21
Slide # 1 GEO Task AR-07-02 Architecture Implementation Pilot George Percivall [email protected] GEO ADC Meeting, 14 & 15 May 2007

Slide # 1 GEO Task AR-07-02 Architecture Implementation Pilot George Percivall [email protected] GEO ADC Meeting, 14 & 15 May 2007

Embed Size (px)

Citation preview

Slide # 1

GEO Task AR-07-02Architecture Implementation Pilot

George [email protected]

GEO ADC Meeting,14 & 15 May 2007

Slide # 2

GEO Task AR-07-02Architecture Implementation Pilot

• Task Description

• Call For Participation (CFP)

• Kickoff Meeting Plans

Slide # 3

GEO Task AR-07-02Architecture Implementation Pilot

• Lead incorporation of contributed components consistent with the GEOSS Architecture…

• …using a GEOSS Web Portal and a GEOSS Clearinghouse search facility

• …to access services through GEOSS Interoperability Arrangements

• …in support of GEOSS Societal Benefit Areas

Title from AR-07-02 task sheet

Slide # 4

GEOSS Architecture Implementation Pilot

• “Pilot” - implementation of interoperability arrangements in a persistent environment

• Develop recommendations for GEOSS Web Portal and Clearinghouse

• Demonstration in advance of the EO Summit – Portals, Clearinghouse/catalogues and Services – Scenario supporting one or more GEOSS SBAs.

• Utilize OGC Procedures for conducting a pilot• Schedule: Initiation in 1st quarter 2007, 6 month

development

Slide # 5

Pilot Approach

*RFQ/CFP = Request for Quotation/Call for Participation*RFQ/CFP = Request for Quotation/Call for Participation

ExecutionExecution

Task DTask D

Kick-offKick-offPreparationPreparation

Task CTask C

RFQ/CFP*RFQ/CFP*DevelopmentDevelopment

Task BTask B

ConceptConceptDevelopmentDevelopment

Task ATask A

DeployDeploy

Task ETask E

OGC Pilot Policy and ProcedureOGC Pilot Policy and Procedurehttp://www.opengeospatial.org/ogc/policies/ippp

Slide # 6

GEO AR-07-02

Coordination of ActivitiesFEDEO Pilot

Tri-Lateral Pilot GEO Tasks?

Architecture and Standards for Earth

Observation

Slide # 7

AI Pilot Milestones

• CFP Release 13 April• CFP Responses due 11 May• Pilot Kickoff meeting 5-6 June, ESRIN• Deploy, Integrate, Test June to Sept.• Demo Capture September 2007• Initial Operating Capability After September • Plenary & Summit November 2007

http://www.earthobservations.org/docs/CFP_GEOSS_AR-07-02_11.4.2007.pdf

Slide # 8

GEO Task AR-07-02Architecture Implementation Pilot

• Task Description

• Call For Participation (CFP)

• Kickoff Meeting Plans

Slide # 9

CFP seeks collaborative participation in 3 areas

• Contribute existing services, e.g, portals, catalogs and other services – both services hosted by participants and/or

solutions to be hosted by other organizations

• Develop societal benefit scenarios to guide development and demonstration of pilot services.

• Refine architecture; potential GEOSS Interoperability Arrangements

Call for Participation : http://portal.opengeospatial.org/files/?artifact_id=20953

Slide # 10

CFP Responses 24 Responses Received as of 12 May 2007

• Argon/IM• BKG• Compusult• Cranfield• EC/JRC• ESA et.al. FedEO• ESA/FAO Portal• ESONET, et.al.• ESRI• FGDC• GBIF et.al.• GEOmon• GMU• JPL• Meraka et.al.• MinesParis

• NASA• NOAA/NGDC DMSP• NOAA/NGDC Hazards• OSIRIS et.al.• Public Warning• STFC et.al• Ukraine• Unidata• UT/JAXA

• Anticipated responses:– INCOSE

– GeoConnections

– SERVIR

– Species 2000

– US State Dept

Slide # 11

CFP Architecture

• Developed from RFI and Responses

• RM-ODP Viewpoints for architecture– Enterprise: purpose, scope, and scenarios– Information: features, coordinates, semantics– Computational: service oriented architecture

• Identifies candidate interoperability arrangements

– Engineering: component types– Technology: component instances

ISO/IEC 10746: IT-Open Distributed Processing - Reference Model (RM-ODP)

Slide # 12

Engineering Viewpoint Architecture

Slide # 13

GEO Web Portal Requirements

• Graphical design of Human-Computer Interface shall use GEOSS branding

• Link to GEO Secretariat web pages• Catalog client to GEOSS Clearinghouse • TBD hits per/hour with <TBD% degradation of

performance vs. no-load performance. • Availability >99%, i.e., ~ 7 hours of down time a month• Shall be hosted on a computer hosted at TBD. • Hosted on a computer at TBD • Maintenance performed by TBD org.

Slide # 14

GEOSS Clearinghouse Requirements - Draft

• Catalog service for GEO Portal

• Catalog client interfaces– ISO 23950– OGC Catalog Services for the Web (CSW) –

• Registry for GEOSS Community Catalog Service metadata

• Registration of items in the Clearinghouse

• Interface registries hosted at GEO Secretariat.

• Graphical design of Human-Computer Interface shall use GEOSS branding

• Provide a catalog service interface: TBD hits/day

• Availability >99%, i.e., ~ 7 hours of down time a month

• Future:– Hosted at GEO Secretariat. – Maintenance of content by the GEO Secretariat. – Maintenance of software by the contributing organization.

Slide # 15

AI Pilot CFP - SBA Scenarios

• Disaster: Wildfires

• Disaster: Tanker oil spill

• Climate Change: Local effects

• Ecosystems and biodiversity: Africa

• Ecosystems and biodiversity: Polar (IPY)

• Coordination with IP3 Scenarios

Seeking users or user-representatives to participate in development and deployment of scenarios in Pilot

Slide # 16

Keeping the CFP open

• Responses to the CFP were due 11 May

• 11 May was firm close date for – GEO Web Portal– GEOSS Clearinghouse

• Responses for IOC due before Kickoff

• Open call for particiation beyond IOC– GEOSS Component Registration Process– Continue to seek additional participants

Slide # 17

AR-07-02: Output & Deliverables

• Persistent capability– GEOSS Webportal – GEOSS Clearinghouse/Catalogues– Services to meet SBA scenarios

• GEOSS Architecture Implementation Pilot Report

Slide # 18

Pilot Kickoff Meeting5 - 6 June 2007

ESA-ESRINFrascati (Rome), Italy

Registration and information

http://www.congrex.nl/07m22/

Slide # 19

Pilot Kickoff Objectives

• Begin the Execution Phase of the Pilot

• Refine and develop – Collaboration and interoperability goals– Detailed design based on CFP Architecture. – User scenarios suitable for demonstration.

• Develop detailed plan and schedule for the Execution Phase

Slide # 20

Pilot Kickoff Agenda - DraftJune 5th

09.00 Plenary 1: Introductions, pilot structure & agenda consensus

11.00 Parallel Sessions

13:40 Lunch at ESRIN Cafeteria

14.30 Parallel Sessions

18.30 Adjourn for the day

June 6th09.00 Plenary Session #2 - Day 1 Summary

09.45 Parallel Sessions

13:40 Lunch at ESRIN Cafeteria

14.30 Parallel Sessions

18.00 Plenary Session #3 - Day 2 Summary, planning recap

19.30 Adjourn for the day

Slide # 21

GEO Task AR-07-02Architecture Implementation Pilot

• Task Description

• Call For Participation (CFP)

• Kickoff Meeting Plans

George [email protected]

GEO ADC Meeting,14 & 15 May 2007