Upload
sydney-farmer
View
218
Download
1
Embed Size (px)
Citation preview
Slide 1
Marcel DemarteauBrenna Flaugher
Proposal for project space Proposal for project space utilization at Sidet utilization at Sidet
Slide 2
Projects at SiDet and their RequestsProjects at SiDet and their Requests
There are currently 6 silicon projects planned at SiDet: BTeV pixels, BTeV strips, CMS pixels, CMS strips, DØ-2b, CDF-2b
Each project presented their request at a liaison meeting. Presentations can be found at http://sidet.fnal.gov/liaison/
Based on those requests, a possible use of the Lab space for the various projects is presented in the following slides.
Office space for the projects is also addressed
Slide 3
Lab DLab D
Boundary conditions: Accommodate CMS, CDF and DØ 2b production Minimal perturbation with regard to CMM equipment Projects needs not far developed yet
Proposal CMS strip production takes place in current wirebonding area DØ 2b production takes place in North area
» Can retain all CMM’s in that area for the time being CDF production takes place on East wall
» Can retain all CMM’s in that area too for the time being Wirebonding relocated to semi-cleanroom
Disposition of CMM’s can be deferred to a later date when 2b plans of groups are firmed up
Slide 5
Lab D Wirebonding Proposed LayoutLab D Wirebonding Proposed Layout
Wirebonding room more centrally located
Pass-through boxes to burn-in room, corridor (new repair location), lab D production areas
Infrastructure modifications SiDet will refurbish ceiling SiDet will add
humidification control
SiDet will add card reader access
Retain one probestation in semi cleanroom
Slide 6
Lab D Semi CleanroomLab D Semi Cleanroom
If proposal accepted to move wirebonding into semi-cleanroom, will need to move equipment
CDF» Probestations» Logs, sensors
DØ Equipment» Two laser stands» One probestation
CDF will have to find a new location for all CDF equipment
One DØ laser stand can move to the double trailer
Move all probestations to Lab A
Slide 7
Bubble and Double TrailerBubble and Double Trailer
Concentrate all repair stations in bubble (no repair work in burn-in space anymore)
CMS pixel work will relocate to the double trailer
DØ Laser stand can move to double trailer
Repair S
tatio
ns
CMS Pixels
DØ Laser Stand
Slide 8
Burn-in SpaceBurn-in Space
Available space is ~1200 square feet (no more repair stations) Allocation:
CDF retains 500 square feet DØ retains 200 square feet with the understanding that they have priority
and first choice once the AB-Bridge is completed CMS is allocated 500 square feet with possibility to expand later if
necessary
CDF CMS
DØ
Slide 9
Cross ConnectCross Connect
Each project gets one “window” office and one cubicle in the re-arranged office area
Facility will provide one direct phone line and four ethernet lines per cubicle
3 more offices
Slide 10
Lab C CleanroomLab C Cleanroom
CDF has agreed to move out of Lab C North section completely DØ wishes to retain at least 10% test area
Use of Lab C areas is at the discretion of the facility until the 2b plans of both collider experiments are firmed up. DØ can retain 10% test area
Slide 11
Lab C SouthLab C South
DØ wishes to retain the 10% test area
If a 3m CMM is required for 2b assembly, a Zeiss machine will have to be removed.
Slide 12
Lab C NorthLab C North
CDF has agreed to move cooling stand to burn-in stand and vacate north clean room
CDF is considering another 1.5m B&S machine to replace one G&L dcc machine