    Project Profile: Small Hydroelectric Power Plant

    1

    PROJECTSUMMARY

    1 TheProposal : TosetupaSmallHydroelectric PowerPlant

    2 ProposedLocationoftheproject : The following factors need to be thoroughly

    examinedbeforefinalizingthelocation

    a. Water stock consistency during variousseasons

    b. Theheadavailablec. NearnesstoexistingKSEBsubstationd. Population density (for assessing

    rehabilitationrequirements)

    3 Products/Servicesandinstalledcapacity : 3MW Capacity

    4 Market : ConsentfromKSEBisrequiredfortheproject.Also

    apowerpurchaseagreementwithKSEBneeds to

    be executed after approval from Kerala State

    ElectricityRegulatorCommission(KSERC).

    5 Plant&Machinery : Thepowerplant equipments areproposed to be

    eitherprocuredindigenouslyorimported.

    Rs.Lakhs

    : Land&LandDevelopment

    (10

    Acres

    on

    lease/

    purchase

    @

    Rs.

    5

    lacs per acre, including Rs. 10 lacs

    rehabilitationcharges)

    60.00

    : Building&CivilWorksandpipes 500.00

    : Plant&Machinery 880.00

    6 CostofProject

    : TransmissionLine 180.00

    : Prel.&PreoperativeExpenses 190.00

    : Contingency 90.00

    : Total 1900.00

    : PromotersContribution 950.00

    : TermLoan 950.00

    7 MeansofFinance

    Total 1900.00

    : OptimumUtilization(3rd

    Year)

    (%ofinstalledcapacity)

    60%

    : SalesTurnover(Rs.lakhs) 550.00

    : Profitbeforeinterest,depreciation&

    tax(Rs.lakhs)

    440.00

    : CashProfit(afterinterest)

    (Rslakhs)

    280.00

    8 Profitabilityatoptimumlevel

    : NetProfit (PAT) (Rs.lakhs) 180.00

    : DebtEquityRatio 1:1

    : DSCR(average) 1.90

    : BreakEvenPoint% 36.75%

    : IRR(%)(foraperiodof15years) 15.40%

    :Pay

    Back

    period

    (Years)

    5.35

    9 FinancialIndices

    : Moratorium 2 Year

    Implement

    ation

    Period + 1

    Year

    10 Manpower : 14Persons

  • 7/31/2019 Small Hydroelectric Power Plant

    2/6

  • 7/31/2019 Small Hydroelectric Power Plant

    3/6

  • 7/31/2019 Small Hydroelectric Power Plant

    4/6

  • 7/31/2019 Small Hydroelectric Power Plant

    5/6

  • 7/31/2019 Small Hydroelectric Power Plant

    6/6

    Project Profile: Small Hydroelectric Power Plant

    6

    III. CONCLUSIONTheproposalisfoundtobetechnicallyfeasibleandeconomicallyviable.Theselectionoftheprojectlocationhasan

    importantroleforconsistencyinoperationduetowateravailability.

    Disclaimer:The findings contained in this Project Profile are based on the initial information collatedthrough primary and secondary research, which is indicative in nature. Reference herein to anyspecific commercial product,process, service by trade name,trademark, manufacturer, orotherwise, does not constitute or imply its endorsement, recommendation, or favoring byKSIDCor any entities thereof.