36
Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 1 CMS Module Testing Issues From a CDF Testing Experience Perspective Anthony Affolder (for the UCSB module testing group)

Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 1

CMS Module Testing Issues

From a CDF Testing

Experience Perspective

Anthony Affolder

(for the UCSB module testing group)

Page 2: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 2

Talk Overview• Review current CMS testing procedures• Assorted observations from limited testing

experience on CMS components• UCSB module testing

Personnel, equipment, and infrastructure

Page 3: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 3

CMS Testing Overview• Review of current CMS testing procedures

Ensure understanding of testing prior to arrival at FNAL/UCSB– Reproduction of hybrid tests on arrival

Make sure any systematic failures in production techniques/materials found as early as possible

– M800 pre-production first chance to produce large quantities (>10) of single type of modules

– Need to be able to track time development of faults

• Answer open questions before large scale production Need of burn-in of module/optical systems components Finalization of production procedure Finalization of testing procedure

– Both fault finding and module qualification

Page 4: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 4

Tests Prior to Arrival at FNAL/UCSB(1)

• APV Chip Testing (1 minute) Voltage stressing

– 1.5 VDD (5 s)– 2.0 VDD (1 s)

Basic Functionality– MUX gain– Current Measurement

Pedestal – 50-90 ADC

Gain (Single Point)– G > 20 ADC– |GAVE-Gchan|<15 ADC

Pipeline– cell < 2 ADC– |P-Pcell|< 5 ADC

• FHIT-Industrial Tester (1 minute) Connectivity Basic Functionality

– MUX gain

– DCU calibration

– Current measurement Pedestal

– 20% Cut Noise

– ???% Cut Gain (Single Point)

– 20% Cut

Page 5: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 5

Tests Prior to Arrival at FNAL/UCSB(2)

• Strasburg ?????

• CERN-Pitch adaptor bonding (~20 minutes) Basic functionality Pedestal

– 20% Cut Noise

– 20% Cut Gain (Single Point)

– 20% Cut Capacitive pitch adaptor pulsing Thermal cycle to –20 C

– Repeat test Warm to room temperature

– Repeat test

Page 6: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 6

Testing Concerns• Hybrid tested ~1-20 minutes prior to arrival at FNAL/UCSB

Leads to concern about infant mortality problems of hybrid components CDF Hybrid Burn-in Experience

– 4 days with extensive tests at start/end

– ~9 out of 8000 chips failed (0.1% of chips)

– Same rate would lead to 2%(5%) rework of rods Different chips so can’t expect same rate

• Optical hybrids also will not be burnt-in CDF optical hybrid experience

– 3 day burn-in with tests at beginning and end

– ~10% failed during burn-in

– Additional 9 DOIM (out of 556) failed during data-taking

– CDF used custom laser diode system Lack of burn-in would have been catastrophic

Page 7: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 7

Testing Concerns (2)• Some components of hybrid characterization missing

Calibration circuit only tested at one injection point Pipeline pedestal/noise not tested adequately

– CDF calibrations remove bad cells from noise/pedestal calculation Suggest such test done prior to pitch adaptor bonding

• Testing requirements not consistent between sites Pedestal requirement change between test stands On-chip common mode subtraction “feature” makes noise

characteristics of open/saturated channels unpredictable Common-mode subtraction also different between stands

• Recent hybrid circuit modifications change LED pinhole tests results

Page 8: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 8

Common-mode Subtraction• Differing algorithms used to calculate common

mode pedestal for subtraction ARC

– 4 groups of 32 channels per chip– Use average as common mode for each section

DAQ– Strips (after subtracting the channel’s average pedestal) are

ordered with highest/lowest 10% truncated– Use average of remaining strip as common mode for chip

Final FED– Median channel value (after pedestal subtraction) is used as

common mode

• Use of same algorithms will yield more uniform testing/qualification results between stands

Page 9: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 9

Test System Grounding Issues

• PC, DAQ/ARC, LV supplies, and HV supply share common ground Leads to less than predictable test results

– See frequency related noise of prototype rod tests (D. Abbaneo)

• Suggest that a common mode noise standard is made With inverter off in peak mode (0.5 ADC)

– Removes on-chip common mode “feature”

Allows for more uniform testing results

Page 10: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 10

Lower Noise Requirements

Sensor-Sensor Open Visible

Improving grounding until common mode noise less than ~0.5 ADC in peak mode/ inverter off allows the use of raw noise as a powerful tool for finding opens, including the location

•Sensor-Sensor•Pitch Adaptor-Sensor•APV-Pitch Adaptor (???)

Seen by Charge Injection

Zoom in

Page 11: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 11

Pedestal Tests (Current)• Wafer Probing

Dynamic Range: 0-240 ADC Average Pedestal: 67.1

– 50 <P < 90 ADC Cut

• FHIT (Industrial Tester) Dynamic Range:0-240 ADC Average Pedestal:~90

– ±20% Cut:~72<P<108

• ARC Dynamic Range:0-240 ADC Average Pedestal:~110

– ±20% Cut:~88<P<132

• DAQ Dynamic Range:140-380 ADC Average Pedestal:~170

– ±20% Cut:~146<P<194-40 -30 -20 -10 0 10 20 30 40

DAQ

ARC

FHIT

WaferProbing

Pedestal Difference Cut (ADC)

Pedestal Requirement vary by as much as 70%

Page 12: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 12

Suggested Pedestal Tests• As FED subtracts average pedestals per channel, pedestal variation

only effects dynamic range of channel’s pre-amp or may indicate pathological problem Define pedestal requirements in similar manner as in wafer

probing– Define absolute pedestal requirements with a given width with different

mean for each test stand dependent

Page 13: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 13

Upper Noise Requirements

• High noise only affects signal efficiency (clustering)

• Use physics (radioactive sources/collision data) to determine cut value Expect values to be different

for different systems

• Wider Cut Values

SVX

Page 14: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 14

Gain Measurements

Extreme cases seen:

• Convolution of front-end w/ calibration circuit

• Single point gain does not tell full story

• Is there a physics based gain spec?

Zero point offset

Low gain

High gain

Gain=-28.3 ADC/MIP

Gain=-31.5 ADC/MIP

Page 15: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 15

Gain Measurements (2)

• Multi-point gain measurements have many advantages More stable More uniform between chips

– Tighter Cuts

Shows non-linearities – Zero MIP injection

Shows non-uniformities within chip

Calibration very sensitive to environment

Gain Scan (0.5-3.0 MIP)

(2 MIP injected)/2

TOB Module 83

TOB Hybrid

Page 16: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 16

• LED pinhole test characteristics will change with bias return line modification

Resistance on hybrid (22k,100)(2.2k,683)

R(22 k)

LED Pinhole Test

Page 17: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 17

Bias Ring Voltage

Voltage conversion assumes old resistor values in bias return circuit (22K,100

With new resistor values (2.2K, 681need ~120 A for regular pinholes need >300 A for “high current” pinholes

New Leakage Current (A) Necessary With New Resistor Values

LED Pinhole Tests

May cause damage to sensors!!!

(Torsten Franke)

Page 18: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 18

Noise Chip Edge Wings

Increase in noise at chip edges But only in a few pipeline cells pipeline scan=latency scan

In-time interference effect!! Fairly easy to reduce/avoid

Page 19: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 19

Deadtimeless Scan (ISL)• Issue two triggers with varying

time separation Measure pedestal and noise at

each unit of trigger separation

• With ISL, every command, chip change of state, and data readout caused pedestal shifts Would guess similar effect

causing wing

• Removed with DPS at CDF

(Time Between Triggers)

Page 20: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 20

Suggestions for Improved Test model

• Add hybrid qualification prior to pitch adaptor bonding Thorough understanding of hybrids by adding more pipeline and gain

measurements

• Make requirements/calculation algorithms consistent through testing process Wafer Probing FHITStrasburg Pitch Adaptor Bonding Module

Construction Rod Construction/burn-in– Allows for the reproduction of bad channel lists

– Eases tracking of fault creation

• Motivate requirements for fault finding and on silicon tracker performance Noise Occupancy Signal Efficiency Signal Resolution

Page 21: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 21

Test model(2)• Improve system’s noise performance in order to use the noise as

powerful tool Identification of location of opens w/o LED test

• Modify deep tests Suggest different bad channel cuts specific to component type tested Remove all percentage requirements (relative to average) Replace with fixed requirements

• Use cooling box as module burn-in until shown unnecessary Reduces reworking during rod assembly Adds important information about necessity of LED tests for the finding of

some pinholes and opens locations Demonstrates if hybrid burn-in necessary

Page 22: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 22

CDF Module Burn-in Experience

• Significant number of pinholes created during burn-in (even after 5 hours running) L1- 0.166% of strips L3- 0.052% of strips L4- 0.033% of strips ISL-0.0071% of strips

• 7 additional pinholes created during data-taken L7 burnt-in at depletion voltage

– All other burnt in with 50% over-voltage

• Early module burn-in in CMS will indicate pinhole creation rate and its effect on rod rework rate

Page 23: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 23

Possible Rod Burn-in Issues • LED systems seem necessary for discovery of

“high current” pinholes and location of opens In current rod burn-in plan, no LED systems available Necessitates new techniques to locate “high current”

pinholes and opens– New sensor qualification tests, backplane pulsing, lower

common mode noise, etc.

• Initial module burn-in will determine if this is an issue

Page 24: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 24

CLEO pinholes• CLEO Sensor Testing

(C. Campagnari) Bias applied across coupling capacitor

with no bias between p+ and n+ implants

Asymmetric response to bias by pinholes (like a diode)

• Appears similar to “high current” pinholes “High current” pinholed channels

shown act saturated only after bias polarity changes across coupling capacitor

Bias Voltage (Volts)

Bias Voltage (Volts)

Leakage Current(Amps)

Leakage Current(Amps)

Page 25: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 25

Testing Conclusions• Slight modification of testing program would lead to more uniform

and consistent fault finding between different sites/systems Reduce rework performed on completed rods

• Location of opens could be identified by combination of noise and internal calibration measurements Useful for rod burn-in fault finding

• Modification of HV return circuit necessitates increase of LED intensity in pinhole search “High current” pinholes may be able to be found with modification of sensor

qualification

• Increase in noise at chip edges likely due to in-time interference effects We would be willing to study this more thoroughly

• We are willing to help in defining testing plan/devising tests

Page 26: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 26

UCSB Short-term Testing Plan

• Characterize hybrid (+PA) on arrival Basic functionality, gain scan, and deep test (ARC)

• Re-characterize module on completion of construction Basic functionality, gain scan, deep test, and IV curves

(ARC)

• Cold box test fraction of modules (DAQ) Acts as ~24 hour module burn-in

– Identifies mechanical/bond/electrical weaknesses prior to production of large number of modules

– Reduces reworking of rod/retrofitting of modules

• Rod construction/characterization/burn-in (when parts and test setups available)

Page 27: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 27

Testing personnel at UCSB• Professors

Joe Incandela Claudio Campagnari David Stuart

• Post-docs Anthony Affolder Patrick Gartung (UC-Riverside)

• Graduate Students Steve Levy Shawn Stromburg +1-2 starting this summer

• Electrical Engineering Support Sam Burke

• ESE Master Student Anuroop Gupta

(Database/programming)

• + Assorted Undergraduates and Techs (during full production)

Page 28: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 28

Current UCSB Testing Setup

• Clamshell(UCSB) Plastic stand-offs

– 2 Locating Pins

Kapton Extension Cables(UCSB)

– Easy connection/disconnection

Solid mounting of DAQ equipment

• 1 ARC Controller + 1 ARC FE• LV & HV Power Supplies• Dry Air• Clamshell

Page 29: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 29

Testing Facilities

• High Bay (Ground floor) Rod assembly/burn-in Convenient access to loading

dock

• Clean Room (5th floor Physics) Adjacent to production area Module tests

– Fault finding and deep tests Module burn-in station Visual inspection table

Page 30: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 30

Safety Protocols• LV

OVP,OCP

• HV Crowbar Protection

• Electrostatic Protection Ground mats on tables and

floors Heel straps Combo tester at clean room

entrance Touch tester at each station

(Artist Rendition)

Page 31: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 31

Test System Grounding Issues (2)Module Testing Final PS System

PC

LV -5V

-5V

ARC Controller

HV+HV

Sensor

Hybrid

ARC FE

2.5V

1.25

V

GROUND LOOPS!!!

GROUND LOOPS!!!

LV

HV+HV

Sensor

Hybrid

HVGND

GND+1.25V+2.5V

DOH

AOH

Command And Data CableOptical Cables

Patc

h Pa

nel/

Inte

rcon

nect

Bus

Page 32: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 32

Hybrid Gain Measurement(1)

• Hybrid Tests on steel plate Large pickup effects cause large 2 when 0 MIP point included 2 fairly good when excluding zero

– Noise of calibration circuit not yet included

0-3 MIPs 0.5-3 MIPs

Page 33: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 33

Hybrid Gain Measurement(2)

• Hybrid Tests in ESD box Pickup effects greatly reduced Large variation gain (±5%) variation in third chip

• Calibration tests have strong dependence on environment/grounding!!!!

0-3 MIPs 0.5-3 MIPs

Page 34: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 34

Other Suggestions• Central Repository of Schematics

Electrical and mechanical schematic of all components used in the manufacturing and testing of all silicon tracker components

All in a standard format (pdf ??) readable by a standard viewer (abode acrobat version x.y ??)

– UCSB willing to start such a repository

• List of all components with responsible people indicated With e-mail and web page information

• Central Repository of Production Checklist Enables fast determination of procedures done previous to arrival

to given site

Page 35: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 35

Example of DAQ/ARC Differences

Page 36: Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective

Module Testing Meeting Jan. 29, 2002 CMS Module Testing Issues-Anthony Affolder Slide 36

On-chip common mode subtraction

• Inverters share common point Current flows between channels

• Regular channel noise: 2raw

2-cm2

• Opens/saturated channel noise: 2raw

2+cm2

• Depending on cm, open channel have higher/lower noise