Upload
peng-wang
View
214
Download
1
Tags:
Embed Size (px)
DESCRIPTION
from Portman Assoc. and HOK Group
Citation preview
Work Samples Work Samples - Peng Wang
Zayed Center, LahoreHigh-rise Mixed-
Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal
Zayed Center, Lahore-use Complex
Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal
Bird’s Eye View RenderingBird’s Eye View Rendering
Area SummaryArea Summary
• Total: 4,802,800 SF.• Office: 1,368,000 SF.• Hotel: 530,000 SF.• Apartments: 2,170,400 SF.• Retail: 696,200SF.• Cineplex: 38,200 SF.• Car Parking: 2,800 Cars
Harbour Station, Woodbridge, VAHigh-rise Service Apartment Complex
Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal
Harbour Station, Woodbridge, VArise Service Apartment Complex
Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal
Shanghai Jin Hongqiao CenterHigh-rise Office + Low
Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director
Shanghai Jin Hongqiao Centerrise Office + Low-rise Retail
Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director
Bird’s Eye View RenderingBird’s Eye View Rendering
Design Concept – City GateBird’s Eye View Rendering
City Gate, ShanghaiBird’s Eye View Rendering
Ground Floor Plan & North ElevationGround Floor Plan & North Elevation
Typical Low-RiseTower Plan & South ElevationRiseTower Plan & South Elevation
Hilton Bayfront Hotel & Convention CenterSan Diego, CA
High-rise Hotel + Convention Center
Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director
Hilton Bayfront Hotel & Convention CenterSan Diego, CA
rise Hotel + Convention Center
Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director
Bird’s Eye View RenderingBird’s Eye View Rendering
Project DataProject Data
l Hilton Bayfront Hotel
l 1190 room convention center hotel
l 92,900 sq. meters
l Two Large ballrooms (3160 sq. meters and 2230 sq. meters)
l 15,330 sq. meters total meeting space
l Three restaurants
Design Experience•The site was prone to eartquakes, requiring special structure throughout the building
•Our assignment during this project was to work with the developer to design and address voluminous project conditions.
•The site location adjacent to the bay had salt-laden air, complicating details which had metal exposed to the air
Design Experience•The site had been a ship building yard previously, so there was a necessity to remediate the soil
Ground Floor Plan, Views of Spa & BarGround Floor Plan, Views of Spa & Bar
Vertical Transportation
• From early design development to substantial completion took 3.5 years.
• Vertical transportation including elevator core/lobby and escalator lobby were part of my responsibility from design concept through construction document phase.
Vertical Transportation
Guestrooms
• From early design development to substantial completion took 3.5 years.
• Trying to get more guestrooms to enjoy the bay view.
Guestrooms