49
SCIENTIFICALLY CLOSED SUMP OF 1,50,000LITRES CAPACITY S.NO. 120 S.NO. 126 7.23 7.22 7.24 7.31 7.34 7.20 7.30 7.22 7.25 7.34 7.23 7.19 7.22 7.19 7.21 7.20 7.22 7.20 7.24 7.23 7.20 7.20 7.21 7.22 7.20 7.28 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 7.41 7.47 7.50 7.25 7.29 7.32 7.34 7.30 7.28 8' 6.00 BLOCK A TWO WHEELER PARKING REQUIRED CAR PARKING REQUIRED CAR PARKING PROVIDED 1 TYPE SL.NO. 48 75 NIL 9 BLOCK B 2 48 45 8 20 BLOCK C 3 BLOCK D 4 36 4 22 BLOCK E- EWS 5 BLOCK F 6 BLOCK G 7 4 20 20 14 40 29 4 22 48 53 NIL 10 4 64 28 16 IN STILT FLR. GRAND TOTAL 251 302 70 114 REQUIRED PROVIDED REQUIRED PROVIDED PARKING STATEMENT RISE 0.157 TREAD 0.25 R.C.C SLAB STAIRCASE DETAIL HAND RAIL 0.91M Ht BORE WELL SAND 1.5M 1.0M BLOCK A NO.OF FLATS 1 TYPE SL.NO. 48 BLOCK B 2 48 BLOCK C 3 BLOCK D 4 40 BLOCK E 5 BLOCK F 6 BLOCK G 7 24 44 48 32 TOTAL NO. OF FLATS 53/ EWS- BUILT UP AREA REQUIRED 1802.1 2103.40 FSI AREA OF BLOCK A TO G COVERAGE AREA OF BLOCK A TO G COVERAGE AREA 5031.35/12040 =20125.38 = 5031.35 = 41.78 % FSI COVERAGE FSI ALLOWED @ 12040x1.8 21672 53/ OSR REQUIRED OF MINIMUM SITE AREA 1204.00 OSR PROVIDED 53/ DOCUMENT SITE AREA 119/16B SITE AREA EWS 20125.38-2103.4=18021.98X10% EWS- BUILT UP AREA PROVIDED SITE AREA 53/ 604.08 CLUB HOUSE AREA % 871.34 738.13 1ST FLR 2ND FLR 3RD FLR 2952.52 3320.92 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 830.23 FSI AREA FLAT AREA 36.91 147.64 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.80 (-) (-) 4507.26 DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL 49.33 49.33 923.24 798.49 673.61 1ST FLR 2ND FLR 3RD FLR 2694.44 3042.40 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 760.61 FSI AREA FLAT AREA 33.68 134.72 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.80 (-) (-) 4159.53 DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL BLOCK B 47.36 47.36 870.85 776.26 658.60 1ST FLR 2ND FLR 3RD FLR 2634.32 2956.40 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 739.13 FSI AREA FLAT AREA 32.93 131.72 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.8 (-) (-) 4067.29 DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL 45.99 45.99 870.35 724.71 615.70 1ST FLR 2ND FLR 3RD FLR 2462.80 2758.88 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 689.72 FSI AREA FLAT AREA 30.79 123.16 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.80 (-) (-) 3744.17 DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL 39.83 39.83 765.67 BLOCK D 641.01 547.38 1ST FLR 2ND FLR 3RD FLR 2189.52 2463.68 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 625.85 FSI AREA FLAT AREA 21.00 84.00 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.8 (-) (-) 3498.94 DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL BLOCK E - EWS 41.96 41.96 810.44 712.93 620.14 1ST FLR 2ND FLR 3RD FLR 2480.56 2710.88 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.2 AREA FOR BALCONY 677.72 FSI AREA FLAT AREA 31.01 124.03 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.8 (-) (-) 3672.43 FSI AREA NON DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL BLOCK F 30.33 30.33 760.05 587.28 501.58 1ST FLR 2ND FLR 3RD FLR 2006.32 2232.00 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 4TH FLR 4.20 AREA FOR BALCONY 558.00 FSI AREA FLAT AREA 25.08 100.32 BUILDING AREA (DEDUCTIONS) (DEDUCTIONS) 16.8 (-) (-) 3085.88 FSI AREA NON DESCRIPTION STILT FLR NON FSI- 5% OF FLAT LIFT WELL 29.21 29.21 678.34 TOTAL 8 228 302 64 114 VISITOR'S PARKING 23 EWS TOTAL 12Y-150C/C 10Y-150 C/C 8Y-4L-150 C/C 1:5:10 4-20Y 4-25Y G.L G.L HARD CORE 153.73 1ST FLR 2ND FLR 3RD FLR 604.08 TOTAL HEAD ROOM LIFT MACHINE RM WATER TANK 3.61 150.12 FSI AREA BUILDING AREA (DEDUCTIONS) 14.44 (-) 851.49 FSI AREA NON DESCRIPTION LIFT WELL CLUBHOUSE 25.27 25.27 BLOCK A SL.NO. 2 SL.NO. 3 SL.NO. 4 SL.NO. 5 SL.NO. 6 SL.NO. 7 SL.NO. 8 SL.NO. PLOT FOR COVERAGE 830.23 FSI AREA 3320.92 FSI AREA 147.64 NON 760.61 3042.40 134.72 739.13 2956.40 131.72 689.72 2758.88 123.16 547.38 2503.40 84.00 620.14 2710.88 124.03 558.00 2232.00 100.32 150.12 600.48 18.20 284 Minimum SITE AREA OF Patta & Document ,as on site & as per tashildar NOC FSI AREA 20125.41/12040 = 1.67 1208.00 OSR TOTAL- BLOCK A TO G 5031.35 20125.41 845.56 BLOCK G STILT FLOOR CLUBHOUSE AREA 3% OF TOTAL FLOOR AREA SQ.M TWO WHEELER PARKING PROVIDED IN STILT FLOOR LICENSED SURVEYOR SHEET NO :1 1/8 52'%+(+%#6+105 OWNER POWER OF ATTORNEY PROPOSED SEWER LINE ROAD REFERENCE WATER LINE DATE DRG.NO 1/8 BOUNDARY SCALE 0m 1m 2m SITE / STILT FLOOR PLAN 2 ALL DIMENSIONS ARE IN METRE NOTES:- 1 SCALE 1 : 200 , N.T.S 3 EXHAUST FAN TO BE PROVIDED IN KITCHEN. 4 L. P GAS STOVE TO BE USEDIN KITCHEN. 5 RAIN WATER HARVESTING TO BE PROVIDED. 6 BATH ROOM RECYCLING WATER SYSTEM TO BE PROVIDED. 7 RAIN WATER RECYCLING SYSTEM TO BE PROVIDED. OSR 6 KEY PLAN VANDALOOR ZOO TO CHENNAI VANDALUR CRESENT ENGINEERING COLLEGE SHANKARA VIDYALAYA SCHOOL GOVET. SCHOOL URAPPAKKAM ROAD TO KARANAPUDUCHERI VILLAGE GDT ROAD TO CHENGALPUT AYYANCHERI ROAD REVATHIPURAM ROAD TO KELAMBAKKAM RC.NO. 2495 84 DT. 16-6-84 PROPOSED SITE DTCP APPROVED LAYOUT SCALE N.T.S. AREA STATEMENT IN SQ.M. ALL DOORS OF PADAK AND POWDER COATED ALUMINIUM PAINTED WITH OIL BOUND DISTEMBER VETRIFIED TILES /ANTI SKID CERAMIC FLOORING IN C.M. 1:3 PLASTERING WORK IN C.M. 1:4 ROOF SLAB, ETC. IN C.C. 1:2:4 R.C.C. COLUMNS, PLINTH BEAMS, R.C. C. ISOLATED FOUNDATION 0.2M THICK SOLID BLOCK WALLS FOR OUTER SUPERSTRUCTURE IN C.M. 1:5 WITH TWO COURSES OF FLAT TILES LAID TO DETAIL OF PRIMER ON WOOD WORK TWO COATS OF ENAMEL PAINT OVER ONE COAT WEATHERING COURSE IN BRICK JELLY CONCRETE IN C.M. GLAZINGS SS FLY MESH M.S. GRILLS WITH FRICTION HINGES 0.1M THICK SOLID BLOCK WALLS FOR INNER SUPERSTRUCTURE IN C.M. 1:5 PLAN SHOWING THE PROPOSED RESIDENTIAL FLATS AT S. NO. 119 / 1B & 16B, IYYANCHERI VILLAGE, URAPPAKKAM PANCHAYAT CHENGALPUT TALUK CHENGALPUT- KANCHIPURAM DISTRICT 1.5M 5M [patta] 119/1B 2000 SQ.M. 10100 SQ.M. TOTAL 12100 SQ.M. AS PER TASHILDAR NOC SITE AREA AS ON SITE SITE AREA BLOCK C 4TH FLR 186.03 16 SITE / STILT FLOOR PLAN FMB55.00 FMB46.40 FMB63.80 FMB49.60 SITE140.89 SITE 49.84 FMB86.20 FMB18.80 SITE86.2 SITE14.35 FMB155.60 SITE18.8 SITE 55.00 SITE 46.4 SITE 63.8 SITE / STILT FLOOR PLAN 12040.00 12040.00 6.69 5.29 R4.00 R4.00 R4.000 7.60 7.30 7.45 7.20 7.21 4.00 3.90 12.00 4.00 R4.00 R4.00 R4.00 R4.00 R4.00 R4.00 R4.00 R4.000 R4.000 R4.000 R4.000 871.34 738.13 4.2 830.23 36.91 871.34 738.13 4.2 830.23 36.91 871.34 738.13 4.2 830.23 36.91 798.49 673.61 4.2 760.61 33.68 798.49 673.61 4.2 760.61 33.68 798.49 673.61 4.2 760.61 33.68 776.26 658.60 4.2 32.93 776.26 658.60 4.2 32.93 776.26 658.60 4.2 32.93 724.71 615.70 4.2 30.79 724.71 615.70 4.2 30.79 724.71 615.70 4.2 30.79 547.38 4.2 625.85 21.00 547.38 4.2 625.85 21.00 547.38 4.2 625.85 21.00 712.93 620.14 4.2 677.72 31.01 712.93 620.14 4.2 677.72 31.01 712.93 620.14 4.2 677.72 31.01 587.28 501.58 4.20 558.00 25.08 587.28 501.58 4.20 558.00 25.08 587.28 501.58 4.20 558.00 25.08 153.73 3.61 150.12 153.73 3.61 150.12 153.73 3.61 150.12 53/ NON FSI BLOCK A TO G 845.56 845.56 NON FSI NON FSI AREA 4.2% OF TOTAL BUILT UP AREA 20125.40SQ.M ALLOWED 10 % FMB18.2 4.61 4.52 6.00 SITE18.2 CAR PARKING TWO WHEELER PARKING TWO WHEELER PARKING 1.5M DRIVE WAY 8.240 8.110 12.795 6.410 4.555 4.355 2.490 5.000 2.500 5.000 5.000 2.500 1.500 2.000 FW1 A 1.200 1.000 1.040 1.200 1.200 2.500 1.040 1.200 1.200 2.500 3.440 2.745 MD D1 D1 D2 D2 D2 D2 D2 D2 MD C C 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 1.940 3.525 MD V 3.000 3.045 3.000 3.990 3.000 3.000 1.5M WIDE TWO WHEELER DRIVING 1.5M WIDE TWO WHEELER DRIVING FW1 MD MD D1 V1 CARE TAKER ROOM D1 D2 KW A B B 1.300 1.300 1.200 1.200 1.200 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 SERVANTS BATH ROOM D V1 D1 FW1 3.080 2.740 1.600 2.645 D2 V FW1 MD MD FW1 FW1 MD MD B B 1.300 1.300 1.200 1.200 1.200 1.000 1.000 1.000 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 D1 V1 D1 D2 V FW1 MD MD D1 D2 V A B B FW1 4.085 2.210 1.220 4.460 3.255 2.645 1.220 2.800 1.000 1.000 1.300 1.300 1.200 1.200 1.200 1.195 0.265 1.050 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 KW FW1 MD 5.990 3.445 V1 D1 D2 1.715 2.645 2.745 3.245 A B B 1.000 1.300 1.300 1.200 1.200 1.200 0.265 1.000 1.195 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 FW1 FW1 B B A D2 D1 4.880 2.645 1.175 2.745 3.370 2.745 1.300 1.200 1.200 1.200 1.300 1.300 1.200 1.200 1.200 1.300 2.500 5.000 2.500 5.000 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 MD MD MD MD B B D2 1.300 1.300 1.200 1.200 1.200 1.300 1.300 1.200 1.200 1.200 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 2.000 1.500 5.000 2.500 5.000 2.500 5.000 2.500 5.000 2.500 1 13.48 13.48 67.74 69.60 13.48 13.48 66.00 64.16 13.48 62.05 13.48 60.06 13.48 58.09 13.48 56.51 15.46 54.13 51.33 15.46 15.95 49.16 15.95 46.26 44.13 20.50 20.50 40.61 25.529 17.500 2.600 36.169 12144.97 12100.00 12144.97 20.708 739.13 739.13 739.13 689.72 689.72 689.72 641.01 641.01 641.01 Security cabin Bore well Bore well Bore well 2NCP QH UGEWTKV[ ECDKP 5' 'NGXCVKQP 5' 55 55 5GE Ä 55Ä55 1.5M 1.5M 2.4M 2.4M BLOCK A NO.OF FLATS 1 TYPE SL.NO. 12 BLOCK B 2 12 BLOCK C 3 BLOCK D 4 10 BLOCK E 5 BLOCK F 6 BLOCK G 7 6 11 12 8 TOTAL NO. OF FLATS EWS TOTAL 71 NO.OF FLATS 48 48 40 24 44 48 32 284 PER FLOOR NO.OF FLOOR 4 4 4 4 4 4 4

SITE 49.84 AREA STATEMENT IN SQ.M. FMB49.60 TWO …environmentclearance.nic.in/writereaddata/online/... · 760.61 flat area fsi area 33.68 134.72 building area (deductions) (deductions)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • SCIENTIFICALLY CLOSEDSUMP OF1,50,000LITRESCAPACITY

    S.NO. 120

    S.NO. 126

    7.237.22

    7.24

    7.31

    7.34

    7.207.30

    7.22

    7.25

    7.34

    7.23

    7.19

    7.22

    7.19

    7.21

    7.20

    7.22

    7.20

    7.24

    7.23

    7.207.20

    7.21

    7.22

    7.20

    7.28

    6.00

    6.00

    6.00

    6.00

    6.00

    6.00

    6.00

    6.00

    6.00

    6.00

    7.41

    7.47

    7.50

    7.25

    7.29

    7.32

    7.34

    7.30

    7.28

    8'

    6.00

    BLOCK A

    TWO WHEELER PARKINGREQUIRED

    CAR PARKINGREQUIRED

    CAR PARKINGPROVIDED

    1

    TYPESL.NO.

    48 75 NIL 9

    BLOCK B2 48 45 8 20

    BLOCK C3

    BLOCK D4 36 4 22

    BLOCK E- EWS5

    BLOCK F6

    BLOCK G7 4 20 20 14

    40 29 4 22

    48 53 NIL 10

    4 64 28 16

    IN STILT FLR.

    GRAND TOTAL 251 302 70 114

    REQUIRED PROVIDED REQUIRED PROVIDED

    PARKING STATEMENT

    RISE 0.157

    TREAD 0.25

    R.C.C SLAB

    STAIRCASE DETAIL

    HAND RAIL0.91M Ht

    BORE WELL

    SAND

    1.5M

    1.0M

    BLOCK A

    NO.OF FLATS

    1

    TYPESL.NO.

    48

    BLOCK B2 48

    BLOCK C3

    BLOCK D4 40

    BLOCK E5

    BLOCK F6

    BLOCK G7 24

    44

    48

    32

    TOTAL NO. OF FLATS

    EWS- BUILT UP AREA REQUIRED

    1802.1

    2103.40

    FSI AREA OF BLOCK A TO G

    COVERAGE AREA OF BLOCK A TO G

    COVERAGE AREA 5031.35/12040

    =20125.38

    = 5031.35

    = 41.78 %

    FSI

    COVERAGE

    FSI ALLOWED @ 12040x1.8

    21672

    OSR REQUIRED OF MINIMUM SITE AREA

    1204.00

    OSR PROVIDED

    DOCUMENT

    SITE AREA

    119/16B

    SITE AREA

    EWS

    20125.38-2103.4=18021.98X10%

    EWS- BUILT UP AREA PROVIDED

    SITE AREA

    604.08

    CLUB HOUSE AREA %

    871.34 738.131ST FLR

    2ND FLR

    3RD FLR

    2952.523320.92

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    830.23

    FSI AREA

    FLAT AREA

    36.91

    147.64

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.80

    (-)

    (-)

    4507.26

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    49.33

    49.33

    923.24

    798.49673.611ST FLR

    2ND FLR

    3RD FLR

    2694.443042.40

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    760.61

    FSI AREA

    FLAT AREA

    33.68

    134.72

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.80

    (-)

    (-)

    4159.53

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    BLOCK B

    47.36

    47.36

    870.85

    776.26 658.601ST FLR

    2ND FLR

    3RD FLR

    2634.322956.40

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    739.13

    FSI AREA

    FLAT AREA

    32.93

    131.72

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.8

    (-)

    (-)

    4067.29

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    45.99

    45.99

    870.35

    724.71615.701ST FLR

    2ND FLR

    3RD FLR

    2462.802758.88

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    689.72

    FSI AREA

    FLAT AREA

    30.79

    123.16

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.80

    (-)

    (-)

    3744.17

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    39.83

    39.83

    765.67

    BLOCK D

    641.01 547.381ST FLR

    2ND FLR

    3RD FLR

    2189.522463.68

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    625.85

    FSI AREA

    FLAT AREA

    21.00

    84.00

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.8

    (-)

    (-)

    3498.94

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    BLOCK E - EWS

    41.96

    41.96

    810.44

    712.93620.141ST FLR

    2ND FLR

    3RD FLR

    2480.562710.88

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.2

    AREA FOR BALCONY

    677.72

    FSI AREA

    FLAT AREA

    31.01

    124.03

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.8

    (-)

    (-)

    3672.43

    FSI AREA

    NON

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    BLOCK F

    30.33

    30.33

    760.05

    587.28 501.581ST FLR

    2ND FLR

    3RD FLR

    2006.322232.00

    TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    4TH FLR

    4.20

    AREA FOR BALCONY

    558.00

    FSI AREA

    FLAT AREA

    25.08

    100.32

    BUILDING

    AREA

    (DEDUCTIONS)

    (DEDUCTIONS)

    16.8

    (-)

    (-)

    3085.88

    FSI AREA

    NON

    DESCRIPTION

    STILT FLR

    NON FSI- 5% OF FLAT

    LIFT WELL

    29.21

    29.21

    678.34

    TOTAL8 228 302 64 114

    VISITOR'S

    PARKING

    23

    EWS

    TOTAL

    12Y-150C/C

    10Y-150 C/C

    8Y-4L-150 C/C

    1:5:10

    4-20Y

    4-25Y

    G.L G.L

    HARD CORE

    153.731ST FLR

    2ND FLR

    3RD FLR

    604.08TOTAL

    HEAD ROOM

    LIFT

    MACHINE RM

    WATER TANK

    3.61150.12

    FSI AREABUILDING

    AREA

    (DEDUCTIONS)

    14.44

    (-)

    851.49

    FSI AREA

    NON

    DESCRIPTION

    LIFT WELL

    CLUBHOUSE

    25.27

    25.27

    BLOCK A

    SL.NO.

    2

    SL.NO.

    3

    SL.NO.

    4

    SL.NO.

    5

    SL.NO.

    6

    SL.NO.

    7

    SL.NO.

    8

    SL.NO.

    PLOT

    FOR

    COVERAGE

    830.23

    FSI AREA

    3320.92

    FSI AREA

    147.64

    NON

    760.61 3042.40 134.72

    739.13 2956.40 131.72

    689.72 2758.88 123.16

    547.38 2503.40 84.00

    620.14 2710.88 124.03

    558.00 2232.00 100.32

    150.12 600.48

    18.20

    284

    Minimum SITE AREA OF Patta &

    Document ,as on site &

    as per tashildar NOC

    FSI AREA 20125.41/12040

    = 1.67

    1208.00

    OSR

    TOTAL- BLOCK A TO G

    5031.35 20125.41 845.56

    BLOCK G

    STILT FLOOR

    CLUBHOUSE AREA 3% OF

    TOTAL FLOOR AREA SQ.M

    TWO WHEELERPARKING PROVIDED IN STILT FLOOR

    LICENSED SURVEYOR

    SHEET NO :1 1/8

    OWNER POWER OF ATTORNEY

    PROPOSED

    SEWER LINEROAD

    REFERENCE

    WATER LINE

    DATEDRG.NO

    1/8

    BOUNDARY

    SCALE

    0m 1m 2m

    SITE /

    STILT FLOOR PLAN

    2 ALL DIMENSIONS ARE IN METRE

    NOTES:-1 SCALE 1 : 200 , N.T.S

    3 EXHAUST FAN TO BE PROVIDED IN KITCHEN.4 L. P GAS STOVE TO BE USEDIN KITCHEN.5 RAIN WATER HARVESTING TO BE PROVIDED.6 BATH ROOM RECYCLING WATER SYSTEM TO BE PROVIDED.7 RAIN WATER RECYCLING SYSTEM TO BE PROVIDED.

    OSR

    6

    KEY PLAN

    VA

    ND

    ALO

    OR

    ZOO

    TO CHENNAI

    VA

    ND

    ALU

    RCR

    ESEN

    T EN

    GIN

    EERI

    NG

    CO

    LLEG

    E

    SHANKARAVIDYALAYA SCHOOL GOVET.SCHOOL

    URA

    PPA

    KK

    AM

    ROA

    D T

    O K

    ARA

    NA

    PUD

    UCH

    ERI V

    ILLA

    GE

    GDT ROAD

    TO CHENGALPUT

    AY

    YA

    NCH

    ERI R

    OA

    D REV

    ATHI

    PURA

    M R

    OAD

    TO K

    ELA

    MBA

    KK

    AM

    RC.NO.249584 DT. 16-6-84

    PROPOSED SITE

    DTCP APPROVED LAYOUT

    SCALE N.T.S.

    AREA STATEMENT IN SQ.M.

    ALL DOORS OF PADAK AND POWDER COATED ALUMINIUM PAINTED WITH OIL BOUND DISTEMBERVETRIFIED TILES /ANTI SKID CERAMIC FLOORING IN C.M. 1:3PLASTERING WORK IN C.M. 1:4 ROOF SLAB, ETC. IN C.C. 1:2:4R.C.C. COLUMNS, PLINTH BEAMS,

    R.C. C. ISOLATED FOUNDATION0.2M THICK SOLID BLOCK WALLS FOR OUTER SUPERSTRUCTURE IN C.M. 1:5

    WITH TWO COURSES OF FLAT TILES LAID TO DETAIL

    OF PRIMER ON WOOD WORKTWO COATS OF ENAMEL PAINT OVER ONE COAT

    WEATHERING COURSE IN BRICK JELLY CONCRETE IN C.M.

    GLAZINGS SS FLY MESH M.S. GRILLS WITH FRICTION HINGES

    0.1M THICK SOLID BLOCK WALLS FOR INNER SUPERSTRUCTURE IN C.M. 1:5

    PLAN SHOWING THE

    PROPOSED RESIDENTIAL

    FLATS AT S. NO. 119 / 1B

    & 16B, IYYANCHERI VILLAGE,

    URAPPAKKAM PANCHAYAT

    CHENGALPUT TALUK

    CHENGALPUT-

    KANCHIPURAM DISTRICT

    1.5M

    5M

    [patta]

    119/1B

    2000 SQ.M.

    10100 SQ.M.

    TOTAL 12100 SQ.M.

    AS PER TASHILDAR NOC

    SITE AREA

    AS ON SITE

    SITE AREA

    BLOCK C

    4TH FLR

    186.03

    16

    SITE / STILT FLOOR PLAN

    FMB5

    5.00

    FMB4

    6.40

    FMB6

    3.80

    FMB49.60

    SITE

    140.8

    9

    SITE 49.84

    FMB86.20

    FMB1

    8.80

    SITE86.2

    SITE

    14.35

    FMB1

    55.60

    SITE

    18.8

    SITE

    55.00

    SITE

    46.4

    SITE

    63.8

    SITE / STILT FLOOR PLAN

    12040.00

    12040.00

    6.69

    5.29

    R4.00

    R4.00

    R4.00

    0

    7.60

    7.30

    7.45

    7.20

    7.21

    4.00 3.90

    12.00 4.00

    R4.00

    R4.00

    R4.00

    R4.00

    R4.00

    R4.00

    R4.00

    R4.00

    0R4

    .000

    R4.00

    0R4

    .000

    871.34 738.134.2830.2336.91

    871.34738.13

    4.2830.2336.91

    871.34 738.134.2 830.2336.91

    798.49 673.614.2

    760.6133.68

    798.49 673.614.2 760.6133.68

    798.49673.61

    4.2760.6133.68

    776.26 658.604.232.93

    776.26658.60

    4.232.93

    776.26 658.604.2 32.93

    724.71 615.704.2

    30.79

    724.71 615.704.2 30.79

    724.71615.70

    4.230.79

    547.384.2625.8521.00

    547.384.2

    625.8521.00

    547.384.2 625.8521.00

    712.93 620.144.2

    677.7231.01

    712.93 620.144.2 677.7231.01

    712.93620.14

    4.2677.7231.01

    587.28 501.584.20558.0025.08

    587.28 501.584.20

    558.0025.08

    587.28 501.584.20 558.0025.08

    153.733.61

    150.12

    153.733.61 150.12

    153.73 3.61150.12

    NON FSI BLOCK A TO G

    845.56

    845.56

    NON FSI

    NON FSI AREA 4.2% OF

    TOTAL BUILT UP AREA 20125.40SQ.M

    ALLOWED 10 %

    FMB1

    8.2

    4.614.52

    6.00

    SITE

    18.2

    UP

    CAR PARKING

    TWO WHEELER PARKING

    DN

    TWO WHEELER PARKING

    1.5M DRIVE WAY

    8.240

    8.110

    12.795

    6.410

    4.555

    4.355

    2.490

    5.000

    2.500

    5.000

    5.000

    2.500

    1.500

    2.000

    FW1

    A

    1.200 1.000 1.040

    1.200

    1.200

    2.500

    1.040

    1.200

    1.200

    2.500

    3.440

    2.745

    MD

    D1

    D1

    D2D2

    D2 D2

    D2

    D2

    MD

    C

    C

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    1.940

    3.525

    MD

    V

    3.000

    3.045

    3.000 3

    .990

    3.000

    3.000

    UP

    1.5M WIDE TWO WHEELER DRIVING 1.5M WIDE TWO WHEELER DRIVING

    FW1

    MD MD

    D1

    V1

    CARE TAKER ROOM

    D1

    D2

    KW

    A

    B

    B

    1.300 1.300

    1.200

    1.200

    1.200

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.5002.0

    001.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    SERVANTSBATH ROOM

    D

    V1

    D1FW1

    3.080

    2.7401.60

    0

    2.645

    D2V FW1

    MD MD

    FW1FW1

    MDMD

    B

    B

    1.300 1.3001.20

    0 1.200

    1.200

    1.000

    1.000

    1.000

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.5002.0

    001.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    D1

    V1

    D1 D2

    V

    FW1

    MDMD

    D1D2

    V

    A

    B

    B

    FW1

    4.085

    2.210

    1.220

    4.460

    3.2552.6

    45

    1.2202.800

    1.000 1.000

    1.300 1.300 1.20

    0

    1.2001.200

    1.195

    0.265

    1.050

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    KW

    FW1

    MD

    5.990

    3.445

    V1

    D1D2

    1.715

    2.645

    2.745

    3.245

    A

    B

    B

    1.000

    1.300 1.300

    1.200

    1.200

    1.200

    0.2651.000

    1.195

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    FW1FW1

    B

    B

    A

    D2 D1

    4.880

    2.645

    1.175

    2.745

    3.370

    2.745

    1.3001.20

    0 1.200

    1.200

    1.300 1.3001.20

    0 1.200

    1.200

    1.300

    2.500

    5.000

    2.500

    5.000

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    MDMD

    MD

    MD

    B

    B

    D2

    1.300 1.3001.20

    0 1.200

    1.200

    1.300 1.3001.20

    0 1.200

    1.200

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    2.000

    1.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    5.000

    2.500

    1

    13.48

    13.48

    67.74

    69.60

    13.48

    13.48

    66.00

    64.16

    13.48

    62.05

    13.48

    60.06

    13.48

    58.09

    13.48

    56.51

    15.46

    54.13

    51.33

    15.46

    15.95

    49.16

    15.95

    46.26

    44.13

    20.50

    20.50

    40.61

    25.52

    9

    17.500

    2.600

    36.169

    12144.97

    12100.00

    12144.97

    20.708

    739.13

    739.13

    739.13

    689.72

    689.72

    689.72

    641.01

    641.01

    641.01

    Security cabin

    Bore well

    Bore well

    Bore well

    1.5M

    1.5M

    2.4M

    2.4M

    BLOCK A

    NO.OF FLATS

    1

    TYPESL.NO.

    12

    BLOCK B2 12

    BLOCK C3

    BLOCK D4 10

    BLOCK E5

    BLOCK F6

    BLOCK G7 6

    11

    12

    8

    TOTAL NO. OF FLATS

    EWS

    TOTAL 71

    NO.OF FLATS

    48

    48

    40

    24

    44

    48

    32

    284

    PER FLOORNO.OF FLOOR

    4

    4

    4

    4

    4

    4

    4

  • AREA STATEMENT IN SQ.M.BLOCK A

    1

    BLOCK B

    2

    BLOCK cF; t* F;3

    BLOCN D

    e.-"{"6)

    4

  • BLOCK E. EWS

    5

    lqBLO CKF

    p.*

    6

    BLC[*1)cK (

    dM e^M

    7

    CLUBHOUSE

    p. *)

    8

    TOTAL- BLOCKA TO G

  • WATER DEMAND CALCULATION OORAPAKAM

    FacilitiesOccupan

    cy

    Per Capita Water Requirement 135 ltrs/day

    Domestic (LD) Flushing (LD) Total (LD)Block A(48x5) 240 21600 10800 32400Block B(48x5) 240 21600 10800 32400Block C(44x5) 220 19800 9900 29700Block D(40x5) 200 18000 9000 27000Block E(48x5) 240 21600 10800 32400Block F(32x5) 160 14400 7200 21600Block G(24x5) 120 10800 5400 16200Club house(10% of over allpopulation) 142 2840 3550 6390Swimming pool make up 5000 5000Maintenance Staffs &Visitors (10 %) 167 3340 4175 7515Water requirement

    1729138 71 210

    Say in KLDGardening (3221x 3.5) 11.27Sewage Generation (80 % Domestic + 100 % Flushing) 182 KLDSTP Capacity (KLD) 200KLD

  • WATER BALANCE

    Gardening11.27KLD

    CMWSSB Sewer90.73KLD

    Total water Demand210KLD

    Sewage Generation

    182KLD

    STP Design Capacity200KLD

    Treated Water (95%)173

    Recycle waterFlushing

    Purposes71 KLDKLD

    Fresh water Demand(CMWSSBwater Supply)

    138 KLD

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    1

    SEWAGE TREATMENT PLANT

    Technical Specification

    Client

    M/S. Urban Tree Infrastructures Pvt.Ltd.,

    Coimbatore

    Contractor

    M/s. Hubert Enviro Care Systems (p) ltd

    Chennai – 83

    Description

    For Approval

    P.O. No.

    DD-AMD-STP-TS-01Doc. No.

    0Rev.

    14.03.14Date

    CRPrepared by

    JRMC.E.O

    CRChecked by

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    2

    Technical Specification for Sewage Treatment Plant

    1.0 Project & Business Objectives

    M/S. Hubert Enviro Care Systems (P) Ltd seeks to provide the best technology for

    the supply of Sewage treatment plant.

    2.0 Scope of Work

    The Scope of our work includes as follows

    Design & detailed Engineering

    Fabrication & Supply of all electromechanical equipments

    Erection of all equipments

    Testing & Commissioning of all equipments

    Note: All Civil Works are under Client’s scope.

    3.0 Design Basis:

    STP

    Plant Capacity - 200 KLD

    Operating hours - 24 hrs

    Plant flow rate - 7.7 cum/hr

    Design flow rate - 8.3 cum/hr

    4.0 Quality logistics:

    MBBR Technology

    S.No Description Unit STP Inlet STP Outlet Standards

    1 pH 7 - 8 6.5 – 7.5 6.5 – 8.5

    2 TSS mg/l 200 - 250 < 20 < 30

    3 BOD mg/l 350 - 400 < 20 < 20

    4 COD mg/l 400 - 500 < 100 < 250

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    3

    5.0 Battery Limit:

    1. Sewage Inlet & outlet is clients scope

    2. Incomer Electrical power - 415 Volts and 50 Hz

    3. Power incomer to our panel is under client’s scope

    4. Cabling for Panel to the individual equipments is under Contractor’s scope

    5. Construction Water & Power is under Client’s scope.

    6. Site clearance & handing over of the site to contractor is under Client’s scope.

    6.0 Connectivity

    Inlet Port : 100 mm

    Outlet port : 100 mm

    7.0 Codes & Standards:

    All design; fabrication, inspection, and testing of the plant will be done with respect

    to the latest Indian Standards. Incase of non-availability of standards, good

    engineering practice will be adopted.

    Standards to be followed:

    Plain & reinforced cement concrete – IS 456: 2000

    Concrete structure for the storage of liquids – IS 3370: 1981-88

    Pressure vessels – ASME SEC VIII

    Pumps – IS 5120

    Others – Available IS standards.

    Incase of non-availability of standards, good engineering practice will be

    adopted.

    9.0 Process description:

    MBBR Technology

    The sewage generated from the various sources will be collected in the collection

    tank through the bar screen chamber in order to remove the floating materials and

    particle size greater than 15mm. The Screened sewage is then led to the aeration

    tank.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    4

    In the aeration tank, air is diffused through special type of diffusers to oxidize the

    organic matters with the help of air blower & diffuser arrangement. Biological

    treatment takes place through MBBR media. Then the overflow from aeration tank

    is sent to the Clarifier tank for settling. The bioflocs formed in the aeration tank will

    be settled at the bottom of the Clarifier tank through Clarifier rake mechanism and

    the settled sludge will be pumped to the sludge holding tank through the return

    sludge pump. From sludge holding tank, the sludge will be fed to filter press unit

    for dewatering purpose through screw pumps.

    The clarified overflow will be collected in the Clarified water tank from where it is

    pumped to the Pressure Sand Filter, Activated Carbon Filter through Filter feed

    pump for the removal of suspended solids, organic matter and odour. UV dosing is

    given for disinfection purpose. The filtered water is stored in the treated water tank

    from where it is usde for gardening purpose.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    5

    TECHNICAL SPECIFICATIONS

    OF

    CIVIL WORKS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    6

    SEWAGE TREATMENT PLANT

    Specification of Collection Tank (UG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 72.16 Cum3 Length 8.2 m4 Width 4 m5 Liquid depth 2.2 m6 Total Height 3.5 m7 Invert Level 1m below FGL8 MOC RCC - M309 Wall Thickness As per the structural design

    10 Raft Thickness As per the structural design11 PCC As per the structural design12 Base Reinforcement Details As per the structural design13 Wall Main Reinforcement Details As per the structural design14 Wall Distributer Reinforcement

    DetailsAs per the structural design

    15 Plastering CM 1:316 Plastering Thickness 12 mm17 Submersible Pump Pit 1.5m x 0.5m x 0.5m

    Adequacy calculation

    Volume of Collection tank V - 72.16 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 72.16 /8.3

    - 8.6 hrs

    Standard retention hrs for Collection tank is 6 hrs – 8 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    7

    SEWAGE TREATMENT PLANT

    Specification of Screen Chamber (UG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank data1 Quantity 1 No2 Capacity 0.324 cum3 Length 1.2 m4 Width 0.6 m5 Liquid depth 0.45 m6 Depth 1.6 m7 Wall Thickness As per the structural design8 MOC RCC9 Base Reinforcement As per the structural design

    10 Wall Reinforcement As per the structural design11 Plastering CM 1:312 Plastering Thickness 12 mm

    Adequacy calculation

    Volume of Bar Screen Chamber V - 0.324 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 0.324 /8.3

    - 0.036 hrs

    - 2.16 mins

    Standard retention hrs for Bar Screen chamber is 1 min – 5 mins

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    8

    SEWAGE TREATMENT PLANT

    Specification of Aeration Tank (AG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 108.8 cum3 Length 8.5 m4 Width 4 m5 Liquid depth 3.2 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

    10 PCC As per the structural design11 Base Reinforcement As per the structural design12 Wall Main Reinforcement As per the structural design13 Wall Distributer Reinforcement As per the structural design14 Plastering CM 1:315 Thickness of Plastering 12 mm

    Adequacy calculation

    Volume of Aeration tank V - 108.8 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 108.8 /8.3

    - 12.1 hrs

    Standard retention hrs for Aeration tank is 8 hrs – 12 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    9

    SEWAGE TREATMENT PLANT

    Specification of Clarifier Tank (AG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 35.19 cum3 Diameter 4 m4 Liquid Depth 2.8 m5 Total Height 3.5 m6 MOC RCC – M307 Wall Thickness As per the structural design8 Raft Thickness As per the structural design9 PCC As per the structural design

    10 Base Reinforcement Details As per the structural design11 Wall Main Reinforcement Details As per the structural design12 Wall Distributer Reinforcement

    DetailsAs per the structural design

    13 Plastering CM 1:314 Thickness of Plastering 12 mm

    Adequacy calculation

    Volume of Clarifier tank V - 35.19 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 35.19 /8.3

    - 3.9 hrs

    Standard retention hrs for Clarifier tank is 3 hrs – 3.5 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    10

    SEWAGE TREATMENT PLANT

    Specification of Sludge Holding tank (AG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 12 cum3 Length 1 m4 Width 4.0 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC – M308 Wall Thickness As per the Structural design9 Raft Thickness As per the Structural design

    10 PCC As per the Structural design11 Base Reinforcement Details As per the Structural design12 Wall Main Reinforcement Details As per the Structural design13 Wall Distributer Reinforcement

    DetailsAs per the Structural design

    14 Plastering CM 1:315 Thickness of Plastering 12 mm

    Adequacy calculation

    Volume of Sludge holding tank V - 12 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 12 /8.3

    - 1.33 hrs

    Standard retention hrs for Sludge Holding tank is 1 hrs – 1.5 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    11

    SEWAGE TREATMENT PLANT

    Specification of Clarified Water Tank (AG)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 19.2 cum3 Length 2 m4 Width 4 m5 Liquid Depth 2.4 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

    10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

    DetailsAs per the structural design

    14 Plastering CM 1:315 Thickness of Plastering 12 mm

    Adequacy calculation

    Volume of Clarified water tank V - 19.2 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 19.2 /8.3

    - 2.13 hrs

    Standard retention hrs for Clarified water tank is 1.5 hrs – 2 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    12

    SEWAGE TREATMENT PLANT

    Specification of Treated Water Tank

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Tank Data1 Quantity 1 No2 Capacity 48 cum3 Length 4 m4 Width 4 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

    10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

    DetailsAs per the structural design

    14 Plastering CM 1:315 Thickness of Plastering 12 mm

    Adequacy calculation

    Volume of Treated Water tank V - 48 cum

    Plant Flow Rate Q - 8.3 cum/hr

    Retention time T - V / Q

    - 48 /8.3

    - 5.33 hrs

    Standard retention hrs for Treated water tank is 4 hrs – 6 hrs

    Provided retention hrs is > or = Standard retention hrs.

    Hence adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    13

    TECHNICAL SPECIFICATIONS

    OF

    ELECTROMECHANICAL

    WORKS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    14

    SEWAGE TREATMENT PLANT

    Specification of Raw Sewage Transfer Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPump data

    1 Quantity 2 No (1W+1S)2 Type Submersible Nonclog3 Capacity 9 cum/hr4 Head 15 - 20 m5 Speed 2900 rpm6 Seal Gland Packing7 Pump Delivery Size 50 NB8 Motor rating 2 HP9 Phase 3 phase

    10 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%11 Class of insulation F12 Model 1500 CW13 MOC CI14 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    15

    SEWAGE TREATMENT PLANT

    Specification of Bar Screen

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Screen data1 Quantity 1 No2 Opening size 15 mm3 Size of Flat 25 x 5mm.4 Width 600 mm5 Height 1600 mm6 MOC MS – Epoxy7 Make HECS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    16

    SEWAGE TREATMENT PLANT

    Specification of Air Blower

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Air Blower Data1 Quantity 2 No (1W + 1S)2 Type Twin Lobe Rotary3 Capacity 300 cum/hr4 Pressure 0.6 kg/cm25 MOC CI6 Model 65 AC7 Size 80 mm8 Make Kay / eq.

    Motor Data9 Quantity 2 No (1W + 1S)

    10 Type TEFC Squirrel Cage Induction11 MOC CI12 Speed 1440 rpm13 Voltage / Frequency 415 V / 50 Hz14 Motor Rating 15 HP15 Power Supply 3 Phase16 Make Kirloskar / eq.

    Adequacy calculation

    Assume O2 requirement = 2 kg of O2/ 1 kg of BOD

    1kg of BOD / 2 kg of O2

    Assume BOD for sewage = 400 mg/l = 0.40 kg/m3

    BOD Load = 207 x 0.40

    = 82.8 kg of BOD/day

    O2 requirement = 82.8 x 2

    = 165.6 kg of O2/day

    Oxygen transfer @ 16% of SOTR = 165.6 / (0.16 x 0.23x 0.65 x 0.95)

    = 165.6 / 0.023 = 7200

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    17

    α = 0.65; β = 0.95

    Density = 1.16 => 7200 / 1.16 = 6206.9 m3/day

    Air requirement = 6206.9 / 24 = 258.62 m3/hr

    Therefore 300 m3/hr (1 + 1) each for aeration tank, the air flow rate is adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    18

    SEWAGE TREATMENT PLANT

    Specification of Diffusers

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Coarse Bubble Diffuser Data1 Quantity 8 No2 Type Tubular Coarse bubble3 Diameter 90 mm Dia4 Length 1000 mm5 MOC EPDM6 Location Collection tank7 Make HECS

    Fine Bubble Diffuser Data8 Quantity 22 No9 Type Tubular Fine bubble

    10 Diameter 90 mm Dia11 Length 1000 mm12 MOC EPDM13 Location Aeration tank14 Make HECS

    Adequacy calculation:

    Blower capacity = 300 cum/hr

    Air flow rate per diffuser = 10 m3/hr

    Therefore no. of diffusers required = 300 / 10 = 30 nos

    No. of diffusers provided = 30 nos

    Hence it’s adequate.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    19

    SEWAGE TREATMENT PLANT

    Specification of MBBR Media

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Media Data1 Quantity 1 Lot2 Type Moving Bed Bio Reactor3 Surface area 450 m2 / m34 MOC PVC5 Location Aeration tank6 Accessories SS mesh at the outlet of the aeration

    tank to avoid the escape of media7 Make HECS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    20

    SEWAGE TREATMENT PLANT

    Specification of Clarifier Rake Mechanism

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Feed Well data1 Quantity 1 no2 Type Central driven3 Feed well diameter 800 mm4 Feed well Height 1500 mm5 MOC of Feed Well MS – Epoxy6 Supports MS Angle / Channel7 Make HECS

    Rake Mechanism8 Quantity 1 No (4 m diameter)9 Structure Channel / Angles

    10 MOC of Rake MS Epoxy11 Accessories Rubber Squeezes, Bolt, nuts etc12 Make HECS

    Drive Head data13 Quantity 1 No14 Drive Head diameter 450 mm15 Ratio 50 : 116 MOC CI

    Gearbox data17 Quantity 1 No18 Type Foot Mounted19 Ratio 70 : 120 MOC CI21 Make Elecon / eq.

    Motor data22 Quantity 1 No23 Type TEFC Squirrel Cage Induction24 MOC CI25 Rating 2 HP26 Power Supply 3 Phase27 Voltage / Frequency 415 V / 50 Hz28 Make Kirloskar / eq.29 Accessories Love jaw Coupling, Gear Sprockets ,

    Chain with links

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    21

    SEWAGE TREATMENT PLANT

    Specification of Return Sludge Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPump data

    1 Quantity 2 No (1W + 1S)2 Type Centrifugal Nonclog3 Capacity 3 cum/hr4 Head 12 - 15 m5 Speed 2760 rpm6 Model SP ‘O’7 MOC CI8 Make Kirloskar / eq.

    Motor data9 Motor type TEFC Squirrel Cage Induction

    10 Motor rating 1 HP11 Phase 3 phase13 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%14 MOC CI15 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    22

    SEWAGE TREATMENT PLANT

    Specification of Screw Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPump data

    1 Quantity 1 No2 Type Single Screw Single Stage3 Capacity 2 cum/hr4 Head 50 m5 Speed 325 rpm6 MOC of Rotor SS 3047 MOC of Stator EPDM8 Make Heliflow / eq.

    Motor data9 Motor type TEFC Squirrel cage induction type

    10 Motor rating 2 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    23

    SEWAGE TREATMENT PLANT

    Specification of Filter Press Unit

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Filter Press Unit data1 Quantity 1 No2 Type Manual Hydraulic3 Capacity 2 cum/hr4 Operating Pressure 5 Kg/cm25 MOC of Structure MS6 No of Plates 87 No. of Chambers 78 Size 470mm x 470mm9 MOC of Plates PP

    10 Make Swarna Sankara / Isha / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    24

    SEWAGE TREATMENT PLANT

    Specification of Filter Feed Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPump data

    1 Quantity 2 No (1W +1S)2 Type Centrifugal Monobloc3 Capacity 9 cum/hr4 Head 30 m5 MOC CI6 Speed 2760 rpm7 Model KDS 335++8 Make Kirloskar / eq.

    Motor data9 Type TEFC Squirrel Cage Induction type

    10 Motor rating 3 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    25

    SEWAGE TREATMENT PLANT

    Specification of Pressure Sand filter

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Vessel data1 Quantity 1 no2 Type Vertical pressure vessel3 Capacity 9 cum/hr4 Diameter 1100 mm5 HOS 1500 mm6 MOC MS-Epoxy7 Shell Thickness 6 mm8 Dish Thickness 8 mm9 Working pressure 2.5 kg/cm2

    10 Design Pressure 3.2 Kg/cm211 Test Pressure 6 Kg/cm212 Make HECS

    Frontal Piping data13 Size 65 NB14 Accessories Flanges, Elbow, Tee15 MOC MS16 Type of Valves Butterfly Valves17 Size of Valves 65 NB / 40 NB18 Make of Pipes Jindal / eq.19 Make of Valves Intervalve / eq.

    Media Details20 25 – 50mm Pebbles 100 mm21 12 – 25mm Pebbles 100 mm22 6 – 12 mm Pebbles 100 mm23 3 - 6 mm Pebbles 100 mm24 Coarse Sand 250 mm25 Fine Sand 450 mm

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    26

    Pressure Sand Filter:

    Flow rate Q : 9 cum/hr

    Filtration rate for PSF (V) : 10 m3/m2 hr

    Q : A x V

    A : 9 / 10

    : 0.9 SQ.M

    D2 : 0.9 X 4 / 3.14

    : 1.146

    D : 1.07 M

    Diameter provided is 1100 mm

    Hence adequate

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    27

    SEWAGE TREATMENT PLANT

    Specification of Activated Carbon filter

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

    Vessel data1 Quantity 1 no2 Type Vertical pressure vessel3 Capacity 9 cum/hr4 Diameter 1100 mm5 HOS 1500 mm6 MOC MS-Epoxy7 Shell Thickness 6 mm8 Dish Thickness 8 mm9 Working pressure 2.5 kg/ cm2

    10 Design Pressure 3.2 kg/ cm211 Test Pressure 6 kg/ cm212 Make HECS

    Frontal Piping data13 Size 65 NB14 Accessories Flanges, Elbow, Tee15 MOC MS16 Type of Valves Butterfly Valves17 Size of Valves 65 NB / 40 NB18 Make of Pipes Jindal / eq.19 Make of Valves Intervalve / eq.

    Media Details20 25 – 50mm Pebbles 100 mm21 12 – 25mm Pebbles 100 mm22 6 – 12 mm Pebbles 100 mm23 3 - 6 mm Pebbles 100 mm24 Coarse Sand 250 mm25 Activated Carbon 450 mm

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    28

    Activated Carbon Filter:

    Flow rate Q : 9 cum/hr

    Filtration rate for ACF (V) : 10 m3/m2 hr

    Q : A x V

    A : 9 / 10

    : 0.9 SQ.M

    D2 : 0.9 X 4 / 3.14

    : 1.146

    D : 1.07 M

    Diameter provided is 1100 mm

    Hence adequate

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    29

    SEWAGE TREATMENT PLANT

    Specification of Disinfection system (UV sterilizer)

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd, Chennai

    Sl.No Description SpecificationUV data

    1 Quantity 1 no2 Capacity 9 m3/hr3 Disinfection efficiency 99.99%4 No. of UV lamps 4 nos5 UV lamp APFC Electronic ballast 2 nos6 Inlet / Outlet Pipe Size 1 1/2”7 Lamp Life 9000 working hrs8 UV Chamber size As per the manufacturer’s standards9 Pressure 80 psi

    10 MOC of Wetted parts SS 30411 Make HECS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    30

    SEWAGE TREATMENT PLANT

    UF Feed Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd, ChennaiS. No Description Specification

    Pump Data1 Quantity 2 No (1 w + 1 s)2 Type Centrifugal Multistage3 Capacity 9 m3/hr4 Head 30 m5 Model KSMB 548

    6 Rating 5 HP7 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%8 Phase 3 phase9 MOC SS 304

    10 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    31

    SEWAGE TREATMENT PLANT

    UF Membrane

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd, ChennaiS. No Description Specification

    Membrane Data1 Quantity 3 No2 Type Tubular Hollow Fibre3 Capacity 9 m3/hr4 Size 8” Dia5 Height 1650 mm6 MOC of membrane PES7 MOC of housing PVC8 Model DFU80509 Operating Pressure 3 Kg/cm2

    10 Make Deerfos / eq.11 Accessories UF MS Skid12 Skid MOC MS Epoxy13 Make of Skid HECS

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    32

    SEWAGE TREATMENT PLANT

    UF Backwash Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd, ChennaiS. No Description Specification

    Pump Data1 Quantity 2 No (1W + 1S)2 Type Centrifugal Multistage3 Capacity 22.5 m3/hr4 Head 25 m5 Model KSMB 5486 Rating 5 HP7 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%8 Phase 3 phase9 MOC SS 304

    10 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    33

    SEWAGE TREATMENT PLANT

    UF Cleaning Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd, ChennaiS. No Description Specification

    Pump Data1 Quantity 1 No2 Type Centrifugal Multistage3 Capacity 13.5 m3/hr4 Head 25 m5 Model CM 10 – 36 Rating 3 HP7 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%8 Phase 3 phase9 MOC SS 316

    10 Make Grundfos / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    34

    SEWAGE TREATMENT PLANT

    UF CIP Tank

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Contractor : M/S. Hubert Enviro Care Systems (P) Ltd, ChennaiS. No Description Specification

    Tank Data1 Quantity 1 No2 Type Cylindrical Vertical3 Capacity 700 litres4 Diameter 1000 mm5 Height 1225 mm6 MOC HDPE7 Make Sintex / Reno / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    35

    SEWAGE TREATMENT PLANT

    Specification of UF Disinfection System

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd, Chennai

    S. No Description SpecificationPump Data

    1 Quantity 3 No2 Type Electronic Metering Type3 Capacity 0 – 10 lph4 Pressure 2.5 ksc5 MOC PP6 Make Prominent / Milton Roy / eq.

    Tank Data7 Quantity 3 No8 Type Cylindrical Vertical9 Capacity 100 litrs

    10 Diameter 520 mm11 Height 650 mm12 MOC HDPE13 Make Sintex / Reno / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    36

    SEWAGE TREATMENT PLANT

    Specification of UF Permeate Pump

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPump data

    1 Quantity 2 No (1W +1S)2 Type Centrifugal Monobloc3 Capacity 9 cum/hr4 Head 30 m5 MOC CI6 Speed 2760 rpm7 Model KDS 335++8 Make Kirloskar / eq.

    Motor data9 Type TEFC Squirrel Cage Induction type

    10 Motor rating 3 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    37

    SEWAGE TREATMENT PLANT

    Specification of Instruments

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPressure Gauges

    1 Quantity 1 lot2 Type Dial type3 Dial Size 4”4 Pressure Range 0 – 7 Kg/cm25 Location On all delivery of pumps6 End Connection 3/8” Screwed end7 Make Waree / H-guru / eq.

    Rotometer8 Quantity 2 nos9 Type Low Pressure Switch

    10 Location UF Feed, UF Backwash11 Range As per requirement12 Make Aster / eq.

    Electrical Operated Valves13 Quantity 5 nos14 Type ISD Solenoid type15 Size 1” & 1 ½”16 Voltage 230 V17 MOC SS18 Make Aira / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    38

    SEWAGE TREATMENT PLANT

    Specification of Pipes & Valves

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationWater line

    1 Quantity 1 lot2 MOC UPVC3 Pressure 10 kg/cm24 Accessories Flanges, Elbows, Tees, Unions etc5 Make of UPVC Pipes Finolex / Supreme / Astral / eq

    Air line6 Quantity 1 lot7 MOC GI8 Class B class9 Accessories Flanges, Elbows, Tees, Unions etc

    10 Make Jindal / eq.Non – Return Valves

    11 Quantity 1 lot12 Type Flap type13 Size As required based on the site conditions14 Make Intervalve / KSB / eq.

    Butterfly valves15 Quantity 1 lot16 Type Wafer Type17 Size As required based on the site conditions18 Make Intervalve / KSB / eq.

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    39

    SEWAGE TREATMENT PLANT

    Specification of Electrical panel & Instruments

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationPanel data

    1 Quantity 1 no2 Type Floor mounted3 Sheet thick 1.6 mm4 Incoming main switch 4 pole MCB5 Components MCB / OLR / Contactor6 Make of cables Orbit / Finolex / Polcab7 Ammeter Cadel / Eq8 Voltmeter Cadel / Eq9 Make of components Havells / C&S / Siemens

    10 Protection IP 5511 Painting Powder coated Siemens grey12 Cable entry Bottom13 Make of Panel HECS14 PLC For UF plant alone15 Make of PLC Allan Bradley / Siemens / GE

  • M/S. Urban Tree Infrastructures Pvt.Ltd., Chennai

    Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

    40

    SEWAGE TREATMENT PLANT

    Specification of Flow Meter

    Client : M/S. Urban Tree Infrastructures Pvt.Ltd., ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

    Sl.No Description SpecificationFlow Meter data

    1 Quantity 1 no2 Type Electromagnetic Type3 Capacity 0 – 9 cum/hr4 End Connection Flanged type5 End Connection Size 40 mm6 Lining Rubber7 Electrodes SS 316L8 Flanges MS9 Output 4 – 20 mA

    10 Rating 60 W11 Power Supply Single Phase / 220 V12 Model Eumag 40 – N – S – 1 - L13 Make Eureka / eq.

  • COLLECTION TANK

    AERATION TANK

    MBBR

    BAR SCRREN CHAMBER

    CLARIFIER TANK

    CLARIFIED WATER TANK

    FILTER FEED PUMP

    DRAIN LINEDRAIN LINE

    SEWAGE WATER-200K LD

    AIR BLOWER

    ACTIVATED CARBONFILTER

    PRESSURE SANDFILTER

    HECS(P)Ltd APPROVED/DATE

    ENGINEERING CHECKED/DATE

    DRAFTING CHECKED/DATEDESIGNED

    NAME DATE

    CHECKED

    CHENGAL

    CEO

    IMO No.CLASS I.D SCALE REV

    0

    TITLE: CLIENT:REVISION

    SURYA

    REV BY DATE

    ISSUED FOR APPROVAL22.01.150 DRAWN SURYA 22.01.15

    M/S.URBAN TREE INFRASTRUCTURES PVT.LTD..

    DWG No:DD-HECS-UTIPL-STP-PFD-001

    SEWAGE TREATMENT PLANT-200 KLD FORPROCESS FLOW DRAWING

    DESCRIPTION EDIT

    PROCESS FLOW DRAWING

    8.3M3/HR

    TREATED WATERSTORAGE TANK

    TREATED WATERTRANSFER PUMP

    FOR FLUSHINGAND GARDENING

    UV

    SLUDGE TRANSFER PUMP

    SLUDGE HOLDINGTANK

    SCREW PUMP

    FILTER PRESS

    RAW SEWAGETRANSFER PUMP

    UF

    22.01.15

    22.01.15

  • URBAN TREE-SUPERB 13.01.2015

    Sl. No Description Total powerconsumption peryear in lakh KWH(Assuming 200 unitsper flat and 150units per flat for EWSBLOCK per monthmonth)

    Total powersaving usingsolar Geyserper year in lakhKWH

    Total powersavings using VFDfor lifts & pumpsper year in lakhKWH

    Total Externalpower savingusing timerStilt floor &CorridorLighting peryear in lakhKWH

    Total Externalpower savingusing timerExternalLighting peryear in lakhKWH

    Total powersavings per yearin lakh KWH

    SAVINGS IN ELECTRICAL POWER CONSUMPTION

    1

    Doc:- PTC-767-E-103-01 Rev:R0 Page 1PPD BY:PR

    Sl. No Description Total powerconsumption peryear in lakh KWH(Assuming 200 unitsper flat and 150units per flat for EWSBLOCK per monthmonth)

    Total powersaving usingsolar Geyserper year in lakhKWH

    Total powersavings using VFDfor lifts & pumpsper year in lakhKWH

    Total Externalpower savingusing timerStilt floor &CorridorLighting peryear in lakhKWH

    Total Externalpower savingusing timerExternalLighting peryear in lakhKWH

    Total powersavings per yearin lakh KWH

    ResidentialBuilding 6.53 0.91 0.12 0.05 0.10 1.19

    PercentageSavings 14% 1.88% 0.77% 1.58% 18.24%

    1

    Doc:- PTC-767-E-103-01 Rev:R0 Page 1PPD BY:PR