Upload
rodney-malone
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Slide # 1
GEO Task AR-07-02Architecture Implementation Pilot
George [email protected]
GEO ADC Meeting,14 & 15 May 2007
Slide # 2
GEO Task AR-07-02Architecture Implementation Pilot
• Task Description
• Call For Participation (CFP)
• Kickoff Meeting Plans
Slide # 3
GEO Task AR-07-02Architecture Implementation Pilot
• Lead incorporation of contributed components consistent with the GEOSS Architecture…
• …using a GEOSS Web Portal and a GEOSS Clearinghouse search facility
• …to access services through GEOSS Interoperability Arrangements
• …in support of GEOSS Societal Benefit Areas
Title from AR-07-02 task sheet
Slide # 4
GEOSS Architecture Implementation Pilot
• “Pilot” - implementation of interoperability arrangements in a persistent environment
• Develop recommendations for GEOSS Web Portal and Clearinghouse
• Demonstration in advance of the EO Summit – Portals, Clearinghouse/catalogues and Services – Scenario supporting one or more GEOSS SBAs.
• Utilize OGC Procedures for conducting a pilot• Schedule: Initiation in 1st quarter 2007, 6 month
development
Slide # 5
Pilot Approach
*RFQ/CFP = Request for Quotation/Call for Participation*RFQ/CFP = Request for Quotation/Call for Participation
ExecutionExecution
Task DTask D
Kick-offKick-offPreparationPreparation
Task CTask C
RFQ/CFP*RFQ/CFP*DevelopmentDevelopment
Task BTask B
ConceptConceptDevelopmentDevelopment
Task ATask A
DeployDeploy
Task ETask E
OGC Pilot Policy and ProcedureOGC Pilot Policy and Procedurehttp://www.opengeospatial.org/ogc/policies/ippp
Slide # 6
GEO AR-07-02
Coordination of ActivitiesFEDEO Pilot
Tri-Lateral Pilot GEO Tasks?
Architecture and Standards for Earth
Observation
Slide # 7
AI Pilot Milestones
• CFP Release 13 April• CFP Responses due 11 May• Pilot Kickoff meeting 5-6 June, ESRIN• Deploy, Integrate, Test June to Sept.• Demo Capture September 2007• Initial Operating Capability After September • Plenary & Summit November 2007
http://www.earthobservations.org/docs/CFP_GEOSS_AR-07-02_11.4.2007.pdf
Slide # 8
GEO Task AR-07-02Architecture Implementation Pilot
• Task Description
• Call For Participation (CFP)
• Kickoff Meeting Plans
Slide # 9
CFP seeks collaborative participation in 3 areas
• Contribute existing services, e.g, portals, catalogs and other services – both services hosted by participants and/or
solutions to be hosted by other organizations
• Develop societal benefit scenarios to guide development and demonstration of pilot services.
• Refine architecture; potential GEOSS Interoperability Arrangements
Call for Participation : http://portal.opengeospatial.org/files/?artifact_id=20953
Slide # 10
CFP Responses 24 Responses Received as of 12 May 2007
• Argon/IM• BKG• Compusult• Cranfield• EC/JRC• ESA et.al. FedEO• ESA/FAO Portal• ESONET, et.al.• ESRI• FGDC• GBIF et.al.• GEOmon• GMU• JPL• Meraka et.al.• MinesParis
• NASA• NOAA/NGDC DMSP• NOAA/NGDC Hazards• OSIRIS et.al.• Public Warning• STFC et.al• Ukraine• Unidata• UT/JAXA
• Anticipated responses:– INCOSE
– GeoConnections
– SERVIR
– Species 2000
– US State Dept
Slide # 11
CFP Architecture
• Developed from RFI and Responses
• RM-ODP Viewpoints for architecture– Enterprise: purpose, scope, and scenarios– Information: features, coordinates, semantics– Computational: service oriented architecture
• Identifies candidate interoperability arrangements
– Engineering: component types– Technology: component instances
ISO/IEC 10746: IT-Open Distributed Processing - Reference Model (RM-ODP)
Slide # 13
GEO Web Portal Requirements
• Graphical design of Human-Computer Interface shall use GEOSS branding
• Link to GEO Secretariat web pages• Catalog client to GEOSS Clearinghouse • TBD hits per/hour with <TBD% degradation of
performance vs. no-load performance. • Availability >99%, i.e., ~ 7 hours of down time a month• Shall be hosted on a computer hosted at TBD. • Hosted on a computer at TBD • Maintenance performed by TBD org.
Slide # 14
GEOSS Clearinghouse Requirements - Draft
• Catalog service for GEO Portal
• Catalog client interfaces– ISO 23950– OGC Catalog Services for the Web (CSW) –
• Registry for GEOSS Community Catalog Service metadata
• Registration of items in the Clearinghouse
• Interface registries hosted at GEO Secretariat.
• Graphical design of Human-Computer Interface shall use GEOSS branding
• Provide a catalog service interface: TBD hits/day
• Availability >99%, i.e., ~ 7 hours of down time a month
• Future:– Hosted at GEO Secretariat. – Maintenance of content by the GEO Secretariat. – Maintenance of software by the contributing organization.
Slide # 15
AI Pilot CFP - SBA Scenarios
• Disaster: Wildfires
• Disaster: Tanker oil spill
• Climate Change: Local effects
• Ecosystems and biodiversity: Africa
• Ecosystems and biodiversity: Polar (IPY)
• Coordination with IP3 Scenarios
Seeking users or user-representatives to participate in development and deployment of scenarios in Pilot
Slide # 16
Keeping the CFP open
• Responses to the CFP were due 11 May
• 11 May was firm close date for – GEO Web Portal– GEOSS Clearinghouse
• Responses for IOC due before Kickoff
• Open call for particiation beyond IOC– GEOSS Component Registration Process– Continue to seek additional participants
Slide # 17
AR-07-02: Output & Deliverables
• Persistent capability– GEOSS Webportal – GEOSS Clearinghouse/Catalogues– Services to meet SBA scenarios
• GEOSS Architecture Implementation Pilot Report
Slide # 18
Pilot Kickoff Meeting5 - 6 June 2007
ESA-ESRINFrascati (Rome), Italy
Registration and information
http://www.congrex.nl/07m22/
Slide # 19
Pilot Kickoff Objectives
• Begin the Execution Phase of the Pilot
• Refine and develop – Collaboration and interoperability goals– Detailed design based on CFP Architecture. – User scenarios suitable for demonstration.
• Develop detailed plan and schedule for the Execution Phase
Slide # 20
Pilot Kickoff Agenda - DraftJune 5th
09.00 Plenary 1: Introductions, pilot structure & agenda consensus
11.00 Parallel Sessions
13:40 Lunch at ESRIN Cafeteria
14.30 Parallel Sessions
18.30 Adjourn for the day
June 6th09.00 Plenary Session #2 - Day 1 Summary
09.45 Parallel Sessions
13:40 Lunch at ESRIN Cafeteria
14.30 Parallel Sessions
18.00 Plenary Session #3 - Day 2 Summary, planning recap
19.30 Adjourn for the day
Slide # 21
GEO Task AR-07-02Architecture Implementation Pilot
• Task Description
• Call For Participation (CFP)
• Kickoff Meeting Plans
George [email protected]
GEO ADC Meeting,14 & 15 May 2007