SM PANDUIT Advisory Services FlexPod Site Readiness Assessment Services

SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

Embed Size (px)

Citation preview

Page 1: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

PANDUIT Advisory Services

FlexPod Site ReadinessAssessment Services

Page 2: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

Service Value Proposition

FlexPod site readiness assessment services

verify that all required Layer 1 Physical

Infrastructure items are in-place, properly

installed, and correctly configured to ensure a

smooth, efficient, and successful FlexPod

deployment and operation.

PANDUIT Advisory Services

2

Page 3: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

Service overview• Assess seven (7) key aspects of the

data center physical infrastructure• Power• Thermal / Cooling• Network Connectivity• Pathways• Space• Floor loading• Telecommunications Bonding

• Determine if each area is “ready to receive” a FlexPod – “Yes” or “No”

• For “No” areas, determine “level of fix” required and recommend improvement actions

• Provide written “Site Readiness” report

PANDUIT Advisory Services

3

What we do…

Page 4: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

Service overview

PANDUIT Advisory Services

4

Areas assessed…

Item Question answered

Power Is the data center providing the proper power feeds for the FlexPod – Voltage, current rating, phase, frequency, plug style, agency approval?

Cooling Do proper airflow, cabinet arrangement, aisle widths, and temperature conditions exist for the FlexPod?

Data Communications Are the required data cables – quantity, type, media, connector style, uplink ports, communications protocol – in place for the FlexPod ?

Pathways Are suitable under floor or overhead pathways present to accommodate all data and power cables going to / coming from the FlexPod?

Space Will FlexPod fit in the space provided?

Floor loading Will the raised floor support the weight of the FlexPod?

Telecommunications Bonding

Is a proper room-level telecommunications bonding & grounding system installed with available hook-ups for the FlexPod?

Page 5: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

FlexPod site readiness - Power

• Assess 17 detailed aspects needed to properly power the desired FlexPod

• Specific to each FlexPod model• Unique to each site’s FlexPod

configuration

• Ensure proper equipment, POU, and room power configuration:

• Voltage• Amperage (current)• Frequency• Single vs. 3-Phase• Delta vs. Wye topology • POU feeder plug style

• Determine if each item is 100% ready to power the FlexPod – if not, advise on needed upgrades or modifications

PANDUIT Advisory Services

5

What we do…

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

1

5

10

15

20

25

30

35

40

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

1

5

10

15

20

25

30

35

40

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

CHS A56

FAN 1 FAN 5 FAN 2 FAN 6 FAN 3 FAN 7 FAN 4 FAN 8

!

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

CHS A56

FAN 1 FAN 5 FAN 2 FAN 6 FAN 3 FAN 7 FAN 4 FAN 8

!

4

3

2

1

UCS 2104XP

4

3

2

1

UCS 2104XP

4

3

2

1

UCS 2104XP

4

3

2

1

UCS 2104XP

CONSOLE

Cisco UCS 6120XP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20L1 L2 MGMT0 MGMT1

1 2 3 4 1 2 3 4

1 /2/4 G F IB R E C H A N N E L

N10-E0440

SLO

T2

PS2 PS1

CONSOLE

Cisco UCS 6120XP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20L1 L2 MGMT0 MGMT1

1 2 3 4 1 2 3 4

1 /2/4 G F IB R E C H A N N E L

N10-E0440

SLO

T2

PS2 PS1

3

CISCO NEXUS N5548P 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

STAT

ID

3

CISCO NEXUS N5548P 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

STAT

ID

1 2 3 4 5 6

25 26 27 28 29 30

7 8 9 10 11 12

31 32 33 34 35 36

13 14 15 16 17 18

37 38 39 40 41 42

19 20 21 22 23 24

43 44 45 46 47 48

1

5

10

15

20

25

30

35

40

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

1

5

10

15

20

25

30

35

40

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

Front Elevation

Rear Elevation

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

FAN STATUS

CHS A56

FAN 1 FAN 5 FAN 2 FAN 6 FAN 3 FAN 7 FAN 4 FAN 8

!

SLOT

1

SLOT

5

SLOT

3

SLOT7

SLOT

2

SLOT6

SLOT

4

SLOT

8

!

UCS 5108

OK FAIL OK FAIL OK FAIL OK FAIL

4

3

2

1

UCS 2104XP

4

3

2

1

UCS 2104XP

! ResetConsole

! !UCS B200 M1

PS1

PS2

FAN STAT FA

N1FA

N2

FAN STAT

STAT

OK

FAIL

N10-PAC1-550W

OK

FAIL

N10-PAC1-550W

PS1

PS2

FAN STAT FA

N1FA

N2

FAN STAT

STAT

OK

FAIL

N10-PAC1-550W

OK

FAIL

N10-PAC1-550W

! ResetConsole

! !UCS B200 M1

! Reset Console

UCS B230 M1

!2!1

A03-D0100 SSD -LH 100 GB SSD SATA>> A03-D0100 SSD -LH 100 GB SSD SATA>>! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

SLOT

1

SLOT

5

SLOT

3

SLOT7

SLOT

2

SLOT6

SLOT

4

SLOT

8

!

UCS 5108

OK FAIL OK FAIL OK FAIL OK FAIL

! ResetConsole

! !UCS B200 M1

! ResetConsole

! !UCS B200 M1

! Reset Console

UCS B230 M1

!2!1

A03-D0100 SSD -LH 100 GB SSD SATA>> A03-D0100 SSD -LH 100 GB SSD SATA>>! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

SLOT

1

SLOT

5

SLOT

3

SLOT7

SLOT

2

SLOT6

SLOT

4

SLOT

8

!

UCS 5108

OK FAIL OK FAIL OK FAIL OK FAIL

! ResetConsole

! !UCS B200 M1

! ResetConsole

! !UCS B200 M1

! Reset Console

UCS B230 M1

!2!1

A03-D0100 SSD -LH 100 GB SSD SATA>> A03-D0100 SSD -LH 100 GB SSD SATA>>! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

! ResetConsole

! !UCS B250 M1

0a 0bLNK LNK

0c

0d e0b

e0a

c0b

c0a1

2

0a 0bLNK LNK

0c

0d e0b

e0a

c0b

c0a1

2

FAS3210FAS3210

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

4 5 6 70 1 2 3 12 13 14 158 9 10 11 20 21 22 2316 17 18 19

DS2246

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

4 5 6 70 1 2 3

12 13 14 158 9 10 11

20 21 22 2316 17 18 19

DS2246

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

4 5 6 70 1 2 3 12 13 14 158 9 10 11 20 21 22 2316 17 18 19

DS2246

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

FAN STAT

FAN STAT FAN1

FAN2

PS1

PS2

FAIL

OK

FAIL

OK

CONSOLEL2

MGMT0L1

STAT

ID

FAN STAT

FAN STAT FAN1

FAN2

PS1

PS2

FAIL

OK

FAIL

OK

CONSOLEL2

MGMT0L1

STAT

ID

Cable Pass-through

M

ï¡ ï¡ ï

1 /M 2

! ! ! !

PSU MEM CPU !Console Reset

UCS C200 M1

M

ï¡ ï¡ ï

1 /M 2

! ! ! !

PSU MEM CPU !Console Reset

UCS C200 M1

A

B

1

2

LNK LNKIOM6

IOM6

LNK LNKIOM6

IOM6

DC AC

x22

DC AC

x22

4 5 6 70 1 2 3 12 13 14 158 9 10 11 20 21 22 2316 17 18 19

DS2246

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

600GB

Page 6: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

FlexPod site readiness - Cooling

PANDUIT Advisory Services

6

What we do…• Measure 41 inter-related parameters to

ensure proper thermal performance for the FlexPod

• Overall layout and room conditions• Raised floor air handling capabilities• Overhead air return performance• Room-level or in-row cooling unit capacities and

operating conditions• Recirculation or by-pass air issues

• Target specific air temperature ranges, air flow speeds, and air volume numbers

• Particular to each FlexPod model• Dependent on each site and FlexPod

configuration

• Verify that the data center can properly cool the FlexPod or if there will be thermal issues that require additional attention

Page 7: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

FlexPod site readiness – Networking

• Confirm that the proper data communications links are available and ready to connect to the FlexPod

• Production data connections• Management port channels• Topology and redundancy• Data cabling type, grade, and connector style• Cable routing and pathways• 36 point detailed assessment

• Get specific regarding port availability and channel counts

• Precise requirements for each FlexPod model, and individual configuration

• Detail needed improvements or additions

• Action plan for required modifications• Data communications upgrade kits available

PANDUIT Advisory Services

7

What we do…

Page 8: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

Engagement Fee

PANDUIT Advisory Services

8

FlexPod models Site Readiness Assessment Fee Panduit P/N Includes

Custom FlexPod

1 Cab Flexpod Assessment$ 3,776

2 Cab FlexpodAssessment$ 4,602

GSDCAFLXPA

• Pre-visit coordination• On-site Assessment• Travel time to and

from site• All travel expenses• Readiness Report

generation• Site improvement

action plan• Review with Partner

and End User

Page 9: SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly

SM

Next Steps Discussion

9