    Minimax ProgrammeMinimax Programme

    DifferentiatingDifferentiating Solutions forSolutions for

    SludgeSludge TreatmentTreatment inin thethe

    FoodFood && BeverageBeverage industryindustry

  • 7/27/2019 Sludge Solutions f b

    2/14

    Key DriversKey Drivers

    z Legislative Requirements

    z Product recycling & valorization

    \ Agricultural (SEDE)

    \ Other valorization

    z Price competitiveness

    z Health and Safety: public reluctance

    \ Sanitary aspects: Mad-Cow Disease (BSE), Dioxins,

    pesticides,

    \ N.I.M.B.Y syndrome : odours

    Regard sludge as

    added value product ,not as disposal waste

  • 7/27/2019 Sludge Solutions f b

    3/14

    Minimax programme:Minimax programme: thethe argumentsarguments

    Thanks to MiniMax, VEOLIA WATER is the best

    partner to help making long term responsible

    decisions :

    1. Take optimal action on the wastewater treatment

    train by reducing sludge volume

    2. Maximize health safety and sludge quality for a

    safe recycling and valorization

    3. Minimize odourproblem

  • 7/27/2019 Sludge Solutions f b

    4/14

    DisposalDisposal routesroutes andand adaptedadapted sludgesludge treatmentstreatments

    Food & Beverage Industry = Organic Sludge / light pollution

    Valorization in Agriculture Landfilling and other valorizations

    1) Dewatering

    2) Composting / Liming

    3) Treatment at the source:hydrolysis / sludge methanisation

    4) Drying

    1) Drying

    2) Incineration

  • 7/27/2019 Sludge Solutions f b

    5/14

    SpecificSpecific MinimaxMinimax offeroffertoto thethe F&BF&B

    Liquid Stabililzation

    Chemical: liming

    Biological: methanization

    Thickening

    Incineration

    PYROFLUID

    BIOCON

    VALORIZATION

    IN

    AGRICULTUREDewatering

    Pasty stabilization

    chemical: liming

    biological: COMPOSTING

    Drying: BIOCON

    Raw Sludge

    Wet Air

    Oxidation

    (W.A.O)

    BIOTHELYS

    LANDFILLING

  • 7/27/2019 Sludge Solutions f b

    6/14

    44 ClassicalClassical treatmentstreatments forfordewateringdewatering

    1) Dewatering Table

    2) Belt Press

    3) Centrifugation

    4) Filter Press

  • 7/27/2019 Sludge Solutions f b

    7/14

    COMPOSTING (SEDE)COMPOSTING (SEDE)

    Principle

    Aeration of sludge mixed with other organic products, during

    several weeks

    + -

    Stabilisation

    Hygienisation

    Drying (60% dryness)

    No need for energy

    Large surface area required

    Needs for maintenance

    Needs for commercializing the compost

  • 7/27/2019 Sludge Solutions f b

    8/14

    BIOTHELYSBIOTHELYS (1)(1)

    Principle Increase in pressure (15 bar) and temperature (175C)

    Hydrolysis + Biological Treatment

    Gas Exit

    Exchanger

    BIOTHELYS

    Thickened sludge

    W.A.O Reactor

    (175C; 15 bar; 45 min.)Centrifugation

    Fiber

    sludge

    Thickening

    Diluted sludge

    Dry Gas

    Condensate

    Centrate

    Sludge blow down

  • 7/27/2019 Sludge Solutions f b

    9/14

    BIOTHELYSBIOTHELYS (2)(2)

    + -

    Only process to reduce SS

    (until 50%)

    Hygienisation

    Volume reduction until 75% due to

    increase in dryness

    Needs for energy and steam

    Sludge must be thickened before

    entering the system

    COD returns to the biological

    tank

  • 7/27/2019 Sludge Solutions f b

    10/14

    BIOCONBIOCONdryerdryer (1)(1)

    Principle: Indirect drying process on two moving belts bearing the sludge

    Thicked sludgebiosolids : 17 30%

    Wet air

    towards

    condenser

    Air

    Hot dryer

    Temp.: 180 140C

    Hot oil

    Hot water Temp.: 85C

    MS: 50 60%

    Dried sludge

    biosolids > 90%

    1 hour treatement

  • 7/27/2019 Sludge Solutions f b

    11/14

    BIOCONBIOCONdryerdryer (2)(2)

    +

    -

    Production of pellets up to 90% dryness

    Use of all energy sources (Biogas, fuel) No odour emission

    Indirect heating of drying air

    Low drying temperature Continuous or non continuous process

    Higher energy consumption than direct drying

  • 7/27/2019 Sludge Solutions f b

    12/14

    PyrofluidPyrofluidincineratorincinerator

    flue gas

    fluidisation airwet sludge

    arch

    freeboard

    Sand fluid bed

    duct

    cooling water

    refractory lining

    fuel

    wind box

    + Low maintenance

    Easy to operate

    Long life expectancy

    No dioxin mission

    In accordance with gas treatment

    regulations

    C l tC l t Mi iMi i ffff ll i l di l d

  • 7/27/2019 Sludge Solutions f b

    13/14

    CompleteComplete MinimaxMinimax offerofferalsoalso includesincludes

    z Athos: Wet Air Oxidation (W.A.O.)

    Thermal oxidation without smoke treatment required

    z Saphyr: thermal dewatering

    Sludge stabilization and odour reduction

    z Aquilair and Alizair: physico-chemical and

    biological odour treatments

    z Solia : solar drying with aerobic fermentation

    NEW

    C t tContacts dand t ltools

  • 7/27/2019 Sludge Solutions f b

    14/14

    ContactsContacts andand toolstools

    z Jean Pierre Levasseur (Sludge department)

    z D. Cretenot (Sludge department)

    z

    Philippe Mouroux (Industrial Water department)

    z Tools available:

    Minimax posters presenting all VWS sludge treatmentproducts

    Biocon CD-Rom

    Athos CD-Rom

    Brochures: sludge management