32
Skangass - Risavika Havn LNG bunkering system Gerko Brouwer, Project Manager Skangass Arjan van Ginkel, Regional Sales Manager

Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Embed Size (px)

Citation preview

Page 1: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Skangass - Risavika Havn LNG bunkering system Gerko Brouwer, Project Manager Skangass

Arjan van Ginkel, Regional Sales Manager

Page 2: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 2

Agenda

Introduction

Fiscal Metering

Situation at Risavika Havn

Challenges & Solutions

Page 3: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 3

Agenda

Introduction

Fiscal Metering

Situation at Risavika Havn

Challenges & Solutions

Page 4: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 4

Introduction Cryonorm Systems BV

Page 5: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 5

Work field Cryonorm Systems

Page 6: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 6

Page 7: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 7

Agenda

Introduction

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

Page 8: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 8

1. MID - General

European CE Directive (2004/22/EC), published in the Official Journal of European Communities on 30 April 2004 (nr. L135)

Effective per 30 Oct 2006 with a transition period up till 30 Oct 2016 for the “unchanged” instrument (amendment to national approval not possible !!)

Page 9: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 9

MID - Countries

Other European

countries have also

adopted MID such

as Norway,

Switzerland and

Iceland

Page 10: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 10

What is OIML and MID?

A set of Measuring System requirements to guarantee:

You get what you are paying for and you can prove it

You deliver what you are being paid for and you can prove it

OIML is global standard and MID is European Directive.

NMi and Emerson cooperated (with system-owners) to achieve fulfillment of MID (and OIML) for Legal applications.

MID OIML

Page 11: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 11

10 different types of measuring instruments (10 MI-Annexes)

We will only handle gas

(MI-002) and liquid metering

(MI-005)

1. MID - General

Page 12: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 12

EC Type Examination Certificate

System Certificate

Page 13: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 13

EC Type Examination Certificate

System Certificate

• Can be seen as a theoretical plan of the measuring

solution.

– Think of it as an approved blue print or P&ID which is required when you build a house or installation.

• Before building the measuring solution, the owner must contact a Notified Body to approve this plan on paper.

– Then the owner is approved to build the measurement solution according to the approved Type Examination.

Page 14: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 14

EC Type Examination Certificate

System Certificate

Page 15: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 15

EC Type Examination Certificate

T10598

Page 16: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 16

Responsibilities

1

6

MID Certification Process

MID Approval

Subsequent Verification

Emerson / NMi Local Notified Body

Page 17: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 17

Agenda

Introduction

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

Page 18: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 18

Situation at Risavika Havn

Page 19: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 19

Agenda

Introduction

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

Page 20: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 20

Agenda

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

– MID

• MMQ

• Installation Integrity

• Initial verification

– Subsequent Verification

Page 21: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 21

MMQ

Challenges

– Large distance between flow meter and transfer point

– Draining of loading arm

– Thermal expansion between 2 batches

- Varying batch quantities

Case Holding

mode

unrounded

MMQ

MMQ

2 days holding 48 hours 21395 kg 50 tons

for lower MMQ 43 hours 19855 kg 20 tons

max. holding time 127 hours 45729 kg 50 tons

Page 22: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 22

MMQ

Solution

– Fixed compensation for loading arm capacitance

– Relieved quantity is measured by a dedicated gas meter and compensated.

Vapor Return

Min. Flow

Line

5 bar

Tie-in

main line

M

Page 23: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 23

Agenda

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

– MID

• MMQ

• Installation Integrity

• Initial verification

– Subsequent Verification

Page 24: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 24

Installation Integrity

Challenges

– Safety!

– Gas metering between batches

– Purging of loading arm

Page 25: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 25

Installation Integrity

Solution

– Interlocks between valves and batch control

– Sealing of maintenance valves

– NMi procedure CPC-PR-01

Page 26: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 26

Agenda

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

– MID

• MMQ

• Installation Integrity

• Initial verification

– Subsequent Verification

Page 27: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 27

Initial Verification

Solution

– Transferibility of Ede water calibration to field

• No need for field calibration

• Dedicated cryogenic procedure FL-NI-359 - Emerson Cryo Zeroing Procedure

NMi Declaration from project 603876

Page 28: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 28

Agenda

Fiscal Metering / MID

Situation at Risavika Havn

Challenges & Solutions

– MID

• MMQ

• Installation Integrity

• Initial verification

– Subsequent Verification

Page 29: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 29

Subsequent Verification

Challenges

– Local regulations

– Continuïty in operations

– Recalibration costs

– Installation, insulation

Page 30: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 30

Subsequent Verification

Solution, as agreed by local, Norwegian Weights and Measures authority (Justervesenet)

– Master meter (4” Micro motion CMF400 meter) in series - Master meter calibrated on water - Uncertainty analysis, on basis of GUM (Guide to the expression of Uncertainty in Measurement), proves that meter is within 0.4% at LNG, based on water cal - Field data in Norway on a Micro Motion 2” meter against a scale shows to be within 0.2%, based on water calibration

Page 31: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 31

Subsequent Verification

Solution, as agreed by local, Norwegian Weights and Measures authority (Justervesenet)

– Master meter (continued) - Uncertainty analysis to be approved by Justervesenet - Re-calibration on water once every three years

– Duty meters checked against master meter

• Verification of stability over time, once per year

Page 32: Skangass - Risavika Havn LNG bunkering systemlng.justervesenet.no/wp-content/uploads/2015/04/MID-appro-mass... · Skangass - Risavika Havn LNG bunkering system ... Fiscal Metering

Company Confidential

November 7, 2013

Slide 32

Subsequent Verification

Solution with master meter