40
GINNA STATION B-STEAM GENERATOR NRC MEETING MARCH 23, 1982 AGENDA o INTRODUCTION o INSPECTION AND EXAMINATION RESULTS o DAMAGE MECHANISM EVALUATION o RECOVE RY PROGRAM o TECHNICAL BASIS FOR REPAIRS o PLANT SCHEDULE o CONCLUSION'

Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

AGENDA

o INTRODUCTION

o INSPECTION AND EXAMINATION RESULTS

o DAMAGE MECHANISM EVALUATION

o RECOVE RY PROGRAM

o TECHNICAL BASIS FOR REPAIRS

o PLANT SCHEDULE

o CONCLUSION'

Page 2: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

OBJECTIVES

o DETERMINE FULL EXTENT OF DEFECTS AND LOOSE PARTS

o DETERMINE FAILURE MECHANISM(8)

o RESTORE STEAM GENERATOR TO A CONDITION WHICH IS SAFE TOOPERATE MAINTAININGRADIATION EXPOSURES AS LOW ASREASONABLY ACHIEVABLE

o OBTAIN NRC CONCURRENCE FOR RETURN TO POWER

Page 3: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

PURPOSE OF MEETING

o TO REVIEW RESULTS OF INSPECTIONS TO DATE

o TO OBTAIN CONCURRENCE WITH STEAM GENERATORPROGRAM CONCEPTS

o TO'OBTAIN APPROVAL FOR REMOVAL OF STEAM GENERATOR. TUBE SECTIONS

Page 4: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

NSARB C REVIEWS

o concurrence with program concepts

NSARB - 2/26

NRC - 3/1

o approval of removal of metallurgical samples

NSARB - 2/26

NRC — 3/1

o approval of repair program

NSARB — 3/16

NRC — 3/23

o approval of return to power

NSARB — mid AprilNRC — late April

Page 5: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

M I.~—* ~+)i~i* ' c

RGCE Bteam Generatorc

c c

cll=8l87558581911757571LAQ45LECA595755555)+94745454l 393735333l 292725232l l9l7 l5 i3 ll 9 7 5 3 I

COLUM}2 L14 05 54525 44 32 28 22 i8 ie i~ l2 l0

4~ ~

~ ~ ~ ~ ~ ~

'c ~

~ ~

~ ~

~ ~

~yc~ ~

45' ~

cp~ ~ ' ~

~ ~ ~P

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

RO

MANV/AY C Pt uGGED TuaESS

UB.FS'OZZLE~

Page 6: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

i.c'INNA

STATION.B-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

INSPECTION UPDATENO. 4 WEDGE AREA

o R45C54

-missing and severed at first support plate

o R44C54

-severed at top of tubesheet

o R44C55

-severed at top of tubesheet

-partially severed at first support plate

o R43C55

-severed at top of tubesheet,

o R44C56

-missing and severed at first support plate

o R44C57I

-missing and severed at first support plate

Page 7: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA=STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

METALLURGICAL EXAMINATION

o site photography

o Westinghouse R&D laboratories

o model for wear orientation comparisons

o photography at.'90'ncrements

o radiography at 45'ncrements

o transverse cross sections of column 55 tubes

-R42C55 - 2.5" and 4" from upper end

-R43C55 - 2.5" and 4" from upper end

-R44C55 -'.5",'" .and 8" from upper end

-SEM and standard photomicrographs

Page 8: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GXNNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

LABORATORY EXAMINATION REMOVED TUBING

WEAR SURFACES

0 PRXMARXLY RUBBING WEAR CIRCUMFERENTIAL DXRECTXON

0 NO EVIDENCE OF CORROSION XNVOLVEMENT

0 EVXDENCE OF SURFACE COLD WORKING

0 FATIGUE STRIATION ON FRACTURE SURFACE

0 TENSILE OVERLOAD BURST TUBE FAILURE,SURFACE

Page 9: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

R. E.. GINNA S/G 8 - POSTULATED TUBE RUPTURE MECHANISM .

FOREIGN OBJECT IN HIGH

FLUID VELOCITY FIELD

LATERAL IMPACT/WEAR ON PLUGGED TUBES

TUBE COLLAPSE

FATIGUE TEAR

TUBE SHREDDING/

FRAGMENTATION TUBE SEVERANCE,

TUBE WHIP

IMPACT/WEAR ON

PLUGGED TUBES

WEA% ON

ACTIVE TUBE

TUBE RUPTURE

Page 10: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

MECHANISM EVALUATION PROGRAM

I INVESTIGATION OF. VARIOUS INFLUENCES

MECHANICAL LATERAL LOADS

GROSS FLUID LOADS

AXIAL LOADS

LOCAL FLUID LOADS

4 HISTORICAL .INFORMATION REVIEW

0 INITIAL PERIMETER TUBE 'INVESTIGATION''

4 LABORATORY EXAMINATIOH OF REMOVED TUBE SECTIONS

4 MODEL TESTING

0 LABORATORY COLLAPSE AND FATIGUE TESTING

4 FIEL'D TESTING AND EXAMINATIOH

Page 11: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

LATERAL''LOADS

0 EXTERNAL PRESSURE

0 TUBE OVALITY

0 VARYING LEVELS OF CONCENTRATED LOADS

0 VARYING LEVELS .OF TUBE MALL THICKNESS

I AXIAL LOAD AFFECT

Page 12: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GROSS FLUID LOADS

1 FLUID ELASTIC INTERACTION ANALYSIS

FLOM VELOCITIES

TUBE CROSS SECTION

FLUID ELASTIC STABILITY

VORTEX SHEDDING

CROSS FLOW

0 EFFECT OF TUBE.REMOVAL ON FLUID FLOM FIELD

Page 13: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

'AXIAL 'L'OADS

0 STRUCTURAL EVALUATION

TUBE-TO-SHELL MISMATCH

TUBE-TO-TUBE MISMATCH

MISAL I GNMENT

, TUBESHEET-SUPPORT PLATE MISMATCH

TUBESHEET ROTATION

STRESS CONCENTRATION

0 U-BEND WITH REMOVED SECTION

Page 14: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETXNGMARCH 23, l982

LABORATORY EXAMINATXON REMOVED TUBING

0 WEAR SURFACES

0 PRIMARXLY RUBBING WEAR CIRCUMFERENTXAL DIRECTION

0 NO EVXDENCE OF CORROSXON INVOLVEMENT

0 EVIDENCE OF SURFACE COLD WORKING

FATIGUE STRIATION ON FRACTURE SURFACE

0 TENSILE OVERLOAD BURST TUBE FAILURE SURFACE

Page 15: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

RQQLS INLET FLOtf NlML

SHBLL

', ~

r ~

L,

'OLD PLNf TEST LCQP'%8K.

""'ACILHY

TAMPA PLOMB;', KLNrl Ol gNBIN CMGCT-

Page 16: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

LABORATORY TESTING

0 COLLAPSE TESTING

EXTERNAL PRESSURE

LATERAL LOADS

AXIAL LOAD

FATIGUE TESTING

AMPLITUDES

GEOMETRY

BOUNDARY CONDITION

AXIAL LOAD

Page 17: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETING,MARCH 23, 1982

CORRECTIVE ACTIONS

eddy current examination

o video inspections

o - obtain metallurgical samples

o remove structurally degraded tube sections

o restore preventatively plugged tubes to service

o remove foreign objects and tubing fragments

o eddy current examine tubes. adjacent to repairs

o secondary side video inspection following repairs

o primary and secondary hydrostatic tests

o metal impact monitoring system

Page 18: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

NRC MEETINGMARCH 23, 1982

REPAIR OPTIONS

o EDM cutting process

o mechanical cutters

o 'hydraulic tube removal system

o loose parts retrieval equipment

o remove from tubesheet end

o additional shell penetrations

o proven repair techniques

Page 19: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATION

B-STEAM GENERATOR

NO. 4 WEDGE AREA

COLUMN "62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46

+ +4-o o o

45.

o o o 44O~ I

0 0 o o o 0 6

o o o o o o o

0 ~ 0 0 0 0 0 0 0

43

42

0 0 0 0 0 0 O Q 0 0 Q 0 0 0 0 0 0

O O O O O O O O O O 0 0 0 0 0 0 0

41

40 ROW

Pulled April 1978 (1 tube)

Structurally Degraded (19 tubes)

Video Indication (1 tube)

~Eddy Current Signal (5 tubes)

Q Preventatively Plugged (3 tube's)

Page 20: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

I I GINNA STATION

B-STEAM GENERATOR

NO. 6 WEDGE AREA

COLUMN 92 91 90 89 88 87 86

0. 0 O.

0 0 '0

+ 0 0 0

+ 0 0 0

0 0 0.~5

0 0 0 0 >4

+ 0 0 0 0

0 0 0 0 0

Q 0 0 0 10I

0 0 0 0 9+ 0

0 0 0 0 0\

+ 0

0 0 0 0 0 '0 8

0 0 O. 0 0 0 0 ROW

Structurally Degraded (5 tubes)~

~

~Video OD Indication'(5 tubes)Eddy Current Signal (1 tube)

3/19/82

Page 21: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATION

B-STEAM GENERATOR

RC40C70 AREA

COLUMN 77 76 75 74 '3 72 71 70 69 68 67 66 65

0 41

0 0 40

+++ 0 0 0

+ + 0 0 0 0 0 0

0 0 0 0 O.O 0 0 0

0 0 0 0 0 0 0 0 0 0

0 ~ 0 0 0 0 0 0 0 0 0 O.

0 Q 0 0 0 0 0 0 G 0 0 0 0 34 ROW

S tructurally Degraded (no tubes)

Video OD Indication-(5 tubes)~~ Eddy Current Signal (4 tubes)

3/19/82

Page 22: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

l ~

gpLL

---'-"p"ppER-

t

I )

l . l

88

'I'T

/!

/~s

3

:( J IQl

I

I

i

iv seI'$

5;3 .5.:2

T

Page 23: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

GINNA STATIONB-STEAM GENERATOR

CATEGORIZATION OF DEFECTS

CATEGORYl

1. StructurallyDegraded

2. VideoOD Indication

3. Eddy CurrentSignal

NO. 6WEDGE AREA

R8C92R11C91R12C91R14C90R15C90

R9C91R10C91R13C90R16C89R17C89

R15C89

R40C70AREA

R38C71R38C72R39C68R39C69R39C70

R35C75R40C67R40C68R41C66

R42C55MR43C53.R43C54MR43C55MR43C56MR43C57R43C58

NO. 4WEDGE AREA

R43C59R43C60R43C61R44C52R44C53MR44C54

R45C51

R45C46R45C47MR45C48R45C49R45C50

R44C55MR44C56R44C57R44C58R45C53R45C54

NO. 2WEDGE AREA

R12C2R28C12R30C15R31C15R32C15R32C16R33C15

4. PreventativelyPlugged

R41C55R42C54R42C56

TOTALS 28

M Metallurgical Samples

R45C52 pulled April, 1978.

NRC MeetingMarch 23, 1982

Page 24: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

s I

GINNA STATION

B-STEAM GENERATOR

NO. 2 WEDGE AREA

Column 17 16 15 14 13 12 « ll.0 0

0 0I

0

0 0'I

0 0 ~ 0 0 0

33

32

31

30

0 0 0 0 0 '0 0

0 0 0 0 0 ~ 0

0 0 0 0 0 0 0

'29

28

27 ROW

Structurally Degraded (nc tubes)

Video OD Indication (no tubes)

Eddy Current Signal .(6 tubes)R12 C2 not„shown

Stay Bar

3/19/82

Page 25: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

S VPPOQT PL4TE

sanCoAEZEL.

Tuft"=5Hz'

Q ORIGINAL IN IT I AL,DATC

NUMIICR REVISION DRAWN~ Y

CHCCKCDSY

RCSP,CNG,

CNGMANG'R

ROCHESTER GAS 81 ELECTRIC CORP.IIOCHK5TER, 1CKW YCDtK

Page 26: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

RGE B POST TUBE REPAIR EVALUAT +

CONDITIONS:

- TUBE REMOVAL

— SURFACE IRREGULARI'TY WITHOUT COLLAPSE

- SEVERED TUBES AT FIRST TSP

HYDRAULICS CONSIDERATIONS:

- TUBE FATIGUE DUE TO FLUID INTERACTIONS

- FLUID-ELASTIC STABILITY

- VORTEX SHEDDING

- TURBULENCE

- LOCAL FLUID EFFECTS - EDDYS, CRACK

STABILITY

- FLOH VELOCITY AND EQUALITY CHANGES

STRUCTURAL CONSIDERATIONS:

- FATIGUE MARGIN UNDER OPERATING TRANSIENTS

— COLLAPSE INTEGRITY

- STABILITY QF TUBES SEVERED BELOW'SP

Page 27: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

~a 'L

y t 7i

.8'7W/D. aO .a5/N. rgy@MZL.~)g)Ewe ad%&)s]oPs = A'.vreacrrp = w~.

.I

a&.o

z~aW~Wr. ~~urnca&~ wMPv ~~raA

W~/D VZCM~

/Q 0

~ 6.o. 4.o

Page 28: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

I t

~ 4

~ ~'

Wzir~-Hzxra NOo&aAWY~waxTiaws~+~~fg/<g ~+7/D- O. Ol

II

II

ay~wc Mm sec rroN /5'7.. PrME XHEP-0 crpcvda/ ~8. TC3 waar0 go%. o YAK/ZEW

~iswE Y . ~a. z

Z.O

f'.6

'

r.z

.B

~

'S74f3C C

0 4.0 , a.o yZ o r6.o, zo.oc&s~ /MW YECczr7y-pm

Page 29: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

SUMMARY OF VORTEX SHEDDING AND TURBULENCE

ANALYSES

- FIXED-FIXED BOUNDARIES

- CROSS-FLOW VELOCITY, 10.0 FPS

- DAMPING RATIO, 0.01

CROSS SECTION OFDISTORTED ZONE VORTEX SHEDDING TURBULENCE

VIBRATION AMPLITUDES, MILS

CYLINDER (NOMINAL)

10% OVALITY

KIDNEY

FLAT

0.77

0.79

0. 79

2.13

0.81

0.83

0.83

1.53

VIBRATION AMPLITUDE DUE TO VORTEX SHEDDING AND CROSS-FLOW TURBULENCE

ARE RELATIVELY UNAFFECTED BY SMALL DISTORTIONS'ND SURFACE IRREGULARITY

Page 30: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

I I'I I' I

Page 31: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

IP

I 1

1 1

j . I I

I ' ~ I

~ I I l

> 1 l l 1>'l.l! I

) ~ ~ S

ll

l1

l I ~ t

I ~ ~

I I!I ~

~ 0

~ 1

I I

I Ir ~ e e

e ~ ~

e ~ ~

e a ~

'l \ 4 ~PHg/N/ OP.

V~ ~/~ "/I ~ ~ ~

1 ~ I r r ~ r 1'l

l r ~ e

f I r r. ~ 1

f C r r r r' 1

I w re

e

e 3

QR )/ SF/Fy.r ~

~ ~

~ ~ ~ e. I

V< >t~~<A

eee ~

Cd/gi

~ 0

~ ~~ ~

Page 32: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

/

J

~ ~

~mf&iMWWWIIÃN/

J t p

Page 33: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

EFFECT OF HOT LEG TUBE REMOVAL ON CROSS-FLOW VELOCITY

( 2-D MATHEMATICAL STUDY )

INPUT CROSS-FLOW VELOCITES: 6.0 ft/sec. hot leg5.4 ft/sec. cold leg

CASE

AVERAGE VELOCITY IN

TUBE REMOVAL REGION

MAX. GAP VELOCITY IN

FIRST TUBE ROM

DOWNSTREAM

NOMINAL

10 TUBES REMOVED

40 TUBES REMOVED

5. 30

3. 69

3. 86

19.40

13.50

14.14

TUBE REMOVAL DOES 'NOT,'ADVERSELY AFFECT FLOW VELOCITIES

Page 34: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

I

~ t ~

Page 35: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

FATIGUE EVALUATION OF SURFACE DAMAGED PLUGGED TUBE

(ASSUME FULL AXIAL RESTRAINT AT FIRST TSP)

I

Q. ENVELOPING TRANSIENT - PLANT LOADING/UNLOADING, 14,500 CYCLE!

0 ASSOCIATED LOADS

' TEMPERATURE VARIATIONS,

PRIM'ARY T: 547F (HOT STANDBY) TO 602F (1.00$ POWER)HOT

SECONDARY T : 547F (HOT STANDBY) TO 518F (100% POWER)ST'

o EXTERNAL PRESSURE RANGE: 795-1020 PSI .

o AXIAL TUBE LOAD RANGES

o TUBE-TO-SHELL THERMAL MISMATCH + 780 lbs.

ASSUMPTION.- TUBE IN CONTINUOUS THERMAL E(UILIBRIUM

WITH SECONDARY FLUID; STUB-BARREL WITH INFINITE

THERMAL INERTIA

o PLUGGED-TO-ACTIVE TUBE THERMAL MISMATCH: 0 TO + 1200 L

ASSUMPTION - SINGLE PLUGGED TUBE WITHI'N A CLUSTER OF

ACTIVE TUBES

6 AXIAL BENDING LOADS

~ AS-BUILT MISALIGNMENT, 0.25 INCH

o TS-TO-TSP THERMAL GROWTH MISMATCH, 0-05 INCH

o 'S ROTATION DUE TO PRIM-TO-SEC Ap, 0.08 INCH

Page 36: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

OFATIGUE USAGE CALCULATIONS

MAXIMUMSTRESS INTENSITY RANGE

SALT= 56.25 KSI

(ADJUSTED TO E. ~ 26 x 10 KSI FOR ASME FATIGUE CURVE)

ASSUMED STRESS CONCENTRATION FACTOR FOR

SURFACE DAMAGE = 4.0'(MAX. PER ASME)

NUMBER OF CYCLES n = 59,000 (THIS NUMBER RE-

PRESENTS ALL TRANSIENTS LUMPED CONSERVATIVELY)

MIHIMUM ACTUAL USABLE::CYCI,ES PER ASME CODE

H = 135,000

CALCULATED USAGE = n7N = 0.4303

~u8E G~oM&rRy

WRAPPER

FIRST; TUSE'V&'OR 7 PLRrE

Dura PER)P~EA'l P~usszu ruacho 87'S 0$ . A o a5o ~~a.~

srutiGRRREL

SAQo r.)SZ~~eSSZZ Sr Crim yi ruae

O835 G.X. XO.OZO" urSCL

7 UZESeBE7

Page 37: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

COLLAPSE INTEGRITY EYALUAT NS

BASED ON EXTENSIVE LABORATORY TESTING

COLLAPSE PRESSURE FOR NOMINAL TUBING 5000 PSI

COLLAPSE STRENGTH IS RELATIVELY UNAFFECTED BY SHORT

(a < TUBE DIAMETER), THROUGH-MALL TIGHT CRACKS

FOR TUBE COLLAPSE, DUE TO THE MAXIMUMhp- 1020 PSI

RE(UIRED WALL DEGRADATION IS 80'X,"IF UNIFORM, AND

> 90K IF LOCAL

TUBE COLLAPSE RESULTS FROM PLASTIC INSTABILITYAND REPRESENTS

AN INSTANTANEOUS FAILURE MODE. OF ALL THE IQADING CONDITIONS

FOR RGE TUBING, THE MAXIMUMap (- 1020 PSI) OCCURS DURING NORMAL

OPERATZON WHICH, THEREFORE, REPRESENTS A PROOF TEST.

Page 38: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

STABILITY OF TUBES SEVERED BELOW TSP

BROKEN HOT LEG OFTUBE GUIDED BYUPPER PLATES

'TUBE SEVERED JUSTBELOW THE FIRST PLATE

TSP THK = 0.75 INCH

51.88 INCH

TS

4 MAXIMUM TUBE BUNDLE STRETCH = 0.,12 IN. DURING FLB,

bp = 2560 psi

4 Prior-to-sec therma1 growth mismatch

FOR PULL OUT* THRU 0.75 INCH THI'CK PLATE, RE(UIRED ~T = 1900

EXPECTED >T <100F DURING OPERATION

(400F DUIRNG A LOCA

4 .TUBE PULL-OUT DUE TO TUBE SWING OR ROTATION AT U-BEND NOT

POSSIBLE SINCE BROKEN LEG OF THE TUBE IS GUIDED THRU UPPER

PLATES

REQUIRES PRIMARY SIDE DOWN TRANSIENT IF TUBES ARE AXIALLY

RESTRAINED AT THE PLATE, .SECONDARY SIDE DOWN TRANSIENT, IF FREE

Page 39: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

4

POST-REPAIR TUBE EVALUATION SUMMARY

-FLUID-ELASTIC STABILITY, VORTEX .SHEDDING ANDTURBULENCE RESPONCES OF A TUBE ARE PRACTICALLYUNAFFECTED BY SMALL DISTORTIONS AND SURFACEIRREGULARITIES.

-LOCAL FLUID FORCES ARE NEGLIGIBLY SMALL TOCAUSE CRACK PROPAGATION.

r

-REMOVAL OF TUBES HAS NO ADVERSE IMPACT ON TUBESTABILITY DUE TO FLUID INTERACTIONS.

-FOR SURFACE DAMAGED TUBES, ACCEPTABLE FATIGUEMARGIN EXISTS FOR SUBSEQUENT OPERATIONS

-PLANT':OPERATION BEING A PROOF COLLAPSE TEST,STRUCTURALLY STABLE TUBES ARE EXPECTED TO REMAINSTABLE DURING SUBSEQUENT OPERATIONS.

'-TUBES SEVERED AT THE FIRST "TSP ARE GEOMETRICALLYSTABLE AND CANNOT PULL OUT OF THE PLATE DUE TOOPERATING AND FAULTED TRANSIENTS.

Page 40: Slide presentation from 820323 meeting re steam generator ... · ginna station b-steam generator nrc meeting march 23, 1982 objectives o determine full extent of defects and loose

~ ~t 7 4

.+~. START B S/G

) .z-~ NUS MOCK-UP

MODI CATIONS — March 19, 1982

TEST — March 22, 1982

— NRC MEETNQ'- March 23, 1982

— REMOVAL OR DAMAGED TUBES IN P4 AND f6 WEDGE AREAS—March 31, 1982

— MECHANICAL PLUG REMOVAL — April 2, 1982

COMPLETE WORK IN LOWER SECTION OR "B" STEAM GENERATOR—April 5, 1982

— COMPLETE "B" S/G MODIRICATIONS — April 11, 1982

—RCP WORK COMPLETE — April 12, 1982

MATER 'LANCE "B" S/G — April 12, 1982

FINAL TV INSPECTION — April 13, 1982

SECONDARY HYDRO "B" S/G — April 10, 1982

CONTAINIKNT AIR TEST (ILRT) — April 15, 1982

FINAL S/G REPORT — April 16, 1982

— CREVICE CLEANING — April 20, 1982

NRC MEETING — Late April