34
Site Investigation – The Holistic Approach: A Case Study from Providing Ground Solutions Approach: A Case Study from Silvertown, London Sarah Key, CEnv MIEnvSc , Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Site Investigation – The Holistic Approach: A Case Study from

Providing Ground Solutions

Approach: A Case Study from Silvertown, London

Sarah Key, CEnv MIEnvSc , Principal EngineerNick Langdon, CEng FICE, Company Chairman

Page 2: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Introduction

Why a holistic approach?The developmentSite history and previous usageSite investigation 2013

cgl-uk.com 2

Site investigation 2013Remediation outcomesGeotechnical outcomesThe site today

Page 3: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Why a holistic approach?

A balancing act

The constraints• The professional team diktats • Client preferences

cgl-uk.com 3

• Client preferences

The drivers• Reduced disruption• Coordination of design thinking• Cost reduction

Page 4: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The site

38-acre site£1b+ to create 3300+ new homes, infrastructure, commercial and amenity facilities

Silvertown, London

cgl-uk.com 4

20,000m² of commercial space is to create around 20,000 jobsA new economic centre east of Canary Wharf, minutes from London City Airport and CrossrailCompleting 2019/20Silvertown Quays….starting 2018

Page 5: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Development summary

Silvertown, London

Oxley Holdings Limited A Singapore based developer

cgl-uk.com 5

Ballymore Properties Limited Founded in Ireland in 1982

Minoco Wharf + Crescent Wharf + Venesta Wharfs

Page 6: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary

1799: Marshland

Over 200 years of history

cgl-uk.com 6

Page 7: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary

1894: Industrial development

Over 200 years of history

cgl-uk.com 7

Page 8: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Goad Plans

cgl-uk.com 8

Page 9: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

London’s Biggest Explosion

Friday, 19 January 1917 at 6.52 pm.Approximately 50 tons of TNT exploded.73 people killed and 400 injured.Debris was strewn for miles

cgl-uk.com 9

Debris was strewn for miles around damaging a gasholder on Greenwich peninsularBlew windows in the Savoy Hotel and almost overturned a taxi in Pall Mall.The fires could be seen in Maidstone and GuildfordThe blast was heard up to 100 miles (160 km) away

Page 10: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary

Rebuilt in the 1920’s

cgl-uk.com 10

Page 11: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary1940-41

cgl-uk.com 11

Page 12: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary

Post-war: Industrial evolution

cgl-uk.com 12

evolution

Page 13: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Historical summary

1999-2004Partial demolition and remediation for industrial re-use

cgl-uk.com 13

Page 14: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Additional investigation required for 2012 consented schemeGeoenvironmental - large number of remaining

The Holistic Approach

cgl-uk.com 14

Geoenvironmental - large number of remaining sources needed investigationGeotechnical – limited site wide data for detailed designCombined investigation to provide comprehensive solution

Page 15: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Expected Geology

Made GroundAlluvium (including Peat layers)

London Basin sequence

cgl-uk.com 15

River Gravel DepositsLambeth GroupThanet SandsChalk at depth

Page 16: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

31 cable percussion boreholes • 15m or 28mbgl with in-situ testing and sampling• Gas and groundwater monitoring installations (some dual)

Scope of Works

cgl-uk.com 16

• Gas and groundwater monitoring installations (some dual)

157 window sampler boreholes• Maximum depth of 5mbgl• 56 monitoring installations

30 trial pits

Page 17: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Minoco WharfVenesta Wharf Crescent

Wharf

cgl-uk.com 17

Page 18: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Not a bad place to be…

cgl-uk.com 18

Page 19: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Dye WasteFree product

Encountered Contamination

cgl-uk.com 19

Page 20: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

River Wall

cgl-uk.com 20

Page 21: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Concrete

cgl-uk.com 21

Page 22: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Testing

SPTsGeotechnical testing

cgl-uk.com 22

• PSDs / sedimentation• Atterberg Limits• Moisture Content• Quick undrained triaxials• Sulphate and pH

Contamination testing• Standard soil suites• Asbestos screen/ID• Leachate suites• Groundwater analysis

Page 23: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Site Investigation

Monitoring

Ground gas/vapourGroundwater levels

cgl-uk.com 23

Groundwater samplingTidal monitoring

Page 24: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

Geological Cross-Section

cgl-uk.com 24

Page 25: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

Perched groundwater in Made Ground Shallow groundwater in KPG

Groundwater

cgl-uk.com 25

• In continuity with the River Thames

Deep groundwater • Under sub-artesian pressure

Tidal Variation

Page 26: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

Human health assessmentGround gas assessment• Range of Characteristic Situations (1 to 5) across the site

Contamination Assessment

cgl-uk.com 26

• Range of Characteristic Situations (1 to 5) across the site but generally, CS2

Groundwater assessment• soil contaminants leachable• underlying groundwater bodies affected

DQRA

Page 27: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Conceptual Site Model

cgl-uk.com 27

Page 28: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

Basement excavations proposed = mitigated majority of risks from soil sources Proposed permeable reactive barriers along River

Remediation Recommendations

cgl-uk.com 28

Proposed permeable reactive barriers along River edge and northern boundaryGround gas protection measures (vent layer, membrane and vent trench)Barrier layers in gardens and communal landscaping

Page 29: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

Geotechnical Assessment

cgl-uk.com 29

Shallow foundations for lightest structuresPiled foundations in to Kempton Park Gravel and Thanet Sands

Page 30: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Geotechnical outcomes

cgl-uk.com 30

Page 31: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

The Outcomes

cgl-uk.com 31

Page 32: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Situation

Construction and remediationNew River wall

cgl-uk.com 32Pump and treat Soil stabilisationBiopiles

E-Clay barrier wall

Page 33: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Current Situation

Construction and remediation

3.6%11%

10%

cgl-uk.com 33

16%

Page 34: Site Investigation –The Holistic Approach: A Case Study from …€¦ · Silvertown, London Sarah Key, CEnvMIEnvSc, Principal Engineer Nick Langdon, CEng FICE, Company Chairman

Thank You – Any Questions?

cgl-uk.com 34