Site Service ReportISSLeonardo,LutonPrepared for:
Produced By: Keith Taylor Project Manager: Anita BagnowskaWork Order: Project Number: 900119652Date of Report: 21-12-2020
Introduction/Scope of work:Non intrusive survey of PFC equipment
Site Work - Date: Start: End: 17-11-2020 18-11-2020
Assets:CustNaming
DeviceType
Brand Range Type SerialNumber
Manufacture Year
Substation Construction:
Environment:
General Condition of equipment:
Summary of Work Completed: Interior substationThe PFC controller is not functioning,a full intrusive survey and testof components is required on this unit to establish the cause of thecontrol failureImage 1PFC controllerThe surge protection module on this Switchboard is displayingreduced protection and needs replacingImage 2Surge protection remote module displaying reduced protectionThe transformer temperature relay is not functioning and requiresintrusive investigation to establish cause of failureExterior substation(not outdoor)The PFC controller is not functioning ,a full intrusive survey andtest of components is required on this unit to establish the cause ofthe control failureThe ventilation grills and fan covers on this unit are in poorcondition and require attentionImage 3Ventilation grillImage 4Fan coversImage 5PFC controllerThe surge protection module on this Switchboard is displayingreduced protection and needs replacingImage 6Surge protection remote module displaying reduced protectionThe battery charger in this substation is constantly chargingImage 7Battery chargerImage 8Date of last battery charger maintenanceImage 9 and 10Damage to Switchroom door grills on both doorsImage 11Ingress of leaves
Image 1
Image 2
Image 3
Image 4
Image 5
Image 6
Image 7
Image 8
Image 9
Image 10
Image 11
Summary of work performed additional to original scopeType Description of work
performedComplete
N/A N/A N/A
Additional Parts used to be billedPart Number Quantity DescriptionN/A N/A N/A
Outstanding Actions/Recommendations: As above report
Work complete? Yes
Is there evidence of unauthorised entry? No
Report Created by:Print Sign Date
18-11-2020
Reviewed by Project Manager:Print Sign Date
Pending Pending Pending