Small Works - Retail: Decathlon Grafton Ctr. Cambridge Alliance is pleased to have been engaged by Decathlon’s project managers for their UK expansion including the new Cambridge store within the Grafton Shopping Ctr. The project required design & build HVAC services from Alliance’s M&E portfolio for its two retail floors and back-of-house areas. Alliance organised a contract lift for the plant with condensing units mounted on a ‘Roof-pro’ and reusing a roof top plant room for the heat recovery ventilation unit & fans. By the afternoon of the first day all equipment & materials had been delivered and the crane lift completed. Alliance finished the project comfortably within the programme, and the company’s popular easy-use guides were provided as part of staff training. design, supply, install, test & commissioning mechanical HVAC contract lift F-Gas requirements When: May /June 2016 (<4 weeks) Where: Cambridge Imperative: typical retail coordination & deadlines Result: Another successful project delivery by the Alliance team backed by years of assembled experience in commercial projects and a sound reputation in the retail sector. To discuss this, or your project, contact Alliance: Call: 01623 287 989 Email: offi[email protected] Visit: www.atbsuk.com ©John Goulding - Visual 360 Media

Small Works - Retail: Decathlon Grafton Ctr. …Small Works - Retail: Decathlon Grafton Ctr. Cambridge Alliance is pleased to have been engaged by Decathlon’s project managers for

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Small Works - Retail: Decathlon Grafton Ctr. …Small Works - Retail: Decathlon Grafton Ctr. Cambridge Alliance is pleased to have been engaged by Decathlon’s project managers for

Small Works - Retail: Decathlon Grafton Ctr. Cambridge Alliance is pleased to have been engaged by Decathlon’s project managers for their UK expansion inc luding the new Cambridge store within the Grafton Shopping Ctr. The project required design & build HVAC services from Alliance’s M&E portfolio for its two retail floors and back-of-house areas. Alliance organised a contract lift for the plant with condensing units mounted on a ‘Roof-pro’ and reusing a roof top plant room for the heat recovery ventilation unit & fans. !By the afternoon of the first day all equipment & materials had been delivered and the crane lift completed. Alliance finished the project comfortably w i t h i n t h e p ro g r a m m e , a n d t h e company’s popular easy-use guides were provided as part of staff training.

‣ design, supply, install, test & commissioning ‣ mechanical HVAC ‣ contract lift ‣ F-Gas requirements

When: May /June 2016 (<4 weeks)

Where: Cambridge

Imperative: typical retail coordination & deadlines

Result: Another successful project delivery by the Alliance team backed by years of assembled experience in commercial projects and a sound reputation in the retail sector. To discuss this, or your project, contact Alliance:

Call: 01623 287 989 Email: [email protected] Visit: www.atbsuk.com