Project Profile: Small Hydroelectric Power Plant
1
PROJECTSUMMARY
1 TheProposal : TosetupaSmallHydroelectric PowerPlant
2 ProposedLocationoftheproject : The following factors need to be thoroughly
examinedbeforefinalizingthelocation
a. Water stock consistency during variousseasons
b. Theheadavailablec. NearnesstoexistingKSEBsubstationd. Population density (for assessing
rehabilitationrequirements)
3 Products/Servicesandinstalledcapacity : 3MW Capacity
4 Market : ConsentfromKSEBisrequiredfortheproject.Also
apowerpurchaseagreementwithKSEBneeds to
be executed after approval from Kerala State
ElectricityRegulatorCommission(KSERC).
5 Plant&Machinery : Thepowerplant equipments areproposed to be
eitherprocuredindigenouslyorimported.
Rs.Lakhs
: Land&LandDevelopment
(10
Acres
on
lease/
purchase
@
Rs.
5
lacs per acre, including Rs. 10 lacs
rehabilitationcharges)
60.00
: Building&CivilWorksandpipes 500.00
: Plant&Machinery 880.00
6 CostofProject
: TransmissionLine 180.00
: Prel.&PreoperativeExpenses 190.00
: Contingency 90.00
: Total 1900.00
: PromotersContribution 950.00
: TermLoan 950.00
7 MeansofFinance
Total 1900.00
: OptimumUtilization(3rd
Year)
(%ofinstalledcapacity)
60%
: SalesTurnover(Rs.lakhs) 550.00
: Profitbeforeinterest,depreciation&
tax(Rs.lakhs)
440.00
: CashProfit(afterinterest)
(Rslakhs)
280.00
8 Profitabilityatoptimumlevel
: NetProfit (PAT) (Rs.lakhs) 180.00
: DebtEquityRatio 1:1
: DSCR(average) 1.90
: BreakEvenPoint% 36.75%
: IRR(%)(foraperiodof15years) 15.40%
:Pay
Back
period
(Years)
5.35
9 FinancialIndices
: Moratorium 2 Year
Implement
ation
Period + 1
Year
10 Manpower : 14Persons
7/31/2019 Small Hydroelectric Power Plant
2/6
7/31/2019 Small Hydroelectric Power Plant
3/6
7/31/2019 Small Hydroelectric Power Plant
4/6
7/31/2019 Small Hydroelectric Power Plant
5/6
7/31/2019 Small Hydroelectric Power Plant
6/6
Project Profile: Small Hydroelectric Power Plant
6
III. CONCLUSIONTheproposalisfoundtobetechnicallyfeasibleandeconomicallyviable.Theselectionoftheprojectlocationhasan
importantroleforconsistencyinoperationduetowateravailability.
Disclaimer:The findings contained in this Project Profile are based on the initial information collatedthrough primary and secondary research, which is indicative in nature. Reference herein to anyspecific commercial product,process, service by trade name,trademark, manufacturer, orotherwise, does not constitute or imply its endorsement, recommendation, or favoring byKSIDCor any entities thereof.