proprietary & confidential Site Evaluation and Design Challenges of MS4/TMDL Restoration Projects in the Urban Environment of Baltimore City 2018 National Capital Region Water Resources Symposium April 6, 2018

Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation and Design Challenges of MS4/TMDL Restoration Projects in the Urban Environment of Baltimore City

2018 National Capital Region

Water Resources Symposium

April 6, 2018

Page 2: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

1. City of Baltimore (COB) Municipal Separate Storm Sewer System (MS4) and Total Maximum Daily Load (TMDL) Restoration Background Information

2. Goals of TMDL/MS4 Restoration Project

3. Stormwater Management (SWM) best management practices (BMPs)

4. Site Evaluation and Analysis Approach

5. Challenges for TMDL/MS4 Restoration in Urban Settings

6. Other factors to be considered for using MDE State Revolving Fund (SRF)

Presentation Outline

Page 3: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢National Pollutant Discharge Elimination System (NPDES) MS4 permit reissued December 27, 2013

➢5 year permit covering all stormwater discharges from the MS4 owned and operated by Baltimore City

➢Permit requires 20% restoration of the impervious surface area within Baltimore City limits

➢20% restoration = 4,291 acres

➢Watershed Implementation Plan (WIP) details strategies for meeting restoration requirements

Baltimore City MS4 Restoration Requirements

Page 4: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Structural/Traditional BMPs• Stormwater Pond Retrofits• New Wetlands / Stormwater Ponds• Bioretention (large scale)

➢Environmental Site Designs (ESD) Practices• Micro-bioretention• Rain Gardens• Green Roofs• Enhanced Filters• Permeable Paving

➢Alternative BMPs• Stream Restoration • Impervious Area Removal• Reforestation / Afforestation• Lot Greening• Programs (Street Sweeping, Catch Basin Cleaning,

Public Education, Enforcement, Partnerships, etc.)

MS4 Restoration Project Types within the City

Page 5: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Project Description

➢Straughan Environmental, Inc. (Straughan) was retained by COB Department of Public Works (DPW) in 2016

➢Engineering design for up to 52 BMPs

➢Total project area of 7,695 acres spanning 3 watersheds, 10 MS4 WIP project areas, and 30 neighborhoods

MS4/TMDL Restoration ER-4130 Project

Page 6: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Project Tasks

➢ Data collection

➢ Desktop analysis

➢ Field investigation

➢ Topographic survey

➢ Utility designation

➢ Geotechnical survey

➢ 30% concept designs

➢ 60% semi-final designs

➢ 90% final designs

➢ 100% Plans

➢ Specifications and Estimate (PS&E) designs

➢ Pre-construction award services

➢ Post award services

MS4/TMDL Restoration ER-4130 Project

Additional Reports, Permits and Approvals

➢ Primary Engineering Report (PER) for Maryland Department of the Environment (MDE) State Revolving Fund (SRF)

➢ Grading permits

➢ SWM/ESC permits

➢ Roadside tree permits,

➢ Wetland/waterway permits

➢ Forest conservation permits

➢ Critical area commission (CAC) permits,

➢ Floodplains permits

➢ Baltimore City Commission for Historical and Architectural Preservation (CHAP) review and approval

Page 7: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

MS4/TMDL SWM Best Management Practices (BMPs)

Tier I (upland nonstructural) Tier II (upland structural) Tier III (outfall and in-stream measures)

• Rooftop and non-rooftop disconnections• Tree planting areas• Removing curb and gutter or pavement

areas• Utilizing sheetflow to conservation areas

• Infiltration berms/trenches• Bioretention• Bioswales• Rain gardens• Stormwater retrofit

• Outfall rehabilitation• End of pipe retrofit• Offline pond retrofit or new ponds• Energy dissipaters• Bank and in-stream stabilization

measures

Page 8: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Project Goals

➢ Identify and prioritize cost-effective (capital and maintenance cost) BMPs to treat urban runoff and meet MS4/TMDL requirements

➢Meet or exceed the treatment goal with least, most cost-effective BMPs

➢Provide public education and participation

➢ Improve public safety

MS4/TMDL Restoration ER-4130 Project

Page 9: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PROVIDE FINAL SITE SELECTION RECOMMENDATION

INCORPORATE STAKEHOLDER FEEDBACK

PROVIDE SITE INITIAL SELECTION RECOMMENDATION

PERFORM FIELD VISITS

PERFORM DESKTOP ANALYSIS

IDENTIFY ADDITIONAL BMP OPPORTUNITY SITES

GATHER & REVIEW BACKGROUND INFORMATION

OBTAIN BMP OPPORTUNITY SITE LIST FROM CITYSTEP 1

STEP 2

STEP 3

STEP 4

STEP 5

STEP 6

STEP 7

STEP 8

REFINE DESKTOP ANALYSIS RESULTS WITH FIELD DATA

UPDATED SITE SELECTION GIVEN FEEDBACK

Page 10: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

OBTAIN BMP OPPORTUNITY SITE LIST FROM CITYSTEP 1

Page 11: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

GATHER & REVIEW BACKGROUND INFORMATIONSTEP 2

➢ Geographic data• Topography• Neighborhood boundaries• Land use• Historical areas• Parcels, ROW• Buildings• Streets, alleys, bike paths, trails, etc.

➢ Utility data• Water lines, sewer lines, storm drains• Gas lines• Power transmission lines, street light

cables• Telephone lines, cable lines, fiber optic

lines

• As-builts

➢ Environmental feature data• Water features, waterways, wetlands,

floodplains• Existing trees and forest areas• Critical areas, etc.

➢ Design criteria• State of Maryland• City of Baltimore• Stakeholders• Urban ESD design guidance from other

jurisdictions for reference➢ Studies

• Watershed Implementation Plan• Direct Harbor Water Characterization

Report• Small Watershed Action Plans• Neighborhood Master Plans

Page 12: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

IDENTIFY ADDITIONAL BMP OPPORTUNITY SITESSTEP 3

Page 13: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PERFORM DESKTOP ANALYSISSTEP 4

➢Evaluate opportunity sites for BMP feasibility (BMP prioritization process)

➢Generate proposed BMP footprint and estimate provided Equivalent Impervious Area Restored (EIAR)

➢Develop planning level life cycle cost (LCC) estimates

➢Perform two-step site ranking analysis of alternatives, first prioritizing sites by feasibility and then prioritizing the most feasible sites based on cost-effectiveness (LCC/EIAR)

Page 14: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

BMP Prioritization Process

1

10

NO DIRECT IMPACT ON BMP FEASABILITY

IRRECONCILABLE BMP FEASABILITY CONFLICT

CONSTRAINT WEIGHTING SCALE

234

56789

MODERATE IMPACT ON BMP FEASABILITY

5

1

NO SITE CONSTRAINT ISSUE

MAJOR SITE CONSTRAINT ISSUE

SITE SCORING SCALE

4

3

2

MODERATE SITE CONSTRAINT ISSUE

➢ BMP feasibility prioritized using weighted site scoring matrix

➢ Constraints assigned weight based on importance

➢ Sites assigned constraint scores through desktop evaluation

Page 15: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

BMP Prioritization Process

WEIGHTED SITE SCORE

0

5

REJECTED: SCORE OF “1” FOR “10” WEIGHTED CONSTRAINT

MOST FEASIBLE BMP SITE

2

3

4

1HOLD: MISSING DATA OR STAKEHOLDER FEEDBACK

𝑊𝐸𝐼𝐺𝐻𝑇𝐸𝐷 𝑆𝐼𝑇𝐸 𝑆𝐶𝑂𝑅𝐸 =𝑆𝑈𝑀𝐴𝐿𝐿 [ 𝐶𝑂𝑁𝑆𝑇𝑅𝐴𝐼𝑁𝑇 𝑊𝐸𝐼𝐺𝐻𝑇 𝑥 𝐶𝑂𝑁𝑆𝑇𝑅𝐴𝐼𝑁𝑇 𝑆𝐶𝑂𝑅𝐸 ]

𝑆𝑈𝑀𝐴𝐿𝐿 [𝐶𝑂𝑁𝑆𝑇𝑅𝐴𝐼𝑁𝑇 𝑊𝐸𝐼𝐺𝐻𝑇]

LESS FEASIBLE BMP SITE

➢ Weighted site constraint score calculated to quantify BMP feasibilityand prioritize site selection

Page 16: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Utilities

➢Environmental Features

➢Roadway Constraints

➢Site Location

➢Land Owner Approval

➢Drainage Area

➢Tier I/Tier III Opportunities

➢Existing BMP Conflicts

Site Constraints

Page 17: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Most ESD BMP types not feasible in urban environment when restricted to publicly owned land /right-of-way➢ Green roof

➢ Permeable pavement

➢ Rooftop/non-rooftop disconnection

➢ Rainwater harvesting

➢ Submerged gravel wetland

➢ Landscape infiltration

➢ Dry wells

➢Feasible ESD opportunities typically located within right-of-way➢ Impervious removal (City owned vacant land)

➢ Tree planting (City owned open space)

➢ Micro-bioretention

➢ Bioswales

ESD Constraints

Page 18: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PERFORM DESKTOP ANALYSISSTEP 4

➢Evaluate opportunity sites for BMP feasibility (BMP prioritization process)

➢Generate proposed BMP footprint and estimate provided Equivalent Impervious Area Restored (EIAR)

➢Develop planning level life cycle cost (LCC) estimates

➢Perform two-step site ranking analysis of alternatives, first prioritizing sites by feasibility and then prioritizing the most feasible sites based on cost-effectiveness (LCC/EIAR)

Page 19: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PERFORM FIELD VISITSSTEP 5

Page 20: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PROVIDE SITE INITIAL SELECTION RECOMMENDATIONSTEP 6

Page 21: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

INCORPORATE STAKEHOLDER FEEDBACKSTEP 7

Jurisdiction Agency*Selected Approved Not Approved Pending

Tier 1 Tier 2 Tier 1 Tier 2 Tier 1 Tier 2 Tier 1 Tier 2

DOT 5 23 0 21 0 0 5 2

BCRP 3 9 0 0 3 9 0 0

DHCD 0 0 0 0 0 0 0 0

PABC 0 4 0 4 0 0 0 0

HABC 7 0 0 0 0 0 7 0

Total** 15 35 0 25 3 9 12 2

Total** 50 25 12 14

*Jurisdiction agency identified by SEI during desktop analysis.

Page 22: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Site Evaluation Approach

PROVIDE FINAL SITE SELECTION RECOMMENDATIONSTEP 8

Jurisdiction Agency*Selected Approved Not Approved Pending

Tier 1 Tier 2 Tier 1 Tier 2 Tier 1 Tier 2 Tier 1 Tier 2

DOT 4 31 4 31 0 0 0 0

BCRP 0 2 0 2 0 0 0 0

DHCD 8 0 8 0 0 0 0 0

PABC 0 4 0 4 0 0 0 0

HABC 3 0 3 0 0 0 0 0

Total** 15 37 15 37 0 0 0 0

Total** 52 52 0 0

*Jurisdiction agency identified by SEI during desktop analysis.

Page 23: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Challenges➢Site Constraints

➢Design Standards

➢Public Outreach

➢Stakeholders

➢Costs

➢Permitting

➢Project Schedule

Challenges for TMDL/MS4 Restoration in Urban Settings

Page 24: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Site Constraints• Utility conflicts

• Sensitive environmental features

• Narrow streets

• Steep slopes

• Lack of available space

• Lack of supporting stormwater infrastructure

• Conflicts with building frontages

• Conflicts with parking spaces

• Conflicts with bus stops

• Illicit dumping locations

• Property ownership

• Excessive drainage areas

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Page 25: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Design Standards

• Design standard details

• Design plan templates for MS4/TMDL restoration projects

• Design specification templates for MS4/TMDL restoration projects

• MDE State Revolving Fund (SRF) requirements• First large scale urban ESD project in MD to use SRF

• MDE NOI application

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Page 26: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Public Outreach• Public outreach for planning level

• Public outreach at design phases

• Public outreach during construction

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Page 27: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Stakeholders• Department of Public Works (DPW)

• Department of Transportation (DOT)

• Department of Recreation & Parks (BCRP)

• Department of Planning (BCDP)

• Parking Authority (PABC)

• Department of Housing and Community Development (DHCD)

• Housing Authority of Baltimore (HABC)

• Contract Administration (CA)

• DPW’s Office of Compliance and Laboratories (OCAL)

• Community Organizations

• Maryland Department of the Environment (MDE)

• Utility Companies, BGE, Verizon, Comcast, Veolia

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Page 28: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Costs

• High construction costs

• High O&M costs

• Low cost effectiveness

➢Permitting

• Permitting for boring and utility designation

• Permitting for construction

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Cost

Cost

Cost

Page 29: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Project Schedule

• Initiate project in November 2016

• Complete all designs by October 2017

• Start construction in March 2018

• Finish construction in November 2018

Challenges for TMDL/MS4 Restoration in Urban Settings(Con’t)

Page 30: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

➢Preliminary Engineering Report Challenges• First urban ESD restoration project in MD to require PER for SRF

• Alternative Analysis for over 200 sites

• Selection of an Alternative based on

▪ Life Cycle Cost Analysis

▪ Non- Monetary Factors

MDE State Revolving Fund (SRF) Requirements

Page 31: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Contact information:

John Shen, Ph.D., PE, LEED AP BD+CEmail: [email protected]

Michael Blose, PE, MBAEmail: [email protected]

Andrew Sankowski, EITEmail: [email protected]

Page 32: Site Evaluation and Design Challenges of MS4/TMDL ... · Environmental feature data • Water features, waterways, wetlands, floodplains • Existing trees and forest areas • Critical

proprietary & confidential

Questions?