ENVIRONMENTAL SCOPING MEETING FOR THE TURKEY POINT SITE UNITS 6 & 7 COMBINED LICENSE APPLICATION July 15, 2010 PUBLIC MEETING Laurel Bauer, Branch Chief Andrew Kugler, Environmental Project Manager Tomeka Terry, Environmental Project Manager

Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

ENVIRONMENTAL SCOPING MEETING FOR THE TURKEY POINT SITE

UNITS 6 & 7COMBINED LICENSE APPLICATION

J u l y 1 5 , 2 0 1 0

PUBLIC MEETING

Laurel Bauer, Branch ChiefAndrew Kugler, Environmental Project ManagerTomeka Terry, Environmental Project Manager

Page 2: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Purposes of this meeting

oDescribe the NRC’s review process.

oProvide the schedule for the NRC’s review.

oDescribe how you can provide comments on the review scope.

oListen to and gather your comments.

2

Page 3: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

U.S. Nuclear Regulatory Commission

o NRC’s mission:o Protect public health and safetyo Promote common defense and

securityo Protect the environment.

o The NRC is an Independent Agency.

o The NRC has over 30 years of experience regulating operating reactors and other civilian uses of nuclear materials.

3

Source: U.S. NRC

Page 4: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

US Army Corps of EngineersBUILDING STRONG®

Megan ClouserSenior Project ManagerJacksonville District

July 15, 2010

U.S. Army Corps of EngineersCooperating Agency

FP&L Turkey PointUnits 6 and 7

Page 5: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

U.S. Army Corps of Engineers (USACE)Regulatory Role and Authority

USACE is the federal agency responsible for administering Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899.

USACE regulates the discharge of dredged or fill material into all jurisdictional waters of the United States and structures in, over and under waters of the United States.

USACE permit decisions are “federal actions” and must comply with the National Environmental Policy Act (NEPA).

Page 6: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

Cooperating Agency Status

The Nuclear Regulatory Commission (NRC) is the “Lead Agency” in the preparation of this Environmental Impact Statement (EIS).

USACE is a “Cooperating Agency” in the preparation of the EIS.

The final EIS will serve as the primary environmental document on which USACE permit decisions will be based for this proposed project.

Page 7: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

USACE Jurisdictionin Fresh Water Systems

Descarga de dragado o de material de relleno

PANTANOSCIENAGAS

HUMEDALES DE AGUA DULCE

TIERRAS ALTAS

RIOSARROYOSLAGOSESTANQUES HUMEDALES DE AGUA

DULCE

TIERRAS ALTAS

PANTANOSCIENAGAS

Todas las estructuras y trabajos si son aguasnavegables de E.U.

USACE Jurisdicción Reguladorade AGUA DULCE

Nivel de Agua Regular

Page 8: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

USACE Jurisdictionin Tidal Waters

TIERRAS ALTAS

HUMEDALES SALOBRES O DE AGUA FRESCA

CIENAGAS ALTAS

CIENAGAS BAJAS PLANICIE DE MAREA

AGUAS TERRITORIALES

USACE Jurisdicción Reguladorade AGUAS DE MAREA

MAREA BAJA PROMEDIO

MAREA ALTA PROMEDIO

MAREA MÁS ALTA

Descarga de Dragado o de Material de Relleno

Si Existen HumedalesMás Allá de la Marea

Más Alta (Anual)

Todas Las Estructuras y Trabajo

Transporte Para la Eliminación de Material Dragado

Estructuras FijasIslas Artificiales

PLAT

AFO

RM

A C

ON

TIN

ENTA

L EX

TER

IOR

LIM

ITE

DE

3M

ILLA

S

Page 9: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

Public Participation with USACE

Public involvement and participation are important to USACE and are critical to EIS preparation.

Comments received at this meeting will be considered in the preparation of the draft EIS and subsequent permit decisions.

Page 10: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

Proposed Impacts to Waters of the U.S.1

► Units 6 & 7 – Reactor Site Including Administration Buildings & ParkingWetlands: ~251.8 acres fill impactOpen waters: ~24.5 acres fill impact

► All Proposed Transmission Lines (Corridors)Wetlands : ~308 acres

► Deep Well Injection Work activities are proposed under waters of the United States

► Reclaimed Water Pipelines Wetlands: ~45 acres fill impact (some impacts may be temporary)

1 Jurisdictional determination for these impacts has not yet been made.

Page 11: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

Proposed Impacts to Waters of the U.S.1► Reclaimed Water Facility

Wetlands: ~44 acres fill impact

►Barge Unloading AreaOpen waters: ~0.1 acres

► Access RoadsWetlands: ~81.6 acres fill impact (some impacts may be temporary)

► Radial WellsStructures are proposed under waters of the United States

► Potable Water Pipelines Wetlands: ~3.4 acres fill impact (some impacts may be temporary)

1 Jurisdictional determination for these impacts has not yet been made.

Page 12: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

USACE Permit Decisions

USACE Public Notice will coincide with the publication of the draft environmental impact statement. The Public Notice will be posted at the following website:

http://www.saj.usace.army.mil/Divisions/Regulatory/publicnotices_Florida.htm

The USACE permit decision on the proposed project will be made after the Final EIS has been completed but will likely precede NRC combined license decision.

Page 13: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

BUILDING STRONG®

Contact

[email protected]

Page 14: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Combined License

o Florida Power & Light (FPL) has applied for combined licenses (COLs) for two new nuclear units (Units 6 & 7) at the Turkey Point Site.

o A combined license gives authorization to build & operate a new nuclear unit.

o Units 6 & 7, if approved, would be built on the same site as Turkey Point Units 1 - 5.

o There are two NRC reviews for the TurkeyPoint COL application – safety and environmental.

o There will also be a formal hearing on the two reviews.

14

Source: FPL Environmental Report

Page 15: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Getting Involved in the Hearing

oPetition to Interveneo Deadline to file is August 17, 2010, see the June 18, 2010

Federal Register Notice (75 FR 34777).

oDigital certificate or waiver required for filing a petition.

o Instructions for e-filing are in the hearing notice or at www.nrc.gov/site-help/e-submittals.html.

oAllow 5 business days for obtaining the digital certificate.

Page 16: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

National Environmental Policy Act

oNEPA requires Federal agencies to use a systematic approach to consider environmental impacts.

oAn Environmental Impact Statement (EIS) is required for major Federal actions that may significantly affect the quality of the human environment.

o Issuing a combined license is considered a major Federal action.

16

Page 17: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Environmental Review

o NRC is reviewing the combined license application and is the lead agency.

o U.S. Army Corps of Engineers, Jacksonville District is reviewing a Corps permit application for Units 6 & 7 and is a cooperating agency on the environmental review and preparationof the EIS.

o The NRC and Corps staff make up the review team.

17

Page 18: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Review Process & Schedule

o Published Federal Register notice June 15, 2010.

o Scoping period from June 15 to August 16, 2010; scoping meetings today in Homestead.

o Expect to publish draft EIS inOctober 2011.

o There will be a 75-day comment period on the Draft EIS.

o Final EIS expected to be published in October 2012.

NR

C’s

NEP

A Pr

oces

s

Notice of Intent to Conduct Scoping and

Prepare EIS

Scoping Process

Notice of Availability of Draft EIS

Public Comments on Draft EIS

Notice of Availability of Final EIS

18

Page 19: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Resource Areas

19

Meteorology and Air QualityAlternative Energy

Sources

RadiationProtection

Fuel Cycle/Waste/

Accident Analysis

TerrestrialEcology

Land Use

Socioeconomics/Environmental Justice

AquaticEcology

Hydrologic Sciences(Surface and Groundwater)/

Water Use and Quality

Archaeology/Cultural Resources Alternative Sites

Source U.S. NRC

Page 20: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Environmental Scoping

oThis process helps determine what NRC should review.

oComments during the scoping period can be provided through August 16, 2010.

oScoping Summary Report will provide responses to comments received.

20

Page 21: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Access to the Environmental Report

21

http://www.nrc.gov/reactors/new-reactors/col/turkey-point/documents.html#application

Homestead Branch Library700 North Homestead BlvdHomestead, FL

Or

South Dade Regional Library10750 SW 211th StreetMiami, FL

Page 22: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

Submitting Scoping Comments

[email protected]

Chief, Rulemaking and Directives Branch (RDB)Division of Administrative ServicesMailstop TWB-05-B01MU.S. Nuclear Regulatory CommissionWashington DC, 20555-0001

Fax to RDB at (301) 492-3446

COMMENTS ARE DUE BY AUGUST 16, 2010.

Page 23: Slides for Environmental Scoping Meeting for the Turkey Point … · 2012-12-03 · Statement (EIS). USACE is a “Cooperating Agency” in the preparation of the EIS. The final EIS

NRC Contacts

Andrew J. Kugler, Sr. Environmental Project Manager800-368-5642, X2828, [email protected]

Tomeka Terry, Environmental Project Manager800-368-5642, X1488, [email protected]

Manny Comar, Lead Project Manager800-368-5642, X3863, [email protected]