SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS – RECENT EXPERIENCE AND
CONSTRUCTION CHALLENGES IN THE NORTHERN
1Three Rivers Levee Improvement Authority
CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA
Deep Foundation InstituteSlurry Wall Committee
July 22, 2010
2Three Rivers Levee Improvement Authority
TRLIA Cutoff Walls Designed by GEI
2
Bear River
Setback Levee
Feather River
Setback Levee
Feather River Levee
Segments 1 and 3 Total
Soil‐Bentonite Cutoff WallSoil Bentonite Cutoff Wall
Length (LF) 9,390 25,800 2,600 37,790
Max Depth (FT) 70 78 68 78
Area (SF) 439,000 1,668,000 176,000 2,283,000
Soil‐Cement‐Bentonite Cutoff Wall
Length (LF) 11,100 11,100
Max Depth (FT) 65 65
Area (SF) 620,000 620,000
3Three Rivers Levee Improvement Authority
Summary of TRLIA Cutoff Walls Designed by GEI
SOIL-BENTONITE CUTOFF WALL
4Three Rivers Levee Improvement Authority
3
TYPICAL SOIL-BENTONITE CUTOFF WALL SPECIFICATION:
WALL WIDTH: 3 FT
BACKFILL PERMEABILITY: LESS THAN 5 X 10-7 CM/SEC
CONTENT OF DRY BENTONITE IN THE BACKFILL: NOT LESS THAN
1.5% BY WEIGHT
DEPTH OF KEY INTO PREVIOUSLY EXPLORED FINE-GRAINED
STRATUM: NOT LESS THAN 3 FT
5Three Rivers Levee Improvement Authority
BACKFILL FINES CONTENT: NOT MORE THAN 50%
6Three Rivers Levee Improvement Authority
Soil-Bentonite Cutoff Wall Under Setback Levee
4
7Three Rivers Levee Improvement Authority
Soil-Bentonite Cutoff Wall Under Setback Levee
Heading Overlaps
POTHOLE TO CONFIRM LOCATION OF EXISTING WALL
MONITOR TRENCH EXCAVATION CUTTINGS TO CONFIRM
EXCAVATION INTO EXISTING WALL
4(H):1(V) SLOPE OF CUT INTO EXISTING WALL
MINIMUM 10-FOOT OVERLAP AT THE BOTTOM
8Three Rivers Levee Improvement Authority
5
CUTOFF WALL ADJACENT TO CULTURAL SITE
9Three Rivers Levee Improvement Authority
10Three Rivers Levee Improvement Authority
Wall Construction Adjacent to Sensitive Cultural Site
6
11Three Rivers Levee Improvement Authority
Wall Construction Adjacent to Sensitive Cultural Site
PREVENTIVE MEASURES TO AVOID TRENCH CAVE-IN
RAISED SLURRY LEVEL
INCREASED WORK HOURS
ALLOWED TOE OF BACKFILL CLOSER TO EXCAVATION FACE
ATTEMPTED TO INCREASE SLURRY UNIT WEIGHT
ATTEMPTED TO STIFFEN BACKFILL TO STEEPEN THE BACKFILL
SLOPE WITHIN TRENCH
12Three Rivers Levee Improvement Authority
7
13Three Rivers Levee Improvement Authority
Wall Construction Adjacent to Sensitive Cultural Site
CUTOFF WALL AT TOE OF EXISTING LEVEE
14Three Rivers Levee Improvement Authority
8
15Three Rivers Levee Improvement Authority
Soil-Bentonite Cutoff Wall at Toe of Levee
16Three Rivers Levee Improvement Authority
Soil-Bentonite Cutoff Wall at Toe of Levee
9
17Three Rivers Levee Improvement Authority
Longitudinal Crack Along Landside Levee Slope
18Three Rivers Levee Improvement Authority
Inclinometer Plot – Levee with Longitudinal Crack
10
19Three Rivers Levee Improvement Authority
Foundation Shear Strength Characterization
20Three Rivers Levee Improvement Authority
Field Vane Shear Strength of Cutoff Wall Backfill
(6 months after construction of cutoff wall)
11
21Three Rivers Levee Improvement Authority
Repair Section – Levee with Longitudinal Crack
SOIL-CEMENT-BENTONITE
CUTOFF WALL
22Three Rivers Levee Improvement Authority
12
23Three Rivers Levee Improvement Authority
Soil-Cement-Bentonite Cutoff Wall Through Levee
TYPICAL SOIL-CEMENT-BENTONITE CUTOFF WALL SPECIFICATION:
WALL WIDTH: 2.5 FT
BACKFILL PERMEABILITY: LESS THAN 5 X 10-7 CM/SEC
BACKFILL UNCONFINED COMPRESSIVE STRENGTH: 30 TO 300 PSI
DEPTH OF KEY INTO PREVIOUSLY EXPLORED FINE-GRAINED STRATUM:
INCREASED TO NOT LESS THAN 8 FT AFTER CONCERNS RAISED AS
PART OF SAFCA WORK ABOUT CONTINUITY OF BACKFILL AT THE
BOTTOM OF THE WALL
24Three Rivers Levee Improvement Authority
13
25Three Rivers Levee Improvement Authority
Soil-Cement-Bentonite Cutoff Wall Through Levee
26Three Rivers Levee Improvement Authority
Exposed Recently Constructed Cutoff Wall
14
CONSTRUCTION ISSUES WE ENCOUNTERED
TRENCH CAVE-IN
LARGE OBSTRUCTION
BACKFILL WITH HIGHER-THAN-SPECIFIED PERMEABILITY
27Three Rivers Levee Improvement Authority
CUTOFF WALL TRENCH CAVE-IN
28Three Rivers Levee Improvement Authority
15
29Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in – Levee Profile
30Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in - Plan
16
31Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in – Cross Section
32Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in – Temporary Berm
17
33Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in
Final Repair Plan and Profile
34Three Rivers Levee Improvement Authority
Cutoff Wall Trench Cave-in
Final Repair Seepage Berm
18
CUTOFF WALL TRENCH
OBSTRUCTION
35Three Rivers Levee Improvement Authority
36Three Rivers Levee Improvement Authority
Obstruction in Levee Foundation
Abandoned Pump Station Sump
19
37Three Rivers Levee Improvement Authority
Obstruction in Levee Foundation
Backfilled Excavation
CUTOFF WALL REACH WITH HIGHER-
THAN-SPECIFIED PERMEABILITY
38Three Rivers Levee Improvement Authority
20
39Three Rivers Levee Improvement Authority
Cutoff Wall with Higher Permeability – Permeability Data
CUTOFF WALL REACH WITH HIGHER-THAN-SPECIFIED PERMEABILITY
Permeability Data:
Average of 44 QC Tests: 9.1x10-7 cm/sec
Maximum Value of QC Permeability Tests: 2.2x10-6 cm/sec
Average of 4 QA Tests: 5.8x10-7 cm/sec
Maximum Value of QA Permeability Tests: 7.1x10-6 cm/sec
40Three Rivers Levee Improvement Authority
21
41Three Rivers Levee Improvement Authority
Cutoff Wall with Higher Permeability
Unconfined Strength Data
42Three Rivers Levee Improvement Authority
Cutoff Wall with Higher Permeability – Piezometers