Page 1: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Site selection and setting out

Biogas ToT Course

May 10 – 15, Kampala, Uganda

Page 2: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite selection

Main considerations

• Easy construction works– Water logging– Rock

• Minimum construction cost• Easy operation and maintenance

– Feeding– Use of main gas valve– Composing and use of slurry– Checking of gas leakage– Draining condensed water from pipeline.

• The site should guarantee plant safety

Page 3: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements I

• Constant, high ambient temperature• Even and smooth surface• Slightly in elevated than the surrounding• Close to:

– dung collection point– water point– gas application point

• 2 meter away from foundations• Space for plant and compost-pit• Away from wells to avoid ground water pollution

Page 4: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements II

• Sufficient distance to trees• Adequate distance from main trail or unsafe areas• Good bearing capacity of soil• Limited space: cattle shed on top of the plant after

proper backfill• Reasonably far from any machine producing

vibration on soil

Page 5: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out

Page 6: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out

Page 7: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaLay-out example

Digester OutletInlet

Slurry Pit

Slurry Pit

Toilet

Page 8: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaReference line

Reference line30 – 50cm above

ground level

> 20 cm

30 cm

Page 9: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda