Single Phase Revers

Embed Size (px)

Citation preview

  • 7/25/2019 Single Phase Revers

    1/2

    Single-Phase Capacitor Start-Capacitor Run MotorsConnection Diagram

    4APCC

    L1 N E L1 N ETo change direction of rotation simply re-position the 2 metal links in the terminal box.

    IMPORTANT ! Always check the motor nameplate for correct voltage and the inside ofthe terminal box lid for the correct wiring diagram.

    Ask if in doubt !Incorrect wiring will damage the motor and invalidate the Warranty!

    ROTOR (UK) LIMITED, 16 Everitt Close, Denington Industrial Estate, Wellingborough NN8 2QFTel 01933 230900 Fax 01933 272152 [email protected] www.rotor.co.uk

    MAIN WINDING

    STARTWINDING

    01 02 Z2

    U1 Z1 U2

    MAIN WINDING

    START

    WINDING

    01 02 Z2

    U1 Z1 U2

    In order to use a change-over switch it is necessary to reconnect the internal terminationon the terminal block in the following way:

    ROTOR (UK) LIMITED cannot be held responsible for any

    damages caused by incorrect wiring.

    The re-connection must be carried outby a qualified electrician !

    MAINWINDING

    STARTWINDING

    01 02 Z2

    U1 Z1 U2

    L N L(N) N(L)

    1. Disconnect cable fromand connect it to

    Start WindingZ2 02

    2. Disconnect cable fromand connect it to

    Main WindingU1 Z2

    Supply to at all times.Supply to at all times.Swap and to andto change direction of rotation.

    L U1N Z1

    L N U2 Z2

  • 7/25/2019 Single Phase Revers

    2/2

    Single-Phase Capacitor Start-Capacitor Run MotorsConnection Diagram

    7AACC

    L1 N E L1 N ETo change direction of rotation simply re-position the 2 metal links in the terminal box.

    IMPORTANT ! Always check the motor nameplate for correct voltage and the inside ofthe terminal box lid for the correct wiring diagram.

    Ask if in doubt !Incorrect wiring will damage the motor and invalidate the Warranty!

    ROTOR (UK) LIMITED, 16 Everitt Close, Denington Industrial Estate, Wellingborough NN8 2QFTel 01933 230900 Fax 01933 272152 [email protected] www.rotor.co.uk

    MAIN WINDING

    START

    WINDING

    MAIN WINDING

    START

    WINDING

    In order to use a change-over switch it is necessary to reconnect the internal terminationon the terminal block in the following way:

    ROTOR (UK) LIMITED cannot be held responsible for any

    damages caused by incorrect wiring.

    The re-connection must be carried outby a qualified electrician !

    MAINWINDING

    STARTWINDING

    U1 Z2 U2

    L(N) N(L) L N

    1. Disconnect cable fromand connect it to ( )

    Start WindingZ1 C the middle C

    2 Disconnect cable fromand connect it to

    Main WindingU2 Z1

    Supply to at all times.Supply to at all times.

    Swap and to andto change direction of rotation.

    L Z2N U2

    L N Z1 U1

    Z1 C C Z1 C CZ1 C C

    U1 Z2 U2 U1 Z2 U2

    Z1 C CZ1 C C