AGUSAN
River
Basin
MINDANAO
River Basin
MINDANAO RIVER BASIN
2ND LARGEST RIVERBASIN IN THE
PHILIPPINES
Basin Area=23,170 Sq. km
Rivers Length
Pulangi 323 kms
Ala 120 kms
Mindanao 100 kms
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
3/43
MINDANAO RIVER BASIN
PULANGI RIVER
MINDANAO RIVER
ALA RIVER BANGA RIVER
LIGAWASAN MARSH
TAMONTAKA RIVER
ILLANA BAY
SIMUAY RIVER
ALA VALLEY
3
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
4/43
ELEV.1,500 M.
TIGUA R.
MANUTO R.
KULAMAN R.
KABACAN R.
MLANG R.
MALASILA R.
ALIP R.
LAKE BULUANBANGA R.
HEAD WATER ALA R.
ELEV. 1600 M
LAKE SEBU
SEPAKA R.
MAGANOY R
LIGAWASAN
MARSH
BULUAN R
EBPANAN
MARSHLIBUNGAN
MARSH
MALITUBOG R
MALADUGAO R.
MULETA R
MARAMAG R.
NATAYLAN R
MANUPALI R
SAWAGA R
M
I
N
D
A
N
A
O
R
PAGALUNGAN
PIKIT
ALLAH R. CROSSING DATU PIANG
LIBUNGAN R
SIMUAY R
TAMONTAKA
RIVERCOTABATO CITY BRIDGE
LEGEND:
Rivers
Existing Cut-off
Channel
Marsh Area
SCHEMATIC RIVER FLOW
LOWER
COTABATO RIVER
BASINRiver Flow
Direction
The Mindanao (Cotabato) River BasinHEAD WATER PULANGI R.
4
Courtesy of RDC 12, FRANK_2008 presentation
N
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
5/43
SITUATION AT THE MRB
Heavy rainsstarted in the
month of May2011
as of 5pm, May22, 2011: PAGASA
estimatedtropical stormChedengat1,050 km East
ofNorthernMindanao
June 9, 2011:Typhoon Dodongcame in.
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
6/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
7/43
Municipality of Lambayong, Sultan Kudarat Province
June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
8/43
BREACH SECTION
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
9/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
10/43
The Pulangi-Pagalungan Rivers,Cut-off Channel towards
Ligawasan Marsh
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
11/43
Tunggol Bridge
June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
12/43
Tunggol Bridge
Scoured Area
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
13/43
Tunggol Bridge
Along Davao-Cotabato Road
Damaged Slope
Protection
Scoured AreaElectric Post
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
14/43Facing Upstream
Scoured AreaSilted Area
Electric Tower
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
15/43
Malitubog-Maridagao, Libungan RiversFrom the areas of Lanao del Sur and Bukidnon flow
the Libungan and Malitubog-Maridagao Riversrespectively. They eventually flow into the
Ligawasan Marsh. The swelling of these heavily
silted rivers and their tributaries due to the heavyrainfall in May and June aggravated by wanton
deforestation caused severe flooding in the province
of North Cotabato. This took place particularly in
the municipalities Alamada, Libungan, Pigcawayan,
and Midsayap and resulted in the destruction of
thousands of hectares of farmlands.
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
16/43
Simuay-Ambal Rivers
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
17/43
Segment II
Segment III
Segment I
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
18/43June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
19/43
Illana Bay
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
20/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
21/43
3 marshes---June
11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
22/43Ebpanan Marsh---June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
23/43
Ligawasan Marsh---June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
24/43
Upstream of Mindanao River----June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
25/43
June 11, 2011
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
26/43
Illana Bay
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
27/43
Sultan Kudarat area
Illana Bay
Matampay River
Rio Grande de Mindanao
tampay Bridge
Quirino Bridge
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
28/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
29/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
30/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
31/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
32/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
33/43
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
34/43
What can be done? In the short term:
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
35/43
What can be done? In the short term:1. Fast track the dredging of Rio Grande de Mindanao
simultaneous dredging of various stretches.
2. Regularly clearing the water hyacinth as soon asthey flow down towards Delta and Quirino bridges.
3. Revise the footings of both bridges so that water
hyacinth would slide by them.4. Fast track the work of widening and completing the
Simuay cut-off channel and closing the breach.
5. Protect Tunggol Bridge and the old Matampay
Bridge.
6. Construct Raradangan and Olandang Bridges.
7. Deploy 3 WaterMasters for the Mindanao River
Basin
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
36/43
In the long term:
1. Replace Quirino Bridge2. Systematize the dredging of the Rio Grande from
Yllana Bay to Kubuntalan.
3. Reforestation of the Mindanao River Basin
4. Establishing catchment structures to catch water
hyacinth as they flow from Ligawasan Marsh
down towards Cotabato City.
5. Implement the high impact projects identified bythe Mindanao River Basin Integrated
Management and Development Master Plan:
HIGH IMPACT PROJECTS
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
37/43
HIGH IMPACT PROJECTS
The Projects to be subjected for pre-feasibility study level are as
follows:
1) Pre-feasibility Study of the Development of Early Warning and Flood
Forecasting System Project for the Mindanao and Malungun-Buayan
River Basins
2) Pre-feasibility Study of an Integrated Flood Control, River Bank
Protection and Rehabilitation Project for Ala River System.3) Pre-feasibility Study of an Integrated Flood Control, River Bank
Protection and Rehabilitation Project for Pulangui River System.
4) Pre-feasibility Study of an Integrated Flood Control, River Bank
Protection and Rehabilitation Project for Rio Grande de MindanaoRiver System.
5) Pre-feasibility Study of an Integrated Flood Control, River Bank
Protection and Rehabilitation Project for Malungun-Buayan River
System.
6) Pre-feasibility Study of Dendro Thermal Power
HIGH IMPACT PROJECTS
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
38/43
HIGH IMPACT PROJECTS
The Projects to be subjected for feasibility study level are asfollows;
1) Feasibility Study of an Integrated Flood Control, River
Bank Protection and Rehabilitation Project for Ambal-
Simuay River System2) Feasibility Study of Siltation Control and Management
Project for Rio Grande de Mindanao River System.
3) Feasibility Study of Siltation Control and Management
Project for Ala River System.4) Feasibility Study of Siltation Control and Management
Project for Malungun-Buayan River System.
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
39/43
6. Establish an agency with the
necessary powers and authority toimplement the Master Plan.
Priority Projects
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
40/43
Priority ProjectsName of the Project Status Allocation
1. Community-based Integrated Dredging andManagement Model for Mindanao River Basin
No Funding
2. Channelization and Bank Protection with Sluice
gate for Emergency Project at Simuay River and
closure of Breach
On-going P 60 M
3. Immediate Provision of additional Watermaster
for Task Force Deployment
4. Simultaneous Dredging of Rio Grande de
Mindanao from Bucana to Quirino Bridge (7Kms.)
On-going
(200Mreleased)
P 250 M
5. Tunggol Bridge II, Bank Protection, Channelization
Phase I and Phase II, Datu Montawal,
Maguindanao (very critical bridge linking Davao
City and Cotabato City)
For Funding P 75 M
6 Repair of Olandang Bridge which collapsed Funded P 45M P 49 M
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
41/43
6. Repair of Olandang Bridge which collapsed
during typhoons Frank and Cosme
Funded P 45M
FY 2011
P 49 M
7 . Repair/Rehabilitation of Ala River Flood
Control, Channelization at Punol, Sigayan,
Panabungan, Papakan Section, Lambayong,
Sultan Kudarat
On-going
(70M released)
P 100 M
8. Repair/Rehabilitation of Ala River Flood
Control, Channelization and Bank Protection
along Punol, Sigayan, Panabungan, Papakan
Section, Lambayong, Sultan Kudarat
No funding P 100 M
9. Proposed Upgrading/Concreting of Quirino
Delta Bridge Access Road at Barangay
Salimbao, Sultan Kudarat, Maguindanao
Funded 20M
FY 2011 ARMM
RIP
P 33.4885 M
10. Repair and Rehabilitation of Ala River Flood
Control, Channelization and Bank Protection,
Sultan sa Barongis, Maguindanao
11. Repair of Raradangan Bridge
No Funding P 50 M
11 Construction of Pingiuaman Bridge I Lambayong No Funding P 40 M
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
42/43
11. Construction of Pingiuaman Bridge I, Lambayong,
Sultan Kudarat
No Funding P 40 M
12. Construction of Pingiuaman Bridge II, Lambayong,
Sultan Kudarat
No Funding P 20 M
13. Construction of Sadsalan Bridge II, Lambayong,
Sultan Kudarat
Completed P 80 M
14. Construction of Drainage Canal at Barangay
Buluan Creek, Phase V, Brgy. Buluan, Pigcawayan,
Cotabato
No Funding P 5 M
15. Improvement/Rehabilitation of Malu-ao Guigeken
Drainage Canal, Pigcawayan, Cotabato (Phase I)
Funded 15M
FY 2011
P 20 M
16. Protection of Dike and Extension of Cut-Off
Channel of Libungan River, Phase I (NIA)
No Funding P 15 M
17. Repair/Rehabilitation of Grebona Bridge at
Banisilan, Alamada
Completed P 35 M
18. Replacement of Quirino Bridge No Funding P 250
19. Preparation of Master Plan for the Mindanao
River Basin
On-going P 50 M
8/6/2019 Situation Report_Mindanao River Basin_for June 22, 2011
43/43
Thank you!
God bless!