    Fairway Design on Finnish CoastCouple of Case Studies

    M.Sc.(Civ.Eng) Esa Sirki

    FMA/Fairways Division

  • 8/11/2019 Sirkia Fairway Design

    2/24

    Why is the fairway design an issue here?

    Finnish coast is determined by four facts that makefairway design and construction different thanelsewhere:

    1. Shallowness of coast

    2. Wide archipelago

    3. Rocky/bedrock bottom Finland has the oldestbedrock in Europe

    4. Nowadays the cohesive materials are oftencontaminated

    These facts leads to Long, curvy fairways

    Lots and lots of AtoN

    Expensive dredging

  • 8/11/2019 Sirkia Fairway Design

    3/24

  • 8/11/2019 Sirkia Fairway Design

    4/24

    Other Finnish Specialties There is around 30 000 AtoN

    Finnish special AtoNs:

    Fixed side markers:

  • 8/11/2019 Sirkia Fairway Design

    5/24

    Other Finnish Specialties There is around 30 000 AtoN

    Finnish special AtoNs:

    Leading lines and lights:

  • 8/11/2019 Sirkia Fairway Design

    6/24

    Other Finnish Specialties There is around 30 000 AtoN

    Finnish special AtoNs:

    Ice Buoys

  • 8/11/2019 Sirkia Fairway Design

    7/24

    Case Kustaanmiekka:

    Gateway to HelsinkiSouthern Harbour

  • 8/11/2019 Sirkia Fairway Design

    8/24

  • 8/11/2019 Sirkia Fairway Design

    9/24

    Fairway dimensions:

    Minimum width: 80 m(3,27*B @ Kustaanmiekkastrait)

    Sweeping depth 11,0 m

    maximum draught 9,6 m;UKC of 1,4 meters

    Vessels with larger draught

    than design vessel areusually smaller ro-rovessels from southerncargo harbour

    Case Kustaanmiekka:Gateway to Helsinki Southern Harbour

  • 8/11/2019 Sirkia Fairway Design

    10/24

    Case Kustaanmiekka:Gateway to Helsinki Southern Harbour

    Aluksen squat nopeuden funktiona

    Gulievin menetelm, poikkileikkaustyyppi B

    0.0

    0.2

    0.4

    0.6

    0.8

    1.0

    1.2

    1.4

    1.6

    2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0

    Nopeus (solmua)

    Squat(m)

    Painuma(squat)vara Muu liikevara Klivara Haraustason alapuoleinen vesi Pohja SQUAT

  • 8/11/2019 Sirkia Fairway Design

    11/24

    Kustaanmiekka strait challenging

    alignment Fairway goes straight thru UN world heritage area ofSuomenlinna sea fortress

    Fairway was built to current stage 1980s Sea bottom is bedrock need of underwater blasting inconstruction phase

    Because of fortress, the width is very limited andalignment cannot be changed

    Asymmetrical cross section leads to suction effectsbetween vessel and bedrock side banks

    Navigational challenges

  • 8/11/2019 Sirkia Fairway Design

    12/24

  • 8/11/2019 Sirkia Fairway Design

    13/24

    Green area > 12,0 m

    Yellow 12,0 11,0 m

    Red 11,0 10,0 m

    Blue < 10,0 m

    Sweeping depth 11,0 m(yellow is still safe)

  • 8/11/2019 Sirkia Fairway Design

    14/24

    3D-image of Kustaanmiekka strait

    Cross section is restricted channel or it may be definedeven as a canal

    Leads to challenging navigational situations because ofsuctions caused by asymmetrical trench cross section

    Most simulated single point on Finnish coast

    Environmental facts do not allow improvements but

    need of them has faded thanks to new Port of Vuosaari

  • 8/11/2019 Sirkia Fairway Design

    15/24

    Next case: Rauma 10,0 m channel

    Total fairway length is 26 km (14,4 M)

  • 8/11/2019 Sirkia Fairway Design

    16/24

  • 8/11/2019 Sirkia Fairway Design

    17/24

    Area of interest - Kovankivet

    160 m wide restricted channel

    Excavated in bedrock

    Trench height approx 10 m highest

    Single most dangerous spot on Finnish coast

    Asymmetrical cross section Multiple simulations done

    Prevailing wind direction SW to NW

    Several blackouts that has lead to groundings

    AtoN equipment:

    Leading lines with 7,2 m panels and high powerlights; 6 fixed markers; 5 ice buoys

  • 8/11/2019 Sirkia Fairway Design

    18/24

    N

    3D-Image of Kovankivet

  • 8/11/2019 Sirkia Fairway Design

    19/24

    Design of Rauma Deepening

    future project

    New project that aims to deepening of Rauma fairway,

    general design 2008 Aim is to deepen the fairway for vessels up to 12,0 m

    draught

    Alignment remains same, new minimum width 144 m

    New sweeping depth of 14,0 / 13,5 m

    Leads quite massive dredging of around 2 million cubicmeters, around 10% of rock

    ~500 000 m3 of polluted cohesive material that needs

    special dumping ground or -reservoir Budget up to 40 M total (incl. port investments ~10 M)

    High hopes to get new deepened channel running 2012

  • 8/11/2019 Sirkia Fairway Design

    20/24

    Latest New Fairway Vuosaari

    a Typical Finnish Approach Channel

    Fairway was built to

    new Port of Vuosaari2002-2004

    Fairway leads fromHelsinki lighthouse to thePort of Vuosaari,

    total 33 km (~18 M) 3 straight sections,all with leading lights

    3 fixed side markers

    23 ice buoys

    All AtoN are lighted

    Lights of buoys aresynchronized

  • 8/11/2019 Sirkia Fairway Design

    21/24

    Vuosaari Approach Channel - design

    Design Vessel:

    Containership

    L = 230 m

    B = 33 m

    T = 11,0 m

    One lane traffic

    in last 4 km

    Fairway dimensions

    Minimum width 200 m (6 B)

    Radius of turn 1150 m

    Sweeping depth 13,0 / 12,5 m

    Dimensioning speed 15 / 12 kn

    Aluksen squat nopeuden funktiona.Huuska-ICORELS, kertoimet 1.7, 2.0 ja 2.4.

    0.0

    0.2

    0.4

    0.6

    0.8

    1.0

    1.2

    1.4

    1.6

    1.8

    2.0

    2.2

    5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0Nopeus (solmua)

    Squa

    t,m

    Painuma(squat)vara Muu liikevara Klivara Haraustason alapuoleinen vesi

    SQUAT (Co = 1.7) SQUAT (Co = 2.0) SQUAT (Co = 2.4) Pohja

  • 8/11/2019 Sirkia Fairway Design

    22/24

    Vuosaari Approach Channel last 5 km

    Minimum width (200 m)

    Waiting area

    Possible other

    channel, ifconsidered necessary

  • 8/11/2019 Sirkia Fairway Design

    23/24

    Vuosaari Approach Channel

    construction phase

    Vuosaari approach channel was built by Wasa Dredging Oy

    and Terramare Oyj.

    Amount of excavation: soil ~500 000 m3, rock ~250 000 m3

    Total budget 6 M

  • 8/11/2019 Sirkia Fairway Design

    24/24

    Thank you for your attention!