Upload
mohamed-elsharkawy
View
402
Download
2
Embed Size (px)
Citation preview
KEY PERSONNEL RESUME
Name: Mohamed Aly ElSharkawy Proposed Position: Site Manager
Discipline: Electronic & Communication Engineering
Minimum Qualification: BE Electronic & Communication
English Speaking Capability: Excellent
Career Objective
Seeking a position as a valued member that leverages my achievements, skills, energy and talent for identifying superior job candidates.
CAPABILITIES AND PERSONAL TRAITS
Work together with other engineers and working level staff to solve and define the developmental problems.
Provide technical assistance and solution to the team. Intelligence, Honesty, Professionalism. Innovation, Ingenuity, Dedication to work. Prompt decision-making. Meeting challenges keeping project on schedule & within budget. Team leader and a team player with motivational skills. Flexibility and adaptability. Able to work independently in the area of authority.
Work Experience:
Period: Jan 2015 –PresentCompany: SSEMProject: PS1 SWCC Ras-Al-Khair WTS Project Position: Station Manager
Monitoring and controlling remaining construction activities and taking corrective actions.
Implements systems to comply with Health & Safety Regulations and ensure accident free sites.
Take the work permits from SWCC, and coordination with Power Plant Contractor for Underground cables, MV System and other concern departments.
Arrange all Material, Equipment, Manpower etc Following up with supplier.
Following up for the closing of TOD punch list & walk through punch list. Following up with Head Office. Good communication skills with client SWCC/Consultant.
Period: Apr 2011 – Dec. 2014Company: SSEMProject: PS1 SWCC Ras-Al-Khair WTS Project Position: Senior Electrical Site Engineer
Responsibility:
MV/LV system (supervision / supplier coordination) MV Cable laying: Preparation of BOQ (review the cable route drawing, estimation of cable
length and required accessories ) Preparation of the cable trench as per the approved norms. Cable laying of MV cable (13.8kv, 1Cx 630 mm2, XLPE ) , preparation for
the requirement cable pulling machine , rollers & required manpower. Supervision for cable jointing as per the standard. Mugger test 5KV DC Hi-
pot test. Cable termination and torque test.
Cooling water system. ( installation / commissioning ) UPS system. ( installation / commissioning ) Air compressor system. ( installation / commissioning ) Fire alarm system. ( installation / commissioning ) HVAC system. ( installation / commissioning ) Lighting system. ( installation / commissioning ) Cathodic protection system. ( installation / commissioning ) Emergency generator system. ( installation / commissioning ) Firefighting system. ( installation / commissioning ) Installation for control panels ( installation / commissioning / ABB
coordination )
Period: Jan 2008 – Sept. 2010 Company: SSEMProject: SWCC Shoaiba WTS WTS Project Position: Site Electrical Engineer
Responsibility:
Lighting System: Planning site schedule, task schedule, leading with the engineer and
technicians.
Installed and wired light fixtures in a new building such as looping, emergency, UPS and exit lights.
Installed new lights in a high-base hangar. Erection and wired the incomer for the lighting panels according to the lay
out drawings and wiring schematic. Commissioning for the system and testing for the CT (current transformer)
equipment using ISA T 100 device. Installation for street lighting poles up to energizing status.
Fire Alarm System: Bent and laid conduit pipes to put in a new fire alarm system. Installed and wired detectors like smoke, heat & flame (ultra violet)
detectors. Giving the accurate addressing for the detectors through the rotary
switches according to the guide drawings. Installation and wiring for the manual call point (M.C.P),FCM , FMM , ISO
and strope sounder modules. Installation for main frame control panel & cable termination for feeder
cables. Commissioning the system for checking the reliability and the performance
in case.
Fiber Optic Cable System: Laying cables for long distance or internally between buildings or panels. Splicing for the fiber cores using mechanical splicing or arc fusion splicing. Locating the fault location for any cutting in the fiber by using OTDR
instrument and re-splice it into splicing closure box.
Telephone System: Erection for local central inside the stations Weather proof telephone sets, desk, desk/wall erection & cable termination. PAPX panel installation and laying cables up to it and finalized the wiring
addressing termination inside the panel. Installation digital telephone sets for the building which feeding with
telephone junction box that having fiber optic cable (MM) feeding from server panels.
Fire fighting System: Installation for EMT pipes for cable pulling Fixing the modules and wiring devices which clearly approved from the
client 7&mentioned in the specification by following the AFC drawings. Installing the control panel & accomplished the wiring termination task.
Finalizing the interface between the electrical & mechanical equipment to control the deluge valves by solenoids and to be monitor by pressure switching refereeing to the main control panel.
Dealing with FM200 SYSTEM ,Either water sprinkling SYSTEM. Finalize the system with commissioning & to be interfaced with the DCS.
Summary Of Skills And Abilities
1. Languages: Fluent English. (Reading, Writing, Speaking)
Fluent Arabic. (Reading, Writing, Speaking)
2. IT skills:
Microsoft Word.
Microsoft Excel.
Microsoft Access.
Microsoft Power Point
3. General:
Analytical & conceptual thinking. Problem solving & management. Leadership qualities. Interpersonal skills. Good communication skills. Ability to work unsupervised or in a team
environment. High performance under pressure.
Education
2002-2007 Arab Academy for Science and Technology.
Alexandria, Egypt.
I achieved a Bachelor degree in the Electronics and
Communications Engineering Department.
My GPA is 2.91 / 4 " very good"
I scored a 91% in my graduation project, “An Intelligent
Autonomous Vehicle.”
Previous course
Sept 2007 New Horizons, Egypt Alexandria branch.
I attended the CCNA “Cisco Certified Network
Administration” course.
Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE.
I attended the CFOP “ Certified Fiber Optic Professional”
course.
Personal
Date of Birth: 01-10-1984
Gender: Male
Nationality: Egyptian
Military status: None
Contact Details:Al Jubail, KSA
966-501-923-386,Saudi [email protected]
References
A list of references is available on request