li bili
8/10/2019 Smart Contracting Nuts and Bolts
156/161
In depth review and supervision ofmanufacturers quality control andtesting of machines for electrical
components and other parts that couldcause bodily injury, property damage, orfinancial loss to vendors, patrons, orothers (as appropriate).
Warranties on the machines that coverpotential defects found afterinstallation.
Liability:
Assignment ofInsurance Coverage
8/10/2019 Smart Contracting Nuts and Bolts
157/161
Insurance Coverage Bodily Injury : Low Risk CGL.Property Damage : Extreme Risk CGL,Truckers Coverage, Inland Marine
coverage for Domestic Goods inTransit and Goods of BaileesCustomers.Design Flaw : Extreme Risk Professional LiabilityLiability: Extreme Risk - CGL
Assignment ofInsurance Amounts
8/10/2019 Smart Contracting Nuts and Bolts
158/161
Commercial General Liability (CGL): $2 millionper occurrence with $5 million aggregate. Truckers Coverage: $2 million per accident.
Inland Marine: Domestic Goods in Transit: The value of theshipment.
Goods of Bailees Customers: The value of the
product at completion. Professional Liability: $1 million peroccurrence with $2 million aggregate.
Did We Forget Something?
8/10/2019 Smart Contracting Nuts and Bolts
159/161
Doesnt this project have a pre -determined timeframe forcompletion and detailedspecifications?
Lottery should consider requiringPerformance Bond for the
amount of the contract or theirmaximum probable loss if thecontractor does not perform.
Bonding Related Questions to Ask How much will it cost to find another
8/10/2019 Smart Contracting Nuts and Bolts
160/161
ow uc w t cost to d a ot econtractor e.g. RFP, staff time, etc. andcomplete the project if this contractor doesnot complete?
If the contractor does not complete theproject within the specified timeframe, howmuch will it cost the Lottery and/orvendors?
If the product is completed, but not asspecified, how much could it cost theLottery if another vendor has to fix themachines?
8/10/2019 Smart Contracting Nuts and Bolts
161/161