www.kgc.net.au 3/55 John St. Bentley WA 6102
P: +61 8 9258 4393 F: +61 8 9258 4417 E: [email protected]
4 LOCATION CAPE PRESTON, WA
4 CLIENT MCC MINING (WA) PTY LTD
4 STATUS: COMPLETED
4 PERIOD OF ASSIGNMENT YEAR 2012
4 CONTRACT VALUE $8 M
4 PROJECT OVERVIEW
INSTALLATION OF CARBON STEEL, STAINLESS AND PLASTIC PROCESS AND SERVICE PIPING IN THE CONCENTRATOR LINES 1 AND 2 AREAS
The project is consisted of
Over 3,000m of process piping to AS4041
Over 6,000m filed run service piping
Critical path, truncated timeframe with slow client procurement yet completed on time
Pipe insulation
4 MAIN SUBCONTRACTOR Burgess BLA CPC Goldfields
4 REFEREE Xingyong ZHAO Principal’s Representative MCCM Construction Department 1 Sino Iron Project at Cape Preston Tel: 08 9184 8827 Mobile: 0467 444 867 Email: [email protected]
4 PROJECT MANAGER Mark Fidler & Klaus Hartmann
4 SITE MANAGER Wenge Liu
4 CHIEF ENGINEER Harry Yang
PROJECT REFERENCE
PROJECT NAME: SINO IRON PROJECT CONCENTRATOR PIPEWORKS