21
Small Scale LNG a Way to Market for Stranded Coal Bed Methane in Indonesia Society of Petroleum Engineers Asia Pacific Oil and Gas Conference and Exhibition Neil Semple October 2013

Small Scale LNG a Way to Market for Stranded Coal Bed … · Small Scale LNG a Way to Market for Stranded Coal Bed Methane in Indonesia Society of Petroleum Engineers Asia Pacific

Embed Size (px)

Citation preview

Small Scale LNG a Way to Market for Stranded Coal Bed Methane in Indonesia Society of Petroleum Engineers Asia Pacific Oil and Gas Conference and Exhibition Neil Semple October 2013

The Lantau Group

We at The Lantau Group are experts in the economics of energy systems

Economic Consulting

Asset Valuation

Business & Regulatory Strategy

Competition, Markets, Regulation

Testimony

Market Analysis

Asia Pacific Energy Experts

Hong Kong

Seoul

(TLG Korea)

The founding partners

of TLG first worked in

the Asia Pacific region

as part of Putnam,

Hayes & Bartlett (PHB)

and later with Charles

River Associates

Office

Presence

1

The Lantau Group

Our partners and principals have consulted for leaders throughout the region

2

Financial Institutions

International Aid Agencies

Government Ministries

Market and System Operators

Regulatory Agencies

Independent Power Producers

Leading utilities

Oil & Gas companies

The Lantau Group

Displacing traditional fuels with onshore small scale LNG

3

Context

• Small scale LNG on a remote onshore gas field is a quick way to market production.

• No need to wait to prove up huge reserves to justify a pipeline.

• No need to then wait for the pipeline to be built.

• Cost of Small Scale LNG infrastructure leaves plenty of headroom for reasonable upstream gas prices.

• Some parts of Small Scale LNG equipment are now becoming standardised driving down costs.

• Remote small diesel-fired generation sets might also be able to get LNG in pressurised container tanks

• Large potential market in Kalimantan and Sumatra to displace diesel with LNG in mine trucks.

• Displacement of industrial use of LPG and fuel oil might also be targeted.

Main Points

The Lantau Group

Small scale LNG distribution

Liquefaction

Plant

LNG satellite

terminal

Port

Single of rack of

gas engines or

CCGT

1

2

3

4

LNG

LNG

LNG Port

Port

4

The Lantau Group

PLN’s power plants by type and region

5

The Lantau Group

PLN Data on 2011 diesel gensets and diesel usage

6

• PLN 2011 Yearbook says there are 4,786 diesel-fired power plants outside the island of Java.

• With installed capacity of 2,467 MW and rated capacity of 1,490 MW.

• These are mostly gen-sets and consume some 4.6bn litres of diesel a year, or the energy equivalent of

about 4.7 bcma, or 450 mmcfd.

Macro scale

The Lantau Group

• Small scale onshore LNG to mini loads

7

The Lantau Group

Over 50 CBM PSCs soon to be looking for a market for their gas

8

• Wellhead breakeven

is estimated in the

range of USD 7

mmbtu.

• But it will be several

years yet before full

commerciality is

achieved.

Source: BP MIGAS

Date awarded CBM Blocks Awarded Location Operator Participation

1 May-08 Sekayu South Sumatra Medco Medco, Batavia Energy, Ephindo

2 Jun-08 Bentian Besar East Kalimantan CBM Asia Ridlatama Mining Utama (farmed 70% to CBM Asia 2011 Oct?)

3 Jun-08 Indragiri Hulu Riau, Central

Sumatra Samantaka Mineral Prima Samantaka Mineral Prima

4 Nov-08 Barito Banjar I South Kalimantan Indobararambai Gas Methan Consortium of local KP holders, XOM

5 Nov-08 Barito Banjar II South Kalimantan Barito Basin Gas Consortium of local KP holders, XOM

6 Nov-08 Kutai West East Kalimantan Kutai West CBM CBM Asia, Newton Energy Capital

7 Nov-08 Sangatta I East Kalimantan Pertamina-Sangatta West CBM Ephindo, Pertamina, Arrow

8 May-09 Ogan Komering South Sumatra Ogan Interior Gas Ogan Interior Gas (Santos)

9 May-09 Sangatta II East Kalimantan Pertamina Hulu Energi Metana Kalimantan - Visi Multiartha Pertamina Hulu, Visi Multiartha (EMP)

10 May-09 Tabulako Kalimantan Artha Widya Persada EMP, Bumi Resources

11 Aug-09 Barito Tapin South Kalimantan Trisakti Gas Methane Trisakti Gas Methane, XOM

12 Aug-09 Kotabu South Kalimantan Satui Basin Gas Satui Basin Gas

13 Aug-09 Ogan Komering II South Sumatra East Ogan Methane East Ogan Methane (Santos)

14 Aug-09 Pulang Pisau Central Kalimantan Uangel Sigma Energi Sigma Energy Bumi, Blue Tiger

15 Aug-09 Tanjung Enim South Sumatra Pertamina Hulu Energi Mitra Enim Pertamina Hulu Energi Mitra Enim, Bukit Asam Metana Mitra Enim, Dart Energy

16 Nov-09 Barito South Kalimantan Trans Asia Resource - Jindal SS Indonesia Trans Asia Resoutrce, Jindal Stainless Indonesia

17 Nov-09 Rengat Central Sumatra Indon CBM Sigma Energy Bumi, Blue Tiger

18 Nov-09 Sanga Sanga East Kalimantan Vico Indonesia Vico Indonesia, BP East Kalimantan, Lasmo Sanga Sanga, OPIC Oil Houston, Virginia Inter Co, Universe Gas

& Oil

19 Nov-09 Batang Asin Central Sumatra Bumi Perdana Energy - Glory Wealth Pacific Bumi Perdana Energy, Glory Wealth Pacific

20 Nov-09 Muara Enim South Sumatra Trisula CBM Energy Pertamina Hulu Energi Metana Sumatra 2, Trisula CBM Energy (part of ASX listed Nu Energy)

21 Dec-10 Muralim South Sumatra Dart Energy (Muralim) E. Ltd Dart, Medco Energi

22 Mar-11 Kutai East East Kalimantan Senyiur CBM Senyiur CBM Consortium Inc. - Total E & P East Kutai

23 Apr-11 Kapuas I Central Sumatra Transasia CBM PT Transasia CBM consortium - BP Kapuas I Limited

24 Apr-11 Kapuas II Central Sumatra Kapuas CBM Indonesia Indonesia PT Kapuas CBM consortium - BP Kapuas II Limited

25 Apr-11 Kapuas III Central Sumatra Gas Methan Utama Methane Gas consortium PT Main - BP Kapuas III Limited

26 Apr-11 Kutai West East Kalimantan Gas Methan Gas Methan Abadi

27 Apr-11 Muara Enim I South Sumatra Pertamina Hulu Energi Metana Sumatera I Konsorsium Pertamina Hulu Energi Metana Sumatera I & Indo Gas Methan

28 Apr-11 Muara Enim II South Sumatra Pertamina Hulu Energi Metana Sumatera 5 Konsorsium PT Pertamina Hulu Energi Metana Sumatera 5 - PT Metana Enim Energi - PT Indo CBM Sumbagsel 2 Pte. Ltd.

29 Apr-11 Muara Enim III South Sumatra Pertamina Hulu Energi Metana 4 Konsorsium PT Pertamina Hulu Energi Metana Sumatera 4 - PT Baturaja Metana Indonesia.

30 Apr-11 Sijunjung West Sumatra Global Lion and Tamarin Hill Senyiur CBM Consortium Inc. - Total E & P East Kutai

31 Jul-11 Belida South Sumatra Sele Raya Konsorsium Sele Raya Resource & Andalas Metana Energi

32 Jul-11 Kutai II, East Kalimantan East Kalimantan Ephindo Konsorsium Ephindo Kutai North Inc. & Resources Alam Energi

33 Jul-11 Lematang South Sumatra Medco Konsorsium . Medco Cbm Lematang; Methanindo Energi Resources; & . Saka Energi Indonesia

34 Jul-11 Melak Mendung I East Kalimantan Ephindo Ephindo Mega Methana Inc

35 Jul-11 Melak Mendung III East Kalimantan Deep Industries Konsorsium Deep Industries Limited & Monnetispat & Energy Limited

36 Jul-11 Suban II South Sumatra Pertamina Hulu Energi Consortium PT Pertamina Hulu Energi Metana Suban II – PT. Suban Methan Gas

37 Aug-11 Suban I South Sumatra Pertamina Hulu Energi Konsorsium Pt Pertamina Hulu Energi Metana Subani & Pt. Suban Methan

38 Aug-11 Suban II South Sumatra Pertamina Hulu Energi Pertamina Hulu Energi Suban Ii& Pt Suban Methan Gas

39 Oct-11 Hulu Central Sumatra CBM Asia CBM Asia

40 Dec-11 Bangkanai I Central Kalimantan Bangkanai CBM Energi Sugico Graha

41 Dec-11 Bangkanai II Central Kalimantan Borneo Metana Energi Sugico Graha

42 Dec-11 Bangkanai III Central Kalimantan Bangkanai Energi Resources Sugico Graha

43 Dec-11 Bangkanai IV Central Kalimantan Bangkanai Jaya Perkasa Sugico Graha

44 Dec-11 Tanah Laut South Kalimantan Asam-Asan Methan Gas Asam-Asan Methan Gas, Sumber Daya Energi

45 Dec-11 Tanjung II Kalimantan Pertamina Hulu Energi Pertamina Hulu Energi

46 Apr-12 Air Komering Sumatera Selatan Baturaja Energi Konsorsium PT. Baturaja Energi – PT. Anugrah Persada Energi

47 Apr-12 Air Benakat I Sumatera Selatan Pertamina Hulu Energi Metana Sumatera 3 Konsorsium PT Pertamina Hulu Energi Metana Sumatera 3 – PT. Petrobara Sentosa

48 Apr-12 Air Benakat II Sumatera Selatan Pertamina Hulu Energi Metana Sumatera 6 Konsorsium PT Pertamina Hulu Energi Metana Sumatera 6 – PT. Prima Gas Sejahtera

49 Apr-12 Air Benakat III Sumatera Selatan Pertamina Hulu Energi Metana Sumatera 7 Konsorsium PT Pertamina Hulu Energi Metana Sumatera 7 – PT. Unigas Geosinklinal Makmur

50 Dec-11 West Sanga Sanga East Kalimantan Sugico Graha Sanga Sanga Prima Energi

51 Sep-12 Benlagon East Kalimantan Dart CBM Dart CBM

52 Sep-12 Belawa South Sulawesi Bumi Parahyangan Energi Bumi Parahyangan Energi

53 Sep-12 Sekayu South Sumatra Ephindo and Star Energy Ephindo and Star Energy

54 Sep-12 Kuala Kapuas I Central Kalimantan CBM Asia CBM Asia and Tranaco Utama

The Lantau Group

Key components of onshore small scale onshore LNG

9

• Liquefaction and storage

– Can be anywhere from 25 to 50 tonnes per day or 1.25 to 2.5 mmcfd (skid mounted) to 700 to 1,000 tpd or 35 to 50 mmcfd modular design.

• Delivery and Storage

– ISO tank on back of low loader truck serves as deliver and storage device – just like delivering milk.

• Regasification

– Tropical environment could use ambient air vapourisation but foot print can be large.

• Power plant

– Might be worth making them dual fuel if not too old but for those older ones of nearing major overhaul best probably to buy a gas engine (9 MW to 18 MW).

Power plant Small scale LNG liquefaction Ambient air regas ISO tank delivery by truck

Description of onshore small scale LNG delivery and use

Source: Linde Source: Liquiline Source: Cryogas Equipment Source: Wartsila

The Lantau Group

LNG usage at small remote mini power plant

10

• We take a plant with capacity of 10 MW and

average capacity factor of 67%

• This level of demand is very unlikely to support

conventional LNG delivery chain.

• But would fit with delivery by LNG offloaded

into ISO tanks on load loaders.

• In our example there would be the need for the

delivery per week of about ten 40 foot ISO

tanks with 16 tonnes of LNG for a total of close

to 160 tonnes per week.

• Storage on site of ten ISO tanks would give a

weeks stand by supply.

Consumption

At the plant level

Power plant MW 10

Hours per Day 16

HHV mmbtu MWh 7

mmbtu per Day 1,150

LNG mmbtu per tonne 50

LNG Tonnes per day 23

LNG Tonnes per week 160

The Lantau Group

High-level cost assumptions for small scale onshore LNG to mini power

11

• Upstream well head price.

– Close to USD 7 mmbtu from stranded CBM gas.

• Small scale onshore LNG plant

– USD 5 mmbtu

• 40 TEU container frame which contains and ISO tank with 16 tonnes of LNG and is delivered on a back of a low loader directly by road, pulled by a truck, using diesel or LNG, to a power plant.

– USD 1 mmbtu in round numbers for tractor, fuel and opex.

• The tank can contain the LNG for between 10 to 15 days before some blow off is needed to release pressure. So these tanks as well as being heat insulated are also built to take quite a bit of pressure (15 to 25 bar or 220 to 360 psi). We assume seven days of storage.

– This works out at a levelised capex number of near USD 2 per mmbtu.

• Vaporization could be by ambient air technology given relatively warm climate.

– This works out at a levelised capex of under USD 1 mmbtu.

• Gensets would need modified to use a mixture of mostly regasified LNG and some diesel for ignition, or else buy new gas engines that only use gas.

– Levelised cost of new plant USD 22 MWh at 67 capacity factor. Assuming a heat rate 7 mmbtu per MWh, implies cost of new plant, expressed in fuel terms, in the region of USD 3 mmbtu.

• Sums to USD 19 mmbtu so still plenty of headroom when compared to diesel price of about USD 30 per mmbtu.

0

2

4

6

8

10

12

14

16

18

20

1

US

D m

mb

tu

New gas engine

Vaporisation

ISO containers

Delivery by truck

Liqufaction

Upstream gas

Small Scale LNG Cost Assumptions Cost stack

The Lantau Group

• Small scale onshore LNG to industry

The Lantau Group

Coal production in Indonesia

13

• Coal production on the rise

• For the whole of Indonesia

• Kalimantan and Sumatra dominate

• Both are near CBM gas fields that are

looking to sell gas

0

50

100

150

200

250

300

350

2007 2008 2009 2010 2011

m t

on

ne

s

Coal Production Indonesia

Source: Ministry of Energy and Mineral Resources

The Lantau Group

Diesel displacement by LNG in mine trucks

14

• This is for the whole of Indonesia which means in practice Kalimantan and Sumatra

• Assumes 11.4 litres of diesel used per tonne of coal produced.

• GFS technology displaces about half of the diesel consumption.

• LNG demand of about 1.1 mmtpa or 3,000 tonnes per day or 150 mmcfd.

• Would need a mini-aggregator to collect LNG from various gas fields.

• This would also provide a level of security of supply to the buyers.

0

50

100

150

200

250

300

350

2007 2008 2009 2010 2011

mm

cfd

Diesel use converted to mmcfd

Trucks using half diesel and half LNG

Source: The Lantau Group

The Lantau Group

GFS Corp LNG-fueled mine truck retro-fit

15

• The EVO-MT™ System for Caterpillar 793 Mine

Haul Trucks allows operators to substantially

reduce operating costs and improve sustainability

by replacing diesel fuel with liquid natural gas

(LNG)

• The EVO-MT 7930 System is designed and

manufactured by GFS Corp of Weston, Florida and

is the world’s first commercial technology that

allows large mine haul trucks to operate on natural

gas.

• Has to use between 30 to 50% diesel to get

ignition.

• These trucks with 3,000 horse power are in a

separate class from road haulage which have a

tenth of that power.

• Tests with four truck in Wyoming have been

running for nine months and appear successful.

• Demonstration in Kalimantan have not started yet. Source: GFS Corp

The Lantau Group

Caterpillar LNG-fueled mine truck

16

• Caterpillar has said “natural gas is a clean burning,

economical fuel that is readily available to the

majority of our mining customers worldwide.”

• The company’s first LNG-powered products are

expected to include three large mining trucks—the

Cat 793, 795 and 797. The large trucks are in the

early stages of development with commercial launch

expected within five years.

• To accelerate the product development process,

Caterpillar is partnering with Westport Innovations,

Inc., a global leader in natural gas engines. The

company brings its Westport™ high pressure direct

injection (HDPI) technology, proven in on-highway

applications, to the relationship, complementing

Caterpillar’s strengths in engine and off-road

equipment development.

• In addition to offering new LNG products, Caterpillar

is developing retrofit solutions for those who opt to

convert existing mining trucks to natural gas.

Source: Caterpillar

The Lantau Group

Market price diesel less cost of small scale LNG

17

• We show here the unsubsidized diesel

price which the mining industry is

supposed to pay.

• Truck conversion cost estimate wrapped

up in netback bar.

• If delivered LNG cost is USD20 mmbtu

then savings per day could approximate

to USD 625 per truck per day based on

3,800 litre per day use of diesel, or

payback in a year.

0

5

10

15

20

25

30

35

Diesel Liquefaction, Transport,Storage, Vapourisation

Rent and Wellhead andTruck Conversion

USD

mm

btu

The Lantau Group

Non subsidised LPG less cost of small scale LNG

18

• Here we show the price that large

industrial users pay for bulk LPG in 50

kg containers.

• Subtracted is the LNG liquefaction,

storage, transport, storage and

vapourisation cost.

• This gives the potential price that

upstream CBM PSCs could sell their gas

for ex-PSC.

0

5

10

15

20

25

30

35

LPG Delivered Bulk MarketPrice

Liquefaction, Transport,Storage, Vapourisation

Rent and Wellhead

US

D m

mb

tu.

The Lantau Group

Displacing traditional fuels with onshore LNG

19

Context

• Small scale LNG on a remote onshore gas field is a quick way to market production.

• No need to wait to prove up huge reserves to justify a pipeline.

• No need to then wait for the pipeline to be built.

• Cost of Small Scale LNG infrastructure leaves plenty of headroom for reasonable upstream gas prices.

• Some parts of small scale LNG equipment are now becoming standardised driving down costs.

• Remote small diesel-fired generation sets might also be able to get LNG in pressurised container tanks

• Large potential market in Kalimantan and Sumatra to displace market diesel with LNG in mine trucks.

• Displacement of industrial use of LPG and fuel oil might also be targeted.

Main Points

The Lantau Group

Thank you

For more information please contact us:

By email

Direct Communications

[email protected]

[email protected]

By phone +852 2521 5501 (office)

By mail 4602-4606 Tower 1, Metroplaza

223 Hing Fong Road,

Kwai Fong, Hong Kong

Online www.lantaugroup.com

Rigour

Value

Insight

Energy Power Utilities

20 | The Lantau Group