KEY PERSONNEL RESUME Name: Mohamed Aly ElSharkawy Proposed Position: Site Manager Discipline: Electronic & Communication Engineering Minimum Qualification: BE Electronic & Communication English Speaking Capability: Excellent Career Objective Seeking a position as a valued member that leverages my achievements, skills, energy and talent for identifying superior job candidates. CAPABILITIES AND PERSONAL TRAITS Work together with other engineers and working level staff to solve and define the developmental problems. Provide technical assistance and solution to the team. Intelligence, Honesty, Professionalism. Innovation, Ingenuity, Dedication to work. Prompt decision-making. Meeting challenges keeping project on schedule & within budget. Team leader and a team player with motivational skills. Flexibility and adaptability. Able to work independently in the area of authority. Work Experience: Period: Jan 2015 –Present Company: SSEM Project: PS1 SWCC Ras-Al-Khair WTS Project Position: Station Manager

Site Manager - Mohamed Aly ElSharkawy

Embed Size (px)

Citation preview

Page 1: Site Manager - Mohamed Aly ElSharkawy

KEY PERSONNEL RESUME

Name: Mohamed Aly ElSharkawy Proposed Position: Site Manager

Discipline: Electronic & Communication Engineering

Minimum Qualification: BE Electronic & Communication

English Speaking Capability: Excellent

Career Objective

Seeking a position as a valued member that leverages my achievements, skills, energy and talent for identifying superior job candidates.

CAPABILITIES AND PERSONAL TRAITS

Work together with other engineers and working level staff to solve and define the developmental problems.

Provide technical assistance and solution to the team. Intelligence, Honesty, Professionalism. Innovation, Ingenuity, Dedication to work. Prompt decision-making. Meeting challenges keeping project on schedule & within budget. Team leader and a team player with motivational skills. Flexibility and adaptability. Able to work independently in the area of authority.

Work Experience:

Period: Jan 2015 –PresentCompany: SSEMProject: PS1 SWCC Ras-Al-Khair WTS Project Position: Station Manager

Monitoring and controlling remaining construction activities and taking corrective actions.

Implements systems to comply with Health & Safety Regulations and ensure accident free sites.

Take the work permits from SWCC, and coordination with Power Plant Contractor for Underground cables, MV System and other concern departments.

Arrange all Material, Equipment, Manpower etc Following up with supplier.

Page 2: Site Manager - Mohamed Aly ElSharkawy

Following up for the closing of TOD punch list & walk through punch list. Following up with Head Office. Good communication skills with client SWCC/Consultant.

Period: Apr 2011 – Dec. 2014Company: SSEMProject: PS1 SWCC Ras-Al-Khair WTS Project Position: Senior Electrical Site Engineer

Responsibility:

MV/LV system (supervision / supplier coordination) MV Cable laying: Preparation of BOQ (review the cable route drawing, estimation of cable

length and required accessories ) Preparation of the cable trench as per the approved norms. Cable laying of MV cable (13.8kv, 1Cx 630 mm2, XLPE ) , preparation for

the requirement cable pulling machine , rollers & required manpower. Supervision for cable jointing as per the standard. Mugger test 5KV DC Hi-

pot test. Cable termination and torque test.

Cooling water system. ( installation / commissioning ) UPS system. ( installation / commissioning ) Air compressor system. ( installation / commissioning ) Fire alarm system. ( installation / commissioning ) HVAC system. ( installation / commissioning ) Lighting system. ( installation / commissioning ) Cathodic protection system. ( installation / commissioning ) Emergency generator system. ( installation / commissioning ) Firefighting system. ( installation / commissioning ) Installation for control panels ( installation / commissioning / ABB

coordination )

Period: Jan 2008 – Sept. 2010 Company: SSEMProject: SWCC Shoaiba WTS WTS Project Position: Site Electrical Engineer

Responsibility:

Lighting System: Planning site schedule, task schedule, leading with the engineer and

technicians.

Page 3: Site Manager - Mohamed Aly ElSharkawy

Installed and wired light fixtures in a new building such as looping, emergency, UPS and exit lights.

Installed new lights in a high-base hangar. Erection and wired the incomer for the lighting panels according to the lay

out drawings and wiring schematic. Commissioning for the system and testing for the CT (current transformer)

equipment using ISA T 100 device. Installation for street lighting poles up to energizing status.

Fire Alarm System: Bent and laid conduit pipes to put in a new fire alarm system. Installed and wired detectors like smoke, heat & flame (ultra violet)

detectors. Giving the accurate addressing for the detectors through the rotary

switches according to the guide drawings. Installation and wiring for the manual call point (M.C.P),FCM , FMM , ISO

and strope sounder modules. Installation for main frame control panel & cable termination for feeder

cables. Commissioning the system for checking the reliability and the performance

in case.

Fiber Optic Cable System: Laying cables for long distance or internally between buildings or panels. Splicing for the fiber cores using mechanical splicing or arc fusion splicing. Locating the fault location for any cutting in the fiber by using OTDR

instrument and re-splice it into splicing closure box.

Telephone System: Erection for local central inside the stations Weather proof telephone sets, desk, desk/wall erection & cable termination. PAPX panel installation and laying cables up to it and finalized the wiring

addressing termination inside the panel. Installation digital telephone sets for the building which feeding with

telephone junction box that having fiber optic cable (MM) feeding from server panels.

Fire fighting System: Installation for EMT pipes for cable pulling Fixing the modules and wiring devices which clearly approved from the

client 7&mentioned in the specification by following the AFC drawings. Installing the control panel & accomplished the wiring termination task.

Page 4: Site Manager - Mohamed Aly ElSharkawy

Finalizing the interface between the electrical & mechanical equipment to control the deluge valves by solenoids and to be monitor by pressure switching refereeing to the main control panel.

Dealing with FM200 SYSTEM ,Either water sprinkling SYSTEM. Finalize the system with commissioning & to be interfaced with the DCS.

Summary Of Skills And Abilities

1. Languages: Fluent English. (Reading, Writing, Speaking)

Fluent Arabic. (Reading, Writing, Speaking)

2. IT skills:

Microsoft Word.

Microsoft Excel.

Microsoft Access.

Microsoft Power Point

3. General:

Analytical & conceptual thinking. Problem solving & management. Leadership qualities. Interpersonal skills. Good communication skills. Ability to work unsupervised or in a team

environment. High performance under pressure.

Education

2002-2007 Arab Academy for Science and Technology.

Alexandria, Egypt.

I achieved a Bachelor degree in the Electronics and

Communications Engineering Department.

My GPA is 2.91 / 4 " very good"

I scored a 91% in my graduation project, “An Intelligent

Autonomous Vehicle.”

Page 5: Site Manager - Mohamed Aly ElSharkawy

Previous course

Sept 2007 New Horizons, Egypt Alexandria branch.

I attended the CCNA “Cisco Certified Network

Administration” course.

Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE.

I attended the CFOP “ Certified Fiber Optic Professional”

course.

Personal

Date of Birth: 01-10-1984

Gender: Male

Nationality: Egyptian

Military status: None

Contact Details:Al Jubail, KSA

966-501-923-386,Saudi [email protected]

References

A list of references is available on request