Site Service Report Veolia Environmental Services Shrewsbury Recycling Centre Prepared for:Nathan Foulkes Site Service Report Produced By: Nathan Foulkes Project Manager: 13-07-2019 Work Order: WO-07217836 Project Number: 900142404 Date of Report: N/A

Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

Site Service ReportVeolia Environmental Services Shrewsbury Recycling Centre Prepared for:Nathan Foulkes

Site Service ReportProduced By: Nathan Foulkes Project Manager: 13-07-2019Work Order: WO-07217836 Project Number: 900142404Date of Report: N/A

Page 2: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

Introduction/Scope of work:/home/wwwschneider/public_html/ArchivosAPP/FotosReportes/Imagen-20191707080628-727482520.jpg

Site Work - Date: Location name: Work orderstart date:

N/A Shrewsbury 13-07-2019

Schneider Project Number 900142404

Report Produced By Ashley Matthews

Customer Veolia Environmental Services

Date of Report 17-07-2019

Site Name Shrewsbury Recycling Centre

Schneider Project Manager ADRIAN COOKE

Customer Contact Nathan Foulkes

Site Work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.

Start 13-07-2019#09:00

End 13-07-2019#12:00

Introduction/Scope of work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.

Assets:

Page 3: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

CustNaming

DeviceType

Brand Range Type SerialNumber

Manufacture Year

Substation Construction: Metal clad.

Environment: Recycling Centre

General Condition of equipment: Good condition.

Summary of Work Completed: Customer reported issues with trying to re-close the main incomingVCB on the PIX Switchboard.

Upon arrival to site various issues were found as to why the mainincomer would not re-close.

1. The master trip relay for the main incomer had not been resetmanually. Without this reset a close operation could not beperformed.

2. The close signal for the main incoming VCB is wired through acontact on panel 3 and panel 5. The purpose of this is to ensureneither of the generator VCB`s are closed and in operation whentrying to re-close the mains supply. As the diesel generator was stillrunning on panel 5 a close operation could not be performed.

After shutting down the diesel generator on panel 5 and allowingthe VCB to open, a close signal was sent to the main incomingVCB to re-close. This operation was successful and all power wasrestored.

Summary of work performed additional to original scopeType Description of work

performedComplete

N/A N/A N/A

Additional Parts used to be billedPart Number Quantity DescriptionN/A N/A N/A

Page 4: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

Outstanding Actions/Recommendations: No further action required.

Work complete? Yes

Is there evidence of unauthorised entry? No

Insert Photo:

Image 1

Report Produced By Ashley Matthews

Report Created by:Print Sign Date

Ashley Matthews

13-07-2019

Reviewed by Project Manager:Print Sign Date

Pending Pending Pending

Page 5: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

Introduction/Scope of work Call Out - Issue with trying to re-close Main Incoming VCB on PIX Switchboard.

Assets:CustNaming

DeviceType

Brand Range Type SerialNumber

Manufacture Year

Substation Construction: Metal clad.

Environment: Recycling Centre

General Condition of equipment: Good condition.

Summary of Work Completed: Customer reported issues with trying to re-close the main incomingVCB on the PIX Switchboard.

Upon arrival to site various issues were found as to why the mainincomer would not re-close.

1. The master trip relay for the main incomer had not been resetmanually. Without this reset a close operation could not beperformed.

2. The close signal for the main incoming VCB is wired through acontact on panel 3 and panel 5. The purpose of this is to ensureneither of the generator VCB`s are closed and in operation whentrying to re-close the mains supply. As the diesel generator was stillrunning on panel 5 a close operation could not be performed.

After shutting down the diesel generator on panel 5 and allowingthe VCB to open, a close signal was sent to the main incomingVCB to re-close. This operation was successful and all power wasrestored.

Summary of work performed additional to original scopeType Description of work

performedComplete

N/A N/A N/A

Page 6: Site Service Report€¦ · Ashley Matthews Customer Veolia Environmental Services Date of Report 17-07-2019 Site Name Shrewsbury Recycling Centre Schneider Project Manager ADRIAN

Additional Parts used to be billedPart Number Quantity DescriptionN/A N/A N/A

Outstanding Actions/Recommendations: No further action required.

Work complete? Yes

Is there evidence of unauthorised entry? No

Report Created by:Print Sign Date

Ashley Matthews

13-07-2019

Reviewed by Project Manager:Print Sign Date

Pending Pending Pending