    TELKOMSEL

    MICROWAVE FLEXIHOPPERDOCUMENTATION

    Chapter 5

    SITE ID IND031

    SUKRAWETAN

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 1(14)

  • 8/2/2019 Site Folder5

    2/14

    5.TRS INSTALLATION & COMMISSIONING

    5.1. FLEXIHOPPER RADIO

    5.1.2. FlexiHopper Installation

    5.1.2.1. Method of Installation (Indoor Unit)19 Transmission rack (FIU 19) MetroSite BTS Integrated (FXC/RRI)

    Site Support Cabinet (FIU 19) Metrohub Integrated (FXC/RRI)

    UltraSite BTS Integrated (FXC/RRI) Flexitalk BTS Integrated (RRIC)

    5.1.2.2. Method of Installation (Outdoor Unit)

    Roof mounting Wall mounting

    Tower installation Pole installation

    5.1.2.3. Method of Installation (Antenna)Integrated Separated

    Tower installation Pole installation

    5.1.3. Indoor Unit Installation Checklist

    Phase CompletedGeneral Appearance of IU

    IU cables correctly marked and connected to the IU

    Grounding of IU

    Power cable connected to IU

    Cables arranged and secured to cable tray

    2 Mbit/s attached to DDF/BTS

    Q1 cable connected

    5.1.4. OU-Installation Checklist

    INSTALLATION ITEM CHECKED Completed

    General Appearance of Outdoor Unit

    OU Cables correctly marked and connected to OU

    OU Link Address clearly marked

    All external connectors and cables checked for correct sealing

    Grounding of Outdoor Unit

    Grounding of IU-OU Cables if required

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 2(14)

  • 8/2/2019 Site Folder5

    3/14

  • 8/2/2019 Site Folder5

    4/14

  • 8/2/2019 Site Folder5

    5/14

    5.3 SITE INVENTORY

    5.3.1 Changes to the Site Inventory

    Record all differences and replacements in the following table:-

    NEW UNIT OLD UNIT NOKIA FaultReport No:

    Name /Version

    Serial Number Name /Version

    Serial Number

    Notes on Inventory Lists

    CHECKED BY

    NAME:_________________________SIGNED:___________________DATE:____/____/____(Installation Teamleader)

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 5(14)

  • 8/2/2019 Site Folder5

    6/14

    Site Acceptance Certificate

    This is to certify that the nominated equipment has been accepted at the following site:

    Site Name: SUKRAWETAN

    Site Number: IND031

    (Microwave 1) (Microwave2)

    Note: Please tick () which one is applicable.

    ON BEHALF OF:

    PT. TELKOMSEL :

    By (Name):

    Signature:

    Date: ___ / ___ / ____

    P.T. NOKIA SIEMENS NETWORKS INDONESIA :

    By (Name):

    Signature:

    Date: ___ / ___ / ____

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 6(14)

  • 8/2/2019 Site Folder5

    7/14

    List of Outstanding Tasks

    Item Description of Outstanding Work Raised by Completed by

    Sign. Sign.

    1 Name Name

    Date Date

    Sign. Sign.

    2 Name Name

    Date Date

    Sign. Sign.

    3 Name Name

    Date Date

    Sign. Sign.

    4 Name Name

    Date Date

    Sign. Sign.

    5 Name Name

    Date Date

    Sign. Sign.

    6 Name Name

    Date Date

    Sign. Sign.

    7 Name Name

    Date Date

    Sign. Sign.

    8 Name NameDate Date

    Sign. Sign.

    9 Name Name

    Date Date

    Sign. Sign.

    10 Name Name

    Date Date

    Sign. Sign.

    11 Name Name

    Date Date

    Sign. Sign.

    12 Name Name

    Date Date

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 7(14)

  • 8/2/2019 Site Folder5

    8/14

    TELKOMSEL

    MICROWAVE FLEXIHOPPERDOCUMENTATION

    Chapter 5

    SITE ID CRB402

    ANJATAN(Far End)

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 8(14)

  • 8/2/2019 Site Folder5

    9/14

    5.TRS INSTALLATION & COMMISSIONING

    5.2. FLEXIHOPPER RADIO5.2.2. FlexiHopper Installation

    5.1.2.1. Method of Installation (Indoor Unit)19 Transmission rack (FIU 19) MetroSite BTS Integrated (FXC/RRI)

    Site Support Cabinet (FIU 19) Metrohub Integrated (FXC/RRI)

    UltraSite BTS Integrated (FXC/RRI) Flexitalk BTS Integrated (RRIC)

    5.1.2.2. Method of Installation (Outdoor Unit)Roof mounting Wall mounting

    Tower installation Pole installation

    5.1.2.3. Method of Installation (Antenna)Integrated Separated

    Tower installation Pole installation

    5.2.3. Indoor Unit Installation Checklist

    Phase Completed

    General Appearance of IU

    IU cables correctly marked and connected to the IUGrounding of IU

    Power cable connected to IU

    Cables arranged and secured to cable tray

    2 Mbit/s attached to DDF/BTS

    Q1 cable connected

    5.2.4. OU-Installation Checklist

    INSTALLATION ITEM CHECKED Completed

    General Appearance of Outdoor Unit

    OU Cables correctly marked and connected to OU

    OU Link Address clearly marked

    All external connectors and cables checked for correct sealing

    Grounding of Outdoor Unit

    Grounding of IU-OU Cables if required

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 9(14)

  • 8/2/2019 Site Folder5

    10/14

    5.1.3. FlexiHopper Data

    All grey shaded filled have to be completed !!

    Site A Site B

    CRB402 IND031

    ANJATAN SUKRAWETAN

    107.956 Latitude: 107.9475

    -6.3471 Longitude: -6.3076

    Commissioning file:ANJATAN TO SUKRAWETAN.NOD

    Station type: INDOOR UNIT Station type:

    Terminal

    Chaining

    Branching

    Terminal

    Chaining

    Branching

    Protection equipment: Protection equipment:

    Single

    1IU+2OU Protected

    2IU+2OU Protected

    Single

    1IU+2OU Protected

    2IU+2OU Protected

    Protection method: Protection method:

    HSB

    Frequency diversity

    Polarisation diversity

    HSB+Space diversity

    HSB

    Frequency diversity

    Polarisation diversity

    HSB+Space diversity

    Flexibus in use: Flexibus in use:

    FB1 to SUKRAWETAN .

    FB2 to .

    FB3 to .FB4 to .

    FB1 to ANJATAN .

    FB2 to .

    FB3 to .FB4 to .

    Identifications

    Equipment NameGroup NameSite NameSite Location

    ANJATAN TO SUKRAWETAN

    TELKOMSEL .

    ANJATAN.

    DUSUN KARANG MALANG RT 01 RW 01, DESA ANJATAN

    BARU, KEC. ANJATAN, KAB. INDRAMAYU.

    Q1 Port Settings:

    Q1 AddressQ1 Group AddressQ1 Baud Rate

    LMP Baud Rate

    2 (03999)

    4050 (40504059)

    4800 bit/s 9600 bit/s 19200 bit/s

    9600 bit/s 19200 bit/s 115200 bit/s

    Q1 Branching Bridge:

    Q1-1, Q1-2Q1-1Q1-2ProcessorFlexbusFB 1FB2FB3

    On OffOn OfOn OffOn OffOn OffOn OffOn OffOn Off

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 10(14)

  • 8/2/2019 Site Folder5

    11/14

    OUTDOOR UNIT

    Azimuth:

    deg

    Diameter

    m

    Frequency Band

    38 GHz

    26 GHz23 GHz

    13 GHz

    7 GHz

    Polarisation

    V H

    Hop length :

    Azimuth:

    deg

    Diameter

    m

    RG223

    RG214Cable type

    RG223

    RG214

    m Cable length m

    Deg. Antenna bearing Deg.m Antenna height m

    Unit settings:

    12961000kHz Transmit frequency 13227000kHz

    13227000kHz Receiving frequency 12961000kHz

    -40dBm Calculated input power -40dBm

    dBm Input power dBm

    14dBm Transmit power 14dBm

    40dB Fade Margin 40dB

    CapacityALCQInterleaving status

    2 x2 4 x 2 8 x2 16 x 2

    On Off

    Off Depth 2 Depth 4

    5.3. ENCLOSED SHEETS

    Enclosed Path Calculation sheet (Appendix number )Enclosed BER test result sheet (Appendix number )Enclosed 2Mbit/s cross-connection sheet (Appendix number )Enclosed Configuration sheet (Appendix number )Enclosed Statistic result sheet (Appendix number )Enclosed Counter result sheet (Appendix number )

    5.3. TESTS

    Phase Completed

    RX level equivalent to link plan (+/- 3 dBm)

    BER measurement complete

    Counters and statistics reset

    Unexpected alarm check

    CARRIED OUT BY

    NAME:__________________________SIGNED:____________________DATE:___/___/____

    (Installation Teamleader)

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 11(14)

  • 8/2/2019 Site Folder5

    12/14

    5.3 SITE INVENTORY5.3.1 Changes to the Site Inventory

    Record all differences and replacements in the following table:-

    NEW UNIT OLD UNIT NOKIA FaultReport No:

    Name /Version

    Serial Number Name /Version

    Serial Number

    Notes on Inventory Lists

    CHECKED BY

    NAME:_________________________SIGNED:___________________DATE:____/____/____

    (Installation Teamleader)

    NTC BSBI 3118.8000/1.0 en BTS SSD Copyright Nokia Telecommunications SEAP 12(14)

  • 8/2/2019 Site Folder5

    13/14

  • 8/2/2019 Site Folder5

    14/14

    List of Outstanding Tasks

    Item Description of Outstanding Work Raised by Completed by

    Sign. Sign.

    1 Name Name

    Date Date

    Sign. Sign.

    2 Name Name

    Date Date

    Sign. Sign.

    3 Name Name

    Date Date

    Sign. Sign.

    4 Name Name

    Date Date

    Sign. Sign.

    5 Name Name

    Date Date

    Sign. Sign.

    6 Name Name

    Date Date

    Sign. Sign.

    7 Name Name

    Date Date

    Sign. Sign.

    8 Name NameDate Date

    Sign. Sign.

    9 Name Name

    Date Date

    Sign. Sign.

    10 Name Name

    Date Date

    Sign. Sign.

    11 Name Name

    Date Date

    Sign. Sign.

    12 Name Name

    Date Date

    NTC BSBI 3118 8000/1 0 en BTS SSD Copyright Nokia Telecommunications SEAP 14(14)