8/2/2019 Site Control Report From
1/7
admixture %
No.1 No.5 No.9
No.2 No.6 No.10
No.3 No.7 No.11
No.4 No.8 No.12
Description Date Number
1
2
3
1
2
3
1
23
1
2
3
%
Slump and flow test
Condition of Fresh Concrete
Strength (N/)
Supplier
Quantity of
poured concrete()
Location
Concrete Test Report on Site
LOTTE CENTER HANOI
No.
Concrete Placing Date
Page
Moisture Ratio of
fine arregateAggregate
Condition of
coarse arregate
Specification
Attachment
-.Compressive Strength test result
of authorized organization
Compressive strength test
7-day
28-day
Remark.
Photo
I.B.S.T
3-day
14-day
Checking
Supplier Site Manager
RemarksAverage (N/)
8/2/2019 Site Control Report From
2/7
Invoice
No.
Conc. Q
(m3)
Comc.Temp
(max. 32)
Air
(20.5%Mold
No.Remark
1 6 1
22 132 2
35 210 3
50 300 4
Remark I.B.S.T
Checking
Supplier Site manager
Min.
Min.
Min.
Concrete Test Sheet of Site( ZONE, SECTOR)
Conc Flow
(50075mmStrength
DaysMake a Mold
Min.
8/2/2019 Site Control Report From
3/7
Checking
Site Manager I.B.S.T
ETC
Whether adding water to shout of mixer truck?
Remarks
Checking the blend ratio of sand? Yes . No
According to request of the site, Whether keep the
departure time of mixer truck or not?Yes . No
Checking the size of aggregate? Yes . No
Yes . No
Sand
Aggregate
Admixture
Checking PointProduced place
Type
Checking the absorption ratio of sand? Yes . No
Checking the aggregate abrasion? Yes . No
Checking the keeping condition of admixture tank? Yes . N o
Cement Checking the kinds of cement on the invoice? Yes . No
Whether sand includes aggregate or not? Yes . No
Description
Checking the specific gravity of admixture? Yes . No
Remarks
Checking the agitation condition of admixture? Yes . No
Designed
mix design
Quality management Report
Checking the material
Supplier : date/Time
AD Remarks
Actual
mix design
W/C S/A W C G SDescription
8/2/2019 Site Control Report From
4/7
DATE Delivery Time
Fresh Concrete
Whether there is impurities in the concrete or not? Yes . No
Checking the mixing condition of concrete?
Cylinder
Management
Others
Whether assign concerned quality manager on the site or not?
Whether mold is modified or damaged
after removal of cylinder specimens?
whether mold is kept in the water tank
after removal of cylinder specimens?
Whether concrete meet the required specification?
Checking crack and damage of the mold
when delivery the mold?
Yes . No
* Picture of Slump Test (More than 2 time)
* Picture of Cleaning Condition of mold
Yes . No
Remarks
Attachment
Yes . No
Yes . No
Yes . No
Checking keeping condition of mold after production? Yes . No
Checking compacting condition of the mold?
Site Management Log
Description Remarks
Checking water added to shute of mixer truck,
when mixer truck arrive on the site?
Content Result
Checking the depreciation of cylinder specimens? Yes . No
Yes . No
Yes . No
Yes . No
Checking the cleaning condition of cylinder specimens?
Checking the slump or flow test?
Yes . No
Yes . No
Checking
I.B.S.TSite ManagerSupplier
8/2/2019 Site Control Report From
5/7
8/2/2019 Site Control Report From
6/7
8/2/2019 Site Control Report From
7/7
Page
Location
Description
P H O T O
Description
Location
Date
Date
Remark.
Checking
Supplier Site manager I.B.S.T