Site Service ReportVeolia Environmental Services Shrewsbury Recycling Centre Prepared for:Nathan Foulkes
Site Service ReportProduced By: Nathan Foulkes Project Manager: 13-07-2019Work Order: WO-07217836 Project Number: 900142404Date of Report: N/A
Introduction/Scope of work:/home/wwwschneider/public_html/ArchivosAPP/FotosReportes/Imagen-20191707080628-727482520.jpg
Site Work - Date: Location name: Work orderstart date:
N/A Shrewsbury 13-07-2019
Schneider Project Number 900142404
Report Produced By Ashley Matthews
Customer Veolia Environmental Services
Date of Report 17-07-2019
Site Name Shrewsbury Recycling Centre
Schneider Project Manager ADRIAN COOKE
Customer Contact Nathan Foulkes
Site Work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.
Start 13-07-2019#09:00
End 13-07-2019#12:00
Introduction/Scope of work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.
Assets:
CustNaming
DeviceType
Brand Range Type SerialNumber
Manufacture Year
Substation Construction: Metal clad.
Environment: Recycling Centre
General Condition of equipment: Good condition.
Summary of Work Completed: Customer reported issues with trying to re-close the main incomingVCB on the PIX Switchboard.
Upon arrival to site various issues were found as to why the mainincomer would not re-close.
1. The master trip relay for the main incomer had not been resetmanually. Without this reset a close operation could not beperformed.
2. The close signal for the main incoming VCB is wired through acontact on panel 3 and panel 5. The purpose of this is to ensureneither of the generator VCB`s are closed and in operation whentrying to re-close the mains supply. As the diesel generator was stillrunning on panel 5 a close operation could not be performed.
After shutting down the diesel generator on panel 5 and allowingthe VCB to open, a close signal was sent to the main incomingVCB to re-close. This operation was successful and all power wasrestored.
Summary of work performed additional to original scopeType Description of work
performedComplete
N/A N/A N/A
Additional Parts used to be billedPart Number Quantity DescriptionN/A N/A N/A
Outstanding Actions/Recommendations: No further action required.
Work complete? Yes
Is there evidence of unauthorised entry? No
Insert Photo:
Image 1
Report Produced By Ashley Matthews
Report Created by:Print Sign Date
Ashley Matthews
13-07-2019
Reviewed by Project Manager:Print Sign Date
Pending Pending Pending
Introduction/Scope of work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.
Assets:CustNaming
DeviceType
Brand Range Type SerialNumber
Manufacture Year
Substation Construction: Metal clad.
Environment: Recycling Centre
General Condition of equipment: Good condition.
Summary of Work Completed: Customer reported issues with trying to re-close the main incomingVCB on the PIX Switchboard.
Upon arrival to site various issues were found as to why the mainincomer would not re-close.
1. The master trip relay for the main incomer had not been resetmanually. Without this reset a close operation could not beperformed.
2. The close signal for the main incoming VCB is wired through acontact on panel 3 and panel 5. The purpose of this is to ensureneither of the generator VCB`s are closed and in operation whentrying to re-close the mains supply. As the diesel generator was stillrunning on panel 5 a close operation could not be performed.
After shutting down the diesel generator on panel 5 and allowingthe VCB to open, a close signal was sent to the main incomingVCB to re-close. This operation was successful and all power wasrestored.
Summary of work performed additional to original scopeType Description of work
performedComplete
N/A N/A N/A
Additional Parts used to be billedPart Number Quantity DescriptionN/A N/A N/A
Outstanding Actions/Recommendations: No further action required.
Work complete? Yes
Is there evidence of unauthorised entry? No
Report Created by:Print Sign Date
Ashley Matthews
13-07-2019
Reviewed by Project Manager:Print Sign Date
Pending Pending Pending