25
DESCRIPTION Davco SK Fastorch is a prefabricated roofing membrane manufactured under the most stringent quality control specifications, for the protection, repair and restoration of all types of roofs, gutters and structures. SANDED OR MINERAL SURFACE The top layer which is exposed to the sun is treated with fine sand for the sanded-finish and with small coloured granules for the mineral-finish. These sand or granules are factory applied during production, thus assuring minimal loss throughout the life of the roof. The treated surface offers: • Excellent protection from U.V. • Available in green, black, brown, buff, red and tan coloured granules. • Eliminates need for coating or covering the top with concrete/ tiles, thus reducing roof load and extra expense. MODIFIED ASPHALT The asphalt is mixed with highly compatible modifiers to provide the membrane with better aging characteristics, and higher resistance to cold and hot temperatures. Davco SK Fastorch is flexible. When compared to regular asphalt, one can readily realize the benefits of the membrane. POLYESTER CORE The core of Davco SK Fastorch is reinforced with a non woven polyester mat which stretches up to 30%. Similar glass felts offer a maximum of 2% elasticity. This feature allows the membrane to accommodate thermal shocks and excessive roof movements. BURN OFF FILM A thin burn off film is factory applied during production. This film acts as heat gauging device. The applicator can watch the heat reaction of the film and therefore visually gauge the application temperature. TECHNICAL DATA Reinforcement 180 g/m 2 (Nonwoven Polyester) Softening Point 143°C ASTM D 36 - 76 Heat Stability 120°C UNI 8202 / 18 Cold Flexibility -5°C UNI 8202 / 15 Water Absorption <1% ASTM D 570 : 88 Water Vapour Transmission 0.59 g/m 2 /24hr ASTM E 96/E 96M : 05 Tensile Strength 5 N/mm 2 ASTM D 412 : 2006ae 2 Elongation at break 40% ASTM D 412 : 2006ae 2 Tear Resistance 150N ASTM D 624:00 (2012) Dimension Stability 70°C ± 2°C for 6 hours SS 374 : 1994 Avg Linear Change in Length + 0.01 Avg Linear Change in Width + 0.02 Modified Asphalt APP Surface Finish Sanded or Mineral Thickness of Sanded Surface 3mm , 4mm Weight of Mineral Surface 4.5 kg / m 2 Roll size 1m width x 10m length Colours available for Green Mineral Surface Grey, Red, Black (on indent basis) Specifications are subject to change without notification. Results shown are typical but reflect test procedures used. Actual field performance will depend on installation methods and site conditions. SK FASTORCH POLYESTER REINFORCED WATERPROOFING MEMBRANE ECO FRIENDLY HIGH STRENGTH PREFORMED MEMBRANE

SK FASTORCH - Davco online

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SK FASTORCH - Davco online

DESCRIPTIONDavco SK Fastorch is a prefabricated roofing membrane manufactured under the most stringent quality control specifications, for the protection, repair and restoration of all types of roofs, gutters and structures.

SANDED OR MINERAL SURFACEThe top layer which is exposed to the sun is treated with fine sand for the sanded-finish and with small coloured granules for the mineral-finish. These sand or granules are factory applied during production, thus assuring minimal loss throughout the life of the roof. The treated surface offers:• Excellent protection from U.V.• Available in green, black, brown, buff, red and tan coloured granules.• Eliminates need for coating or covering the top with concrete/ tiles, thus reducing roof load and extra expense.

MODIFIED ASPHALTThe asphalt is mixed with highly compatible modifiers to provide the membrane with better aging characteristics, and higher resistance to cold and hot temperatures. Davco SK Fastorch is flexible. When compared to regular asphalt, one can readily realize the benefits of the membrane.

POLYESTER COREThe core of Davco SK Fastorch is reinforced with a non woven polyester mat which stretches up to 30%. Similar glass felts offer a maximum of 2% elasticity. This feature allows the membrane to accommodate thermal shocks and excessive roof movements.

BURN OFF FILMA thin burn off film is factory applied during production. This film acts as heat gauging device. The applicator can watch the heat reaction of the film and therefore visually gauge the application temperature.

TECHNICAL DATAReinforcement 180 g/m2 (Nonwoven Polyester)

Softening Point 143°C ASTM D 36 - 76

Heat Stability 120°C UNI 8202 / 18

Cold Flexibility -5°C UNI 8202 / 15

Water Absorption <1% ASTM D 570 : 88

Water Vapour Transmission 0.59 g/m2/24hr ASTM E 96/E 96M : 05

Tensile Strength 5 N/mm2 ASTM D 412 : 2006ae2

Elongation at break 40% ASTM D 412 : 2006ae2

Tear Resistance 150N ASTM D 624:00 (2012)

Dimension Stability 70°C ± 2°C for 6 hours SS 374 : 1994 Avg Linear Change in Length + 0.01Avg Linear Change in Width + 0.02

Modified Asphalt APP

Surface Finish Sanded or Mineral

Thickness of Sanded Surface 3mm , 4mm

Weight of Mineral Surface 4.5 kg / m2

Roll size 1m width x 10m length

Colours available for Green

Mineral Surface Grey, Red, Black (on indent basis)Specifications are subject to change without notification. Results shown are typical but reflect test procedures used. Actual field performance will depend on installation methods and site conditions.

SK FASTORCH

POLYESTER REINFORCED WATERPROOFING MEMBRANE

ECO FRIENDLY HIGH STRENGTH PREFORMEDMEMBRANE

Page 2: SK FASTORCH - Davco online

TYPICAL APPLICATION• Reroof and new construction roof for commercial and residential.• Foundation waterproofing.• Dome shaped roofs.• Bridge & Viaducts.• Under floor waterproofing.• Rooftop gardens.• Patio decks

FEATURES• Quick, simple, easy and inexpensive application.• Only one layer is required, thus reducing roof load and installation cost.• Can easily be maintained and repaired.• Can be exposed directly to sun thus eliminating need for protective coating, concrete or tiles.• No kettle or hot asphalt required.• No height restriction on application.

APPLICATION PROCEDURESTEP 1: Clean surface and prime with Davco SK Primer.

STEP 2: Begin from low point of roof to high. Application should begin in the valleys and work up hill to avoid backwater laps.

STEP 3: Unroll the membrane fully and allow side laps, reroll halfway and begin torching. Allow 4” lap joints along the roll edges and 5” on roll ends and transverse joints.

STEP 4: Pass the torch flame from side to side until the burn off film begins to fully melt. Move the roll at this time. DO NOT OVER HEAT.

STEP 5: The sanded or granulated surface at the roll edges or end laps should be scrapped off to provide for a smooth surface.

STEP 6: Recheck the seams to assure a minimal of 3mm bitumen outflow for water tight integrity.

Davco SK Fastorch Mineral System

Davco SK Fastorch Sanded System

EASY APPLICATIONOn a smooth, dry and greasefree deck or surface, apply a layer of Davco SK Primer. After drying, torch Davco SK Fastorch whilst rolling and pressing onto the substrate. Head overlap has to be 12cm and edge 10cm, the use of a trowel to seal the overlap is necessary. Refer to safety data sheet.

Disclaimer The use of this product is beyond the manufacturer's control and liability is restricted to the replacement of material proven faulty. The manufacturer is not responsible for any loss or damage arising from incorrect usage. Specifications are subjected to changes without prior notice. Before application, customers and users are requested to check that they have the latest version of this document from our website www.parexgroup.com.sg

SK FASTORCH

Updated WP10 Oct 2015

PAREXGROUP PTE LTD28 TUAS SOUTH AVENUE 8, SINGAPORE 637648TEL: (65) 6861 0632 FAX: (65) 6862 3915EMAIL: [email protected]: WWW.PAREXGROUP.COM.SG

DAVCO-ONLINEONLINE STORE : .COM.SG

ISO 14064 : 2006Certificate GMS-C / GHG / 0002

ParexGroup, a French multi-national company with headquarters in Paris, is a leading manufacturer of speciality products for the construction industry with operations in more than 20 countries, and our 2700 people around the world are the cornerstone of our growing organization.

Page 3: SK FASTORCH - Davco online
Page 4: SK FASTORCH - Davco online
Page 5: SK FASTORCH - Davco online
Page 6: SK FASTORCH - Davco online
Page 7: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 1 of 15

Project Reference

S/N

Project Title

Location

Description

Area

Owner/

Consultant

Year

1. Sembawang Air Base Roof - - 2008

2. Tuas Ave 10 Roof - - 2008

3. Bukit Timah Plaza Roof - - 2008

4. Grande Vista Roof - - 2008

5. King Albert Park Roof - - 2008

6. Pathlight School @ Ang Mo Kio Roof - - 2008

7. Parc Oasis Condo Roof - MCST 2008

8. Queenstown Telephone Exchange Roof - - 2008

9. Woodgrove Pri Sch - - Ministry Of

Education

2008

10. Causeway Point Roof 5000m2 - 2008

11. City Tower Roof 5000m2 - 2008

12. Far East Plaza Roof 5000m2 Far East

Organisation

2008

13. Maha Bodhi Sch @ Ubi Roof - Ministry Of

Education

2009

14. Signature Park Roof - - 2009

15. West View Pri Sch - - Ministry Of

Education

2009

16. Singapore Soka Association Roof - - 2009

17. Kensington Park Roof - National

Park Board

2009

18. Cedar Girls Secondary Sch Roof - Ministry Of

Education

2009

19. CCK Waterworks Roof - - 2009

Page 8: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 2 of 15

Project Reference

S/N

Project Title

Location

Description

Area

Owner/

Consultant

Year

20. Entrepreneur Centre Roof - - 2009

21. Jit Poh Building Roof - - 2009

22. Jurong Island Roof - - 2009

23. Northvale Condominium Roof 5000m2 - 2009

24. Changi Chapel Roof 700m2 - 2009

25. Re-roofing to Yishun, Choa Chu Kang &

Woodlands Polyclinic

Roof 500m2 - 2009

26. 6 Blks of 8 Storey Multi-User Light Industrial

Factory @ Sin Ming Lane

Roof 20,000m2 - 2009

27. Keat Hong Camp Roof - Ministry of Defence 2010

28. Bukit Panjang LRT Station RC Roof - SMRT 2010

29. Keat Hong Camp RC Roof 2800m2 Ministry of Defence 2010

30. Bukit Panjang LRT Station RC Roof - SMRT 2010

31. Upper Serangoon Shopping Centre RC Roof 850m2 - 2010

32. Entrepreneur Centre @ 50 Tagore Lane RC Roof 470m2 - 2010

33. Far East Shopping Centre RC Roof 1200m2 Far East Organisation 2010

34. Jit Poh Building @ 19 Keppel Road RC Roof 2700m2 - 2010

35. Mount Alvernia Hospital RC Roof 2400m2 - 2010

36. Paragon @ 290 Orchard Road RC Roof 3400m2 - 2010

37. Raycom Aerospace RC Roof 370m2 - 2010

38. Tanjong Pagar Distripark RC Roof 1260m2 - 2010

39. Biopolis Drive RC Roof 7120m2 - 2010

Page 9: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 3 of 15

Project Reference

S/N

Project Title

Location

Description

Area

Owner/

Consultant

Year

40. Tan Tock Seng Hospital RC Roof 800m2 Tan Tock Seng

Hospital

2010

41. Eunos Tech Park RC Roof 6100 m2 - 2010

42. 500 Riffles Range Road Roof 3000m2 - 2011

43. PSC @ 348 Jalan Boon Lay Roof 850m2 - 2011

44. 12 Kallang Sector Roof 1500m2 - 2011

45. 25 Changi South Ave 2 Roof 670m2 - 2011

46. The Bayshore Roof 1070m2 - 2011

47. Tampines One Roof 700m2 - 2011

48. Wak Tanjong Mosque Roof 290m2 - 2011

49. 155 Kallang Way Roof 4600m2 - 2011

50. 38 Woodland Ind Park E1 Roof 930m2 - 2011

51. 5 Burn Road Roof 1120m2 - 2011

52. Lion Towers @ 2 Essex Road Roof 930m2 - 2011

53. MAS Currency House Roof 1120m2 - 2011

54. High Street Plaza @ High Street Roof 280m2 - 2011

55. Ngee Ann Secondary School Concrete Roof - Ministry of Education 2011

56. Civil Defence College RC Roof 1380m2 SCDF 2011

57. M1 Building @ 10 International Biz Park RC Roof 2300m2 M1 2011

58. Mandarin Gardens @ 5 Siglap Road RC Roof 4700m2 MCST 2011

59. Park Shore @ 201 Tanjong Rhu Road RC Roof 1900m2 MCST 2011

Page 10: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 4 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

60. The Anchorage Condominium RC Roof 3700m2 MCST 2011

61. Tee Yih Jia Building Concrete Roof 3600m2 - 2011

62. Gordon Industrial Building RC Roof 3547m2 - 2011

63. East Spring Secondary School @ Tampines & Pasir

Ris Secondary School

RC Roof 1950m2 Ministry Of

Education

2011

64. Montford Ach @ Hougang Ave 8 RC Roof 450m2 - 2011

65. High Street Plaza @ High Street RC Roof 280m2 - 2011

66. 12 Kaki Bukit Crescent RC Roof 420m2 - 2011

67. Funan Square RC Roof 6300m2 - 2011

68. IMH @ 40 Buangkok Green RC Roof 940m2 IMH 2011

69. Lion Industrial Building RC Roof 1500m2 - 2011

70. Wyeth @ Tuas Street 2 RC Roof 1150m2 - 2011

71. 19 Bt Batok St 22 RC Roof 660m2 - 2011

72. 21 Moonstone Lane RC Roof 1080m2 - 2011

73. 601 Riffle Range Road RC Roof 1650m2 - 2011

74. No.1 Tuas South Ave 4 RC Roof 1500m2 - 2011

75. 100A Eu Tong Seng St #03-02 Roof 370m2 - 2012

76. Blk 1008 Toa Payoh North 3 Roof 700m2 - 2012

77. La Crystal @ 160 Killiney Road Roof 790m2 MCST 2012

78. Shaw Towers @ 100 Beach Road Roof 280m2 - 2012

79. 8 Hamilton Road Roof 260m2 - 2012

Page 11: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 5 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

80. 17 Changi South St 2 Roof 3400m2 - 2012

81. 192 Telok Ayer Street Roof 240m2 - 2012

82. 1001 Bukit Timah Road Roof 460m2 - 2012

83. 2 Ubi View Roof 950m2 - 2012

84. Leonie Gardens @ Leonie Hill Roof 1400m2 MCST 2012

85. 1 Geylang East Ave 1 Roof 1120m2 - 2012

86. 15 Defu Ave 1 Roof 510m2 - 2012

87. 15 Science Centre Road Roof 1680m2 - 2012

88. 17 Tuas Avenue 9 Roof 1300m2 - 2012

89. 20 Ang Mo Kio Ind Park 2A Roof 5000m2 - 2012

90. Central Grove Roof 790m2 - 2012

91. Cherry Hill @ 21 Lrg Lew Lian Roof 5410m2 MCST 2012

92. Chestervale @ 39 Bangkit Road Roof 4700m2 MCST 2012

93. NCS Hub @ 5 Ang Mo Kio St 62 Roof 2450m2 - 2012

94. Novotel Singapore @ Clarke Quay Roof 560m2 - 2012

95. The Merasaga Roof 880m2 MCST 2012

96. The Tropica Roof 4250m2 MCST 2012

97. Woodlands Mart Roof 3200m2 MCST 2012

98. Pan-I Complex Building RC Roof 6100m2 - 2012

99. 398 Telok Blangah Road RC Roof 840m2 - 2012

100 Agape Methodist Church RC Roof 2300m2 - 2012

Page 12: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 6 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

101 Little India Arcade Serangoon RC Roof 470m2 - 2012

102 De La Salle School RC Roof 430m2 Ministry Of

Education

2012

103 High Street Plaza @ High Street RC Roof 265m2 - 2012

104 Woodlands Spectrum RC Roof 6000m2 - 2012

105 Bo Tien Temple RC Roof 660m2 - 2012

106 Faber Garden Condominium @ Thomson RC Roof 840m2 MCST 2012

107 Floravale Condominium RC Roof 10000m2 MCST 2012

108 Regentville Condominium RC Roof 3600m2 MCST 2012

109 Maint. Project @ 21 Bukit Tunggal Road RC Roof 260m2 - 2012

110 Maint. Project @ 398 Telok Blangah Road RC Roof 840m2 2012

111 Maint. Project @ Serangoon Garden RC Roof 3260m2 - 2012

112 Maint. Project @ High Street Plaza RC Roof 820m2 - 2012

113 Woodlands Spectrum RC Roof 6000m2 JTC

Corporation

/ Jurong

Consultants

Pte Ltd

2012

114 Maint. Project @ Chen Su Lan Methodist RC Roof 680m2 - 2012

115 Maint. Project @ 31 Toh Guan Road East RC Roof 200m2 - 2012

116 Maint. Project @ Bayshore Condominium RC Roof 3450m2 MCST 2012

117 Maint. Project @ Pasir Ris Sec School RC Roof 420m2 Ministry Of

Education

2012

118 Maint. Project @ Regent Grove RC Roof 450m2 - 2012

Page 13: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 7 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

119 Maint. Project @ Regentville Condominium RC Roof 4670m2 MCST 2012

120 Maint. Project @ Siglap Sec School RC Roof 1390m2 Ministry Of

Education

2012

121 Jurong East Spec School Roof 200m2 MOE 2012

122 Jurong West School Roof 280m2 MOE 2012

123 Seng Kang N4 C15 Roof 550m2 MOE 2012

124 Toa Payoh Central CC Roof 950m2 People

Association

2012

125 4 Woodlands Loop Roof 460m2 - 2012

126 Blk 1008 Toa Payoh North 3 Roof 700m2 - 2012

127 The Legend @ 361 Bt Timah Rd Roof 140m2 - 2012

128 Pioneer JC Roof 5520m2 - 2012

129 The Richmond Roof 280m2 - 2012

130 Hillside Condominium Roof 5500m2 MCST 2012 /

2013

131 Marymount View Roof 800m2 MCST 2012

132 Park East Condominium Roof 780m2 MCST 2012

133 The Balmoral Spring Roof 400m2 MCST 2012

134 Uni Building Roof - MCST 2012

135 Apleton View Roof 170m2 MCST 2013

136 Changi South Ave 2 Roof 2800m2 - 2013

137 Mutiara View Condominium Roof 1000m2 MCST 2013

138 SIA Supplies Centre Roof 6500m2 SIA 2013

Page 14: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 8 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

139 BCA Academy @ 200 Braddell Road Roof 350m2 - 2013

140 St Anthony Pri School Roof 5100m2 MOE 2013

141 Maint. Project @ Sterling Condominium RC Roof 2400m2 - 2012 /

2013

142 Maint. Project @ UBI Centre RC Roof 280m2 - 2012

143 Maint. Project @ Mandai Link RC Roof 1020m2 - 2013

144 Maint. Project @ Tampines St 92 RC Roof 650m2 - 2013

145 Maint. Project @ Telok Kurau RC Roof 233m2 - 2013

146 Maint. Project @ Marsiling Industries RC Roof 760m2 - 2013

147 Maint. Project @ MAS Building RC Roof 430m2 MAS 2013

148 Maint. Project @ Serangoon North RC Roof 8600m2 - 2013

149 Maint. Project @ NUH RC Roof 6000m2 National

University

Hospital

2013

150 Maint. Project @ Irving Road RC Roof 3220m2 - 2013

151 Maint. Project @ 4 Lok Yang Road RC Roof 1000m2 - 2013

152 Maint. Project @ 10 Tampines St 34 RC Roof 3900m2 - 2012 /

2013

153 Maint. Project @ Coral Secondary School RC Roof 200m2 Ministry Of

Education

2013

154 Kaki Bukit Road 1 Roof 1,000m2 - 2013

155 Changi South Ave 2 Roof 3400m2 - 2013

156 Chin Swee Road Roof 1340m2 - 2013

157 La Crystal @ 160 Killiney Road Roof 560m2 - 2013

Page 15: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 9 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

158 Penjuru Close Roof 1860m2 - 2013

159 Raffles Institution Roof 1000m2 - 2013 /

2014

160 Seletar Satallite Earth Station RC Roof 1880m2 2013

161 Jurong Port Road RC Roof 8700m2 - 2013

162 Project @ Sentosa RC Roof 600m2 - 2013

163 Changi Airfreight Cargo Roof 2,200m2 - 2013 /

2014

164 Science Centre Road Roof 1,380m2 - 2013

165 Industrial @ Tai Seng Drive Roof 2,500m2 - 2013

166 Mandai Link For Office Roof 11,000m2 - 2013

167 49 Thomas Walk Roof 1,500m2 - 2013

168 Industrial Project @ Marsiling Industries Estate Roof 820m2 - 2013

169 NUH Main Building Roof 3,390m2 - 2013 /

2014

170 Industrial Project @ Serangoon North Roof

12,690m2 - 2013

171 Industrial Project @ 4 Lok Yang Road Roof

1,140m2 - 2013

172 Telekomunikasi Indonesia Intl Pte Ltd For Office Roof 660m2 - 2013

173 Industrial Building @ 42 Toh Guan Road East Roof 21,140m2 - 2013

174 Sentosa Blk 39 Artillery Road Roof 600m2 - 2013

175 Reroofing @ Canberra Roof 1200m2 - 2014

176 Cuscaden Road Roof 2500m2 - 2014

Page 16: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 10 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

177 Bukit Tinggi Road Roof 1380m2 - 2014

178 South View Primary School Roof 2070m2 - 2014

179 Central View Roof 1300m2 - 2014

180 Evergreen Park Roof 2700m2 - 2014

181 Park East Condominium Roof 2000m2 - 2014

182 Plaza Singapura Roof 1460m2 - 2014

183 Aston Green RC Roof 2600m2 - 2014

184 Hill Street Roof 500m2 - 2014

185 Industrial Project @ Pasir Panjang Road Roof 500m2 - 2014

186 Industrial Project @ Senoko Ave Roof 1,940m2 - 2014

187 Paya Lebar Methodist Girls Primary School Roof 690m2 - 2014

188 Regentville Condominium Roof 690m2 - 2014

189 Commonwealth Drive Roof 500m2 - 2015

190 Joo Seng RC Roof 3800m2 - 2015

191 Parry Ave Roof 460m2 - 2015

192 Tanjong Katong Complex RC Roof 6840m2 - 2015

193 Ballota Park Roof 9400m2 - 2015

194 Old folks house at Buangkok Roof 3220m2 - 2015

195 Singtel Katong RC Roof 2280m2 - 2015

196 SP Power Grid Jurong District Office Roof 700m2 - 2015

197 Tuas View Circuit Roof 7300m2 - 2015

Page 17: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 11 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

198 Singtel Nee Soon Base RC Roof 460m2 - 2015

199 Luzene Building RC Roof 920m2 - 2015

200 Mandai Estate RC Roof 920m2 - 2015

201 Oprah Estate Primary School Roof 1610m2 - 2015

202 Ping Yi Secondary School Roof 690m2 - 2015

203 SAC Secondary School Roof 920m2 - 2015

204 Shun Li Industrial Estate Roof 780m2 - 2015

205 Temasek JC & Secondary School Roof 1920m2 - 2015

206 Marewoods Condominium Roof 6660m2 - 2015

207 Murata Roof 4500m2 - 2015

208 The Summit Roof 2000m2 - 2015

209 OSSIA Building RC Roof 1120m2 - 2015

210 Ngee Ann Polytechnic Roof 500m2 MOE 2015

211 Science Park Roof 1200m2 - 2015

212 Kaki Bukit Road 1 Roof 3700m2 - 2015

213 Orchard Tower Roof 920m2 - 2015

214 Changi Rise Condominium Roof 460m2 - 2015

215 Citynet-Bedok Central Office Roof 2070m2 - 2015

216 Hillington Green Condominium Roof 350m2 - 2015

217 NUH Roof 5900m2 - 2015

Page 18: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 12 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

218 Regency Park Roof 6200m2 - 2015

219 SIAEC Engine Test Facility Roof 2070m2 - 2015

220 The Teneriffe Roof 14,300m2 - 2015

221 Kuo Chuan Presbyterian Secondary School Roof 2000m2 MOE 2015

222 Compass Height Roof 3950m2 - 2015

223 Neptune Court Roof 460m2 - 2015

224 Henderson Road Roof 1160m2 - 2015

225 Jurong Port Roof 2300m2 - 2015

226 Yong Lin School of Medicine Roof 920m2 - 2016

227 Aspen Heights Roof 7000m2 - 2016

228 Bukit Batok Roof 3520m2 - 2016

229 Boon Keng Roof 1420m2 - 2016

230 Juniper Lodge Roof 2650m2 - 2016

231 Senoko Drive Roof 960m2 - 2016

232 West Bay Condominium Roof 2880m2 - 2016

233 Jalan Tenteram Roof 3550m2 - 2016

234 Katong Gardens Roof 2460m2 - 2016

235 Changi Roof 700m2 - 2016

236 Lam Soon Building Roof 1200m2 - 2016

237 Esplanade Roof 410m2 - 2016

Page 19: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 13 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

238 Sin Ming Motor Roof 540m2 HDB / Jurong Consultants 2016

239 Toh Guan Road East Roof 1080m2 - 2016

240 The Infiniti Roof 300m2 - 2016

241 Prinsep Street Roof 270m2 - 2016

242 Ayer Rajah Roof 980m2 - 2016

243 Bedok Green Sec School Roof 1840m2 Ministry of Education 2016

244 Broadrich Secondary School Roof 1700m2 Ministry of Education 2016

245 Pasir View Roof 1840m2 - 2016

246 Paya Lebar Methodist Girls Primary

School

Roof 960m2 Ministry of Education 2016

247 Woodlands Road Roof 2340m2 - 2016

248 Pandan Crescent Roof 1000m2 - 2016

249 Boon Lay Roof 5500m2 - 2016

250 Causeway Point Roof 1380m2 - 2016

251 NUH Roof 6900m2 - 2016

252 Leedon Road Roof 1150m2 - 2016

253 Woodlands Industrial Park Roof 3800m2 - 2016

254 Tech Place I Roof 11400m2 - 2016

Page 20: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 14 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

255 Tech Point Roof 6300m2 - 2016

256 Project @ Jurong West Roof 1800m2 - 2016

257 NCS Hub Roof 750m2 - 2016

258 Kuo Chuan Presbyterian Secondary School Roof 2500m2 - 2017

259 Project @ Tuas Roof 1000m2 - 2017

260 Bullion Park Condominium Roof 4500m2 - 2017

261 Sia Changi Roof 2760m2 - 2017

262 Project @ Pandan Loop Roof 6900m2 - 2017

263 Project @ Pioneer Sector Roof 5200m2 - 2017

264 Seagate Roof 2300m2 - 2017

265 ST Micron Roof 1600m2 - 2017

266 The Synergy Roof 460m2 - 2017

267 Changi North Roof 1155m2 - 2017

268 Henderson Road Roof 1600m2 - 2017

269 Serangoon North Roof 1380m2 - 2017

270 Balmoral Residences Roof 1300m2 - 2017

271 Toa Payoh Roof 1000m2 - 2017

272 Changi North Roof 1200m2 - 2017

Page 21: SK FASTORCH - Davco online

A Selection of Local Projects (Singapore) Using

Davco SK Fastorch 4.5kg/m2 / Sanded 3mm / Sanded 4m Page 15 of 15

Project Reference

S/N

Project Title

Location

Description

Area Owner/

Consultant

Year

273 Chai Chee Roof 690m2 - 2017

274 Parc Palais Roof 10000m2 - 2018

275 Simsville Condominium Roof 4000m2 - 2018

276 Project @ Tomlinson Road Roof 800m2 - 2018

277 Project @ Neo Tiew Crescent Roof 1800m2 - 2018

278 Project @ Yishun Industrial Street Roof 800m2 - 2018

279 Project @ Sunview Road Roof 2700m2 - 2018

280 Project @ Gukha Camp Roof 800m2 - 2018

281 D’Manor Roof 2400m2 - 2018

282 Project @ Bukit Merah Roof 2500m2 - 2018

283 Holy Innocent's High School Roof 5500m2 - 2018

284 LTA @ Hampshire Road Roof 1800m2 - 2018

285 North Vista Secondary School Roof 2000m2 - 2018

286 Sathya Sai Baba Centre Roof 460m2 - 2018

287 The Garden @ Bishan Roof 1600m2 - 2018

288 Valley Park Roof 4600m2 - 2018

289 National University Singapore Roof 2500m2 - 2018

290 Rich Mansion Roof 800m2 - 2018

Page 22: SK FASTORCH - Davco online

SDS: DAVCO SK FASTORCH

Page 1 of 4

SAFETY DATA SHEET 1. IDENTIFICATION

PRODUCT NAME DAVCO SK FASTORCH CHEMICAL FAMILY Modified Bituminous Sheet EMERGENCY CONTACT ParexGroup (Singapore) Pte Ltd 28 Tuas South Avenue 8 Singapore 637648 Telephone : 65-68610632 2. HEALTH HAZARD DATA

Nil 3. INFORMATION ON INGREDIENTS

There are no dangerous substances within the meaning of EU Directive 67/548/CE and subsequent amendments and additions to them. 4. FIRST AID MEASURES

EYE In contact with molten material, rinse with cold

water for at least 15 minutes. Do not attempt to remove material. Seek medical attention.

SKIN In contact with molten material, continuously flush

skin with cold water and do not remove material from skin. Remove any contaminated clothing if this is not stuck to the skin and obtain medical attention.

INGESTION Seek medical attention. INHALATION Move to fresh air. Consult a doctor if effect persists.

Page 23: SK FASTORCH - Davco online

SDS: DAVCO SK FASTORCH

Page 2 of 4

5. FIRE FIGHTING MEASURES

FLASH POINT > 230 oC approx. (bitumen) FLAMMABLE LIMIT N.A. LOWER - UPPER - EXTINGUISHING MEDIA General extinguishing media. Foam, CO2, Dry

chemical, water fog. Do not use water jets. SPECIAL FIRE FIGHTING None PROCEDURE 6. ACCIDENTAL RELEASE MEASURES

Not applicable. 7. HANDLING AND STORAGE

PERSONAL PROTECTION Keep the rolls in the upright position. Store in

shaded areas and away from direct sunlight. Protect from extremes of temperature. Avoid applying in confined spaces and/or where there is no proper ventilation.Use protective tools such as gloves and goggles with side shields while handling to avoid injury.

8. EXPOSURE CONTROLS / PERSONAL PROTECTION

ENGINEERING CONTROL n.a. PERSONAL PROTECTION Wear safety goggles and face mask. Wear

proper protective gloves. Enclosed areas must have adequate extraction plant for the vapours generated during torching operations. If ventilation is not sufficient, wear filter mask for protection against organic vapours, dust and fumes, spray painting. Always wash hand before eating, drinking or visiting the toilet.

Page 24: SK FASTORCH - Davco online

SDS: DAVCO SK FASTORCH

Page 3 of 4

9. PHYSICAL AND CHEMICAL PROPERTIES

APPEARANCE Sheeting in rolls ODOUR mildly bituminous SOLUBILITY IN WATER Nil LIPID SOLUBILITY Yes (organic solvents, oils) BOILING POINT > 470oC approx. (bitumen) MELTING POINT > 100oC approx. DENSITY 1.0 – 1.5 kg/dm3 FLAMMABILITY (solids, gas) calorific value 9000 kcal/kg approx. RATE OF BURNING Not Determined SELF IGNITION > 485 oC approx. (bitumen) 10. STABILITY AND REACTIVITY

Not applicable. 11. TOXICOLOGICAL INFORMATION

This product is not considered a carcinogen. 12. ECOLOGICAL INFORMATION

This material is not known as biodegradable. 13. DISPOSAL CONSIDERATIONS

This preparation is not classified as special waste under the Singapore control of pollution. Consult local regulations before disposal. 14. TRANSPORT INFORMATION

No special packaging requirements. Not classified as dangerous goods under the United Nations Transport Recommendations.

Page 25: SK FASTORCH - Davco online

SDS: DAVCO SK FASTORCH

Page 4 of 4

15. REGULATORY INFORMATION

Not classified as dangerous under current regulation. 16. OTHER INFORMATION

The information given is based on our knowledge of this product, at the time of publication. It is given in good faith. Any suggestion and recommendations made are without guarantee and liability since conditions of use are beyond our control. Appropriate warning and safe handling procedures should be provided to all those who handle and use the product and no liability can be accepted for any loss, injury or damage resulting from its use.

n.a. = not applicable Date of Issue : July 2014 (Rev.01)

.