30
DIRECTOR IV, BOD DANTE B. POTANTE UNDERSECRETARY RAUL C. ASIS SHEET NO. SET NO. BOD 63 (SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREY SCHOOL BUILDING ( 9-CLASSROOMS ) VARIOUS DPWH PROPOSED PROJECTS DESIGNED: SUBMITTED: DESIGN CONCEPT: REVIEWED AS TO PABLO G. RACINES MANAGING PARTNER MANUEL V. PANIS ELECTRICAL ENGINEER POSITION: PRO. ELECTRICAL ENGINEER PRC No.: 01210 PTR No.: 4856593 TIN No.: 132-466-222 E-1 41 SHEET CONTENTS: PROJECT & LOCATION / BARANGAY: APPROVED:(FOR ISSUANCE) RECOMMENDING APPROVAL CHIEF, JOSEPHINE P. ISTURIS BUILDINGS DIVISION, BOD (REVISED 3-24-57) ELECTRICAL RISER DIAGRAM, FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL, SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND SINGLE LINE DIAGRAM NOT TO SCALE 3 E-1 ELECTRICAL RISER DIAGRAM NOT TO SCALE 1 E-1 FLUORESCENT LIGHT FIXTURE MOUNTING DETAIL NOT TO SCALE 2 E-1 2 1 2 1 3 5 2 4 1 3 5 2 4

SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

  • Upload
    others

  • View
    52

  • Download
    12

Embed Size (px)

Citation preview

Page 1: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-141

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-57)

ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND

SINGLE LINE DIAGRAMNOT TO SCALE

3E-1

ELECTRICAL RISER DIAGRAMNOT TO SCALE

1E-1

FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE

2E-1

2

1

2

1

3

5

2

4

1

3

5

2

4

Page 2: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL DESIGNPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-242

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

LOAD SCHEDULE

LOAD SCHEDULE

(REVISED 3-24-17)

RECOMMENDED SIZE OF TRANSFORMER

SHORT CIRCUIT CALCULATION

Page 3: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

POWER LAYOUT

TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100M.

2E-3

GROUND FLOOR POWER LAYOUT1E-3 SCALE 1:100M.

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-343

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

B

F

B

F

LPA

M

5000

4500 4500 4500 4500 45004500

37000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000

10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 5

UPUP

1700

1600

PWD

1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

STO.

1825975 1100 1100

425

1825 1400 1775

400

8600

425

4500 4500 4500 4500 45004500

37000

2500

9500

50009000 9000

1

9000

10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UP UPUP

LPA10

LPA9

FACPLPAATS

MDP

FPPFPP

FPP4

FPP3

MDP7

Page 4: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

LIGHTING LAYOUT

TYP. 2ND & 3RD FLOOR LIGHTING LAYOUTSCALE 1:100M.

2E-4

GROUND FLOOR LIGHTING LAYOUTSCALE 1:100M.

1E-4

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-444

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

WF WF

b

b

b

b

a

a

c

c

a

a

c

c

2 2 2 2 2 2

222222

11 1 1 111

WF

b

b

a

a

c

c

2 2 2

222

SFCSFC SFC

WFWFWF

WF WF

b

b

b

b

a

a

c

c

a

a

c

c

2 2 2 2 2 2

222222

1

11 1 1 111

WF

b

b

a

a

c

c

2 2 2

222

SFCSFC SFC

WFWFWF

LPA3

d

5000

4500 4500 4500 4500 45004500

37000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000

10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 5

UPUP

1700

1600

PWD

1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

STO.

1825975 1100 1100

425

1825 1400 1775

400

8600

425

4500 4500 4500 4500 45004500

37000

2500

9500

50009000 9000

1

9000

10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UP UPUP

Page 5: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-145

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND

SINGLE LINE DIAGRAMNOT TO SCALE

3E-1

ELECTRICAL RISER DIAGRAMNOT TO SCALE

1E-1

FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE

2E-1

2

1

2

1

3

5

2

4

1

3

5

2

4

Page 6: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-246

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

LOAD SCHEDULE

LOAD SCHEDULE

RECOMMENDED SIZE OF TRANSFORMER

SHORT CIRCUIT CALCULATION

Page 7: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

POWER LAYOUT

GROUND FLOOR POWER LAYOUTSCALE 1:100 M.

1E-3

TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100 M.

2E-3

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY

SCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PBLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-347

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

LPA6

LPA7

F F

LPB6

LPB7

F F

LPC6

LPC7

M

B B

4500 4500 4500 4500 4500 4500 45004500

46000

2500

9500

50009000 9000

1

9000 9000

8 9 10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 9 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UP UPUPUPUP

5000

4500 4500 4500 4500 4500 4500 45004500

46000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000 9000

8 9 10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 4 CLASSROOM 5

UPUP

1700

1600

PWD1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

1825975 1100 1100

425

1825 1400 1775

425

400

8600

550

2500

LPA12

LPA11

FPP

FPP4

FPP3

MDP7

Page 8: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

LIGHTING LAYOUT

GROUND FLOOR LIGHTING LAYOUTSCALE 1:100 M.

1E-4

TYP. 2ND & 3RD FLOORLIGHTING LAYOUTSCALE 1:100 M.

2E-4

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY

SCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-448

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

WF

WF

WF

WF

WF

WF

WF

WF

b

b

b

b

b

b

b

b

b a b a b a b a b

4LPA

5LPA

a

a

c

cLPA

1LPA

2

a

a

c

c

a

a

c

c

a

a

c

c2

2

2

2 2

2 2

2 2 2 2 2

2222

3LPA

1

2

2 2

2

2

2

2

2

1 1 1 1 1 1 1 1

a1

1

1

1

1

1

1

WF

WF

4LPC

WF

WF

WF

WF

WF

WF

a

a

b

b

c

c

b

b

b

b

b

b

a

LPC1

LPC2

5LPC

b a b a b a b a

a

a

c

c

a

a

c

c

a

a

c

c

1 1 1 1 1 1 1 1 1 1

2

2 2

2 2

2 2 2

22 2

2 2 2 2 2 2 2

222222

b

1

1

11

3LPC

11

11

LPB1

3LPB

4LPB

LPB2

5LPB

c

4500 4500 4500 4500 4500 4500 45004500

46000

2500

9500

50009000 9000

1

9000 9000

8 9 10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 9 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UP UPUPUPUP

5000

4500 4500 4500 4500 4500 4500 45004500

46000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000 9000

8 9 10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 4 CLASSROOM 5

UPUP

1700

1600

PWD1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

1825975 1100 1100

425

1825 1400 1775

425

400

8600

550

2500

Page 9: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-149

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND

SINGLE LINE DIAGRAMNOT TO SCALE

3E-1

ELECTRICAL RISER DIAGRAMNOT TO SCALE

1E-1

FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE

2E-1

2

1

2

1

3

5

2

4

1

3

5

2

4

Page 10: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-250

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

LOAD SCHEDULE

LOAD SCHEDULE

RECOMMENDED SIZE OF TRANSFORMER

SHORT CIRCUIT CALCULATION

Page 11: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

POWER LAYOUT

GROUND FLOOR POWER LAYOUTSCALE 1:100 M.

1E-3

TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100 M.

2E-3

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-351

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

4500 4500 4500 4500 4500 4500 4500 4500 45004500

55000

2500

9500

50009000 9000

1

9000 9000 9000

6 7 8 9 10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 8 CLASSROOM 9 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UPUP

3950 (TYPICAL)

675

UPUP

5000

4500 4500 4500 4500 4500 4500 4500 4500 45004500

55000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000 9000 9000

6 7 8 9 10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5

UPUP

1700

1600

PWD1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

1825975 1100 1100

425

1825 1400 1775

5300

4300

8600

4300

400

425

LPA12

LPA11

FPP

FPP4

FPP3

MDP7

Page 12: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

LIGHTING LAYOUT

GROUND FLOOR LIGHTING LAYOUTSCALE 1:100 M.

1E-4

TYP. 2ND & 3RD FLOOR LIGHTING LAYOUTSCALE 1:100 M.

2E-4

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY

SCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593

TIN No.: 132-466-222

E-452

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

4500 4500 4500 4500 4500 4500 4500 4500 45004500

55000

2500

9500

50009000 9000

1

9000 9000 9000

6 7 8 9 10 11 12 135432

A

B

C

HESHE

STO.

5000

CLASSROOM 6 CLASSROOM 7 CLASSROOM 8 CLASSROOM 9 CLASSROOM 10

DN

LANDING

12001125

425

1125 2100 1237

425

7000

3850

2500

3150

1400

1750

1400

1750

3150

3850

DN

LANDING

1125 1238

UPUP

3950 (TYPICAL)

675

UPUP

5000

4500 4500 4500 4500 4500 4500 4500 4500 45004500

55000

7000

3850

2500

3150

3600

1200

SHE

2500

9500

HE

PWD

50009000 9000

1

9000 9000 9000

6 7 8 9 10 11 12 135432

A

B

C

LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5

UPUP

1700

1600

PWD1400

1750

3150

3850

UP

LANDING

UP

1400

1750

3600

1200

1700

1825975 1100 1100

425

1825 1400 1775

5300

4300

8600

4300

400

425

Page 13: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD

63

(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-11

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD (REVISED 3-24-17)

I.

FIFTEEN-CLASSROOMS

Mobilization / Demobilization

A.

II. Temporary Facilities

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

B I L L O F Q U A N T I T I E S

VIII. Fabricated Materials and Hardwares

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

²

²

²

²

²

²

²

³

Page 14: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-22

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

PABLO G. RACINESMANAGING PARTNER

STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

B I L L O F Q U A N T I T I E S

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

XV.

Mechanical Works

²

²

²

²

²

²

²

²

²

²

²

²

²

Page 15: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-33

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

PABLO G. RACINESMANAGING PARTNER

STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63

I.

TWELVE-CLASSROOMS

Mobilization / Demobilization

A.

II. Temporary Facilities

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

B I L L O F Q U A N T I T I E S

VIII. Fabricated Materials and Hardwares

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

²

²

²

²

²

²

²

³

Page 16: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-44

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

PABLO G. RACINESMANAGING PARTNER

STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

B I L L O F Q U A N T I T I E S

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

XV. Mechanical Works

²

²

²²

²

²

²

²

²

²

²

²

Page 17: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-55

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

PABLO G. RACINESMANAGING PARTNER

STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63

I.

NINE-CLASSROOMS

Mobilization / Demobilization

A.

II. Temporary Facilities

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

B I L L O F Q U A N T I T I E S

VIII. Fabricated Materials and Hardwares

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

²

²

²

²

²

²

²³

³

Page 18: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423

TIN No.: 907-359-364

G-66

BILL OF QUANTITIES

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL

CHIEF,JOSEPHINE P. ISTURIS

BUILDINGS DIVISION, BOD

PABLO G. RACINESMANAGING PARTNER

STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

B I L L O F Q U A N T I T I E S

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

XV. Mechanical Works

²

²

²

²

²

²

²

²

²

²

²

²

Page 19: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

54GROUND FLOOR, SECOND FLOOR & THIRD FLOOR

FIRE PROTECTION PLAN, FIRE PROTECTION DETAIL,TABULATED SPRINKLER HEADS OF THE

AUTOMATIC FIRE SPRINKLER SYSTEM, GENERALNOTES, LEGEND

FP-163

1 6 7 8 95432

A

B

C

STO.

DN DN UPUP

UPUP

UP

1 6 7 8 95432

A

B

C

SHEHE

PWD

LANDING

PWD

FHC

SHEHEPWD

LANDING LANDING

FEFEFE

FHC

UP

DIESELENGINE

JPFP

FHC

FEFEFE

FHC

GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

1FP-1

FHC

FDC

FE

RN

JPFP

FE

SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

2FP-1

PENDENT SPRINKLER HEAD UPRIGHT SPRINKLER HEAD SIDEWALL SPRINKLER HEAD

DET. OF FIRE DEPT. CONNECTION

FIRE HOSE CABINET DETAIL

FIRE EXTINGUISHER DETAIL

E L E V A T I O N

CLASSROOMCLASSROOM CLASSROOM

CLASSROOMCLASSROOMCLASSROOM

Page 20: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

55FIRE PROTECTION DETAIL, SCHEMATIC PIPING

LAYOUT OF FIRE PROTECTION, FIRE HOSE CABINET(FHC) DRY STAND PIPE RISER DIAGRAM CONN.

SCHEDULE OF EQUIPMENT

FP-163

6

INSPECTOR TEST CONNECTION DET.

PIPE HANGER

TWO WAY BRACE PIPE HANGER

ALARM CHECK VALVE SCHEMATIC DIAGRAMFLOOR CONTROL VALVE

DET. OF FLUSHING CONNECTIONPIPE SLEEVEFOUR WAY BRACE

FIRE PROTECTION DETAILNOT TO SCALE

1FP-3

FIRE HOSE CABINET (FHC)DRY STAND PIPE RISER DIAGRAM CONN.

SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION

Page 21: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

53PARTIAL GROUND FLOOR (SHOWING LOCATION OF

CISTERN, PARTIAL ROOF PLAN, ELEVATION OFOVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE

OF EQUIPMENT

WP-163

8 9

A

B

C

98

A

B

C

PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.

1WP-1

PARTIAL ROOF PLANSCALE 1:100 M.

2WP-1

ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE

3WP-1

500

ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE

4WP-1

MCMC MCMC MCB

ALT1&2

1P

212

P

345

S 3 S

67 9

8679

8

BH TYPE2 RH RELAY

BW TYPERH RELAY

TOPUMP "1"TO

PUMP "2"

SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE

5WP-1

Page 22: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

57FP-1GROUND FLOOR, SECOND FLOOR & THIRD FLOOR

FIRE PROTECTION PLAN 63

1 6 7 8 9 10 115432

A

B

C

STO.

DN DN UPUP

UPUP

UP

1 6 7 8 9 10 115432

A

B

C

SHEHE

PWD

LANDING

PWD

FHC

SHEHEPWD

LANDING LANDING

FEFEFEFE

FHC

UP

DIESELENGINE

JPFP

FHC

FEFEFEFE

GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

1FP-1

SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

2FP-1

CLASSROOMCLASSROOMCLASSROOMCLASSROOM

CLASSROOM CLASSROOM CLASSROOM CLASSROOM

Page 23: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

FIRE PROTECTION DETAIL,SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION,

GENERAL NOTES, LEGEND,TABULATED SPRINKLER HEADS OF THEAUTOMATIC FIRE SPRINKLER SYSTEM

58FP-2

63

FHC

FDC

FE

RN

JPFP

FE

PENDENT SPRINKLER HEAD

SIDEWALL SPRINKLER HEADUPRIGHT SPRINKLER HEAD

1 11

DRY STAND PIPE RISER DIAGRAM CONN.NOT TO SCALE

3FP-2

FIRE HOSE CABINET (FHC)

FIRE EXTINGUISHER DETAIL

E L E V A T I O N

FIRE HOSE CABINET DETAIL

DET. OF FIRE DEPT. CONNECTIONSCHEMATIC PIPINGLAYOUT OF FIRE PROTECTIONNOT TO SCALE

2FP-2

FIRE PROTECTION DETAILNOT TO SCALE

1FP-2

Page 24: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

59FP-3FIRE PROTECTION DETAIL,

SCHEDULE OF EQUIPMENT 63

FLOOR CONTROL VALVEALARM CHECK VALVE SCHEMATIC DIAGRAM

TWO WAY BRACE PIPE HANGER

PIPE HANGER

DET. OF FLUSHING CONNECTION

INSPECTOR TEST CONNECTION DET.

PIPE SLEEVEFOUR WAY BRACE

FIRE PROTECTION DETAILNOT TO SCALE

1FP-3

Page 25: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983

56WP-1

PARTIAL GROUND FLOOR (SHOWING LOCATION OFCISTERN, PARTIAL ROOF PLAN, ELEVATION OF

OVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE

OF EQUIPMENT

63

1110

A

B

C

1 2

PARTIAL ROOF PLANSCALE 1:100 M.

2WP-1

10 11

A

B

C

PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.

1WP-1

ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE

3WP-1

GVGV

500

ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE

4WP-1

MCMC MCMC MCB

ALT1&2

1P

212

P

345

S 3 S

67 9

8679

8

BH TYPE2 RH RELAY

BW TYPERH RELAY

TOPUMP "1"TO

PUMP "2"

SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE

5WP-1

DESIGNATION

Page 26: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

61GROUND FLOOR, SECOND FLOOR & THIRD FLOORFIRE PROTECTION PLAN FP-1

63

1 6 7 8 9 10 11 12 135432

A

B

C

STO.

DN DN UPUP

UPUP

UP

1 6 7 8 9 10 11 12 135432

A

B

C

SHEHE

PWD

LANDING

PWD

FHC

SHEHEPWD

LANDING LANDING

FHC

FEFEFEFEFE

UP

DIESELENGINE

JPFP

FEFEFEFEFE

GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

1FP-1

SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.

2FP-1

CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM

Page 27: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

62FP-2

FIRE PROTECTION DETAIL,SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION,

GENERAL NOTES, LEGEND,TABULATED SPRINKLER HEADS OF THEAUTOMATIC FIRE SPRINKLER SYSTEM

63

FIRE EXTINGUISHER DETAILE L E V A T I O N

FIRE HOSE CABINET DETAIL

PENDENT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

DET. OF FIRE DEPT. CONNECTION

UPRIGHT SPRINKLER HEAD

1 13

FHC

FDC

FE

RN

JPFP

FE

FIRE PROTECTION DETAILNOT TO SCALE

1FP-2

SCHEMATIC PIPINGLAYOUT OF FIRE PROTECTIONNOT TO SCALE

2FP-2

DRY STAND PIPE RISER DIAGRAM CONN.NOT TO SCALE

3FP-2

FIRE HOSE CABINET (FHC)

Page 28: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

63FP-3FIRE PROTECTION DETAIL,

SCHEDULE OF EQUIPMENT 63

FLOOR CONTROL VALVEALARM CHECK VALVE SCHEMATIC DIAGRAM

TWO WAY BRACE PIPE HANGER

PIPE HANGER

DET. OF FLUSHING CONNECTION

INSPECTOR TEST CONNECTION DET.

PIPE SLEEVEFOUR WAY BRACE

FIRE PROTECTION DETAILNOT TO SCALE

1FP-3

Page 29: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET)

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286

TIN No.: 145-553-983BUILDINGS DIVISION, BOD

STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

(REVISED 3-24-17)

60PARTIAL GROUND FLOOR (SHOWING LOCATION OF

CISTERN, PARTIAL ROOF PLAN, ELEVATION OFOVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE

OF EQUIPMENT

WP-163

DESIGNATION

MCMC MCMC MCB

ALT1&2

1P

212

P

345

S 3 S

67 9

8679

8

BH TYPE2 RH RELAY

BW TYPERH RELAY

TOPUMP "1"TO

PUMP "2"

12 13

A

B

C

GVGV

1312

A

B

C

1 2

500

PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.

1WP-1

PARTIAL ROOF PLANSCALE 1:100 M.

2WP-1

ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE

3WP-1

SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE

5WP-1

ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE

4WP-1

Page 30: SINGLE LINE DIAGRAM 3 · 2018. 6. 26. · single line diagram, general notes, legend single line diagram not to scale 3 e-1 electrical riser diagram not to scale 1 e-1 fluorescent

SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)

DIRECTOR IV, BODDANTE B. POTANTE

UNDERSECRETARYRAUL C. ASIS

RECOMMENDING APPROVAL SHEET NO.SET NO.

BOD(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )

(REVISED 3-24-17)

VARIOUS DPWHPROPOSED PROJECTS

CHIEF,JOSEPHINE P. ISTURIS

DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO

PABLO G. RACINESMANAGING PARTNER

ROMEO C. OCAMPOPLUMBING DESIGNPOSITION: SANITARY ENGINEERPRC No.: 000697PTR No.: 2181627

TIN No.: 131-678-239BUILDINGS DIVISION, BOD

P-134

GEN. NOTES & LEGEND, MISC. DETAILSTYP. SEPTIC TANK DETAIL, SEPTIC TANK DIMENSION

UNDERGROUND WATER TANK DETAILUNDERGROUND WATER TANK CAPACITY

UNDERGROUND WATER TANK DIMENSIONELEVATED WATER TANK DIMENSION

63

1. ALL PLUMBING WORKS TO BE DONE AND SIZES OF PIPESTO BE USED SHALL BE IN ACCORDANCE WITH THE LATESTEDITION OF THE NATIONAL PLUMBING CODE OF THEPHILIPPINES AND LOCAL REGULATIONS AND ORDINANCES.

2. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THEWORKING DRAWINGS. ANY RELOCATION REQUIRED FORPROPER EXECUTION OF OTHER TRADES SHALL BE UPONTHE APPROVAL OF THE SANITARY ENGINEER.

3. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVERSCALED DIMENSIONS.

4. ALL PIPES SHALL BE PROVIDED W/ PROPER HANGER ANDSUPPORT

5. ALL FIXTURES SHALL BE VENTED INDIVIDUALLY ANDWATERLINES SHALL BE VALVE BY GROUP

6. UNLESS OTHERWISE SPECIFIED, ALL PLUMBING FIXTURESSHALL BE PROPERLY VENTED. MAXIMUM DISTANCE OFVENTILATION FROM FIXTURES SHALL BE 1.50 m MEASUREDALONG THE LENGTH OF PIPE.

7. ALL PLUMBING FITTINGS SHALL BE ACCESSIBLE FORMAINTENANCE. PROVIDE MANHOLE IF SUCHINSTALLATIONS ARE INSIDE THE CEILING.

8. ALL CHANGES IN DIRECTIONS SHALL BE MADE BY THEAPPROPRIATE USE OF FORTY FIVE (45) WYE LONG SWEEPQUARTER BEND. ONE EIGHT WHEN THE CHANGE OF FLOWIS FROM HORIZONTAL TO VERTICAL A SINGLE BENDCOMBINATION MAY BE USED ONLY ON VENT PIPE.

9. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USEDON HORIZONTAL SOIL OR WASTE LINES.

10. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB TOPROTECT FROM BREAKAGE.

11. ALL EXPOSED PIPINGS AND FITTINGS IN THE AREAS SHALLBE CHROME PLATED.

12. THE BRAND AND OTHER DETAILED PLUMBING FIXTURESSHALL BE IN ACCORDANCE WITH THE SCHEDULEFURNISHED BY THE ARCHITECT.

13. GATE VALVE SHALL BE BRONZE BODY, SOLID WEDGETYPE, SCREWED OR FLANGE END.

14. USE POLYPROPYLENE RANDOM,TYPE 3,PN20 FOR ALLWATER PIPING SYSTEM.

15. USE uPVC SANITARY PIPING SYSTEM SERIES 1000 FOR 100Ø AND SMALLER AND GRAVITY SEWER MAIN uPVC PIPINGSYSTEM FOR 150 Ø AND BIGGER.

16. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION ANDELEVATION OF STREET DRAINAGE, STREET SEWER ANDSTREET WATER MAINS FOR CONNECTION BEFORECONSTRUCTION.

GENERAL NOTES :

PLAN

SECTION

PLAN

SECTION

100x100

125x125

150x150

200x200

50

75

150

100

D F

DIMENSION IN MMPIPESIZE IN

'A'

225.42

225.42

225.42

282.57

SCHEDULE OF DIMENSIONS

5400 L10800 L16200 L

21600 L27000 L

3-STOREY / 3 CLASSROOM3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM

3-STOREY / 12 CLASSROOM3-STOREY / 15 CLASSROOM

3.30

L W H Lc

2.00 1.50 1.504.80 2.50 1.80 1.80

6.50 2.50 2.00 1.506.60 3.007.00 3.50

2.00 1.802.20 2.00

1350 L2700 L4050 L

5400 L6750 L

2.90

L W H

1.60 1.20

3.00 2.50 1.403.90 2.80 1.504.30

5.00

3.00

3.00

1.70

1.80

PLAN

SECTION

CATCH BASIN DETAILSCALE N T S

1P-1

FLOOR DRAIN DETAILSCALE N T S

2P-1

ROOF DRAIN DETAILSCALE N T S

3P-1

TYPICAL SEPTIC TANK DETAILSCALE N T S

6P-1

SEPTIC TANK DIMENSIONSCALE N T S

7P-1

TYP. UNDERGROUND WATER TANK DETAIL (DOMESTIC)SCALE N T S

8P-1

PLAN SECTION

UNDERGROUND WATER TANK CAPACITY (DOMESTIC)SCALE N T S

9P-1

UNDERGROUND WATER TANK DIMENSION (DOMESTIC)SCALE N T S

10P-1

ELEVATED WATER TANK CAPACITY (DOMESTIC)SCALE N T S

11P-1

3-STOREY / 3 CLASSROOM

3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM

3-STOREY / 15 CLASSROOM

DESIGNATION

CAPACITYDESIGNATION

3-STOREY / 3 CLASSROOM3-STOREY / 6 CLASSROOM

3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM3-STOREY / 15 CLASSROOM

3-STOREY / 3 CLASSROOM

3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM

3-STOREY / 15 CLASSROOM

50 Ø

50 Ø50 Ø

50 Ø

50 Ø50 Ø50 Ø

50 Ø

65 Ø

65 Ø

CAPACITYDESIGNATION SERVICE PIPE (mm)RISER / DF /

SUPPLY PIPE (mm)

LEGEND:WATER DISTRIBUTION SYSTEM

GV

WATERLINE

FIRELINE

GATE VALVEFV FLOAT VALVE

WSP WET STAND PIPE

DSP DRY STAND PIPE

WASTE, SEWER & VENT SYSTEMSANITARY LINEVENT LINE

FLOOR CLEAN-OUT

SHOWER/FLOOR DRAINFD

FCO

VENT STACKVSSOIL STACKSS

VENT ACROSS CEILINGVACVENT PIPEVP

POLYVINYL CHLORIDEPVCWET PIPEWP

SOIL PIPESPVENT THRU ROOFVTR

SEPTIC TANKST

WASTE, SEWER & VENT SYSTEM

DRAINAGE LINE

DOWNSPOUTDS

CATCH BASINCB

ROOF DRAINRD

PLUMBING FIXTURESLAVATORYLAV

WATER CLOSETWCELEVATED WATER TANKEWT

FHC FIRE HOSE CABINET

CORRIDOR DRAINCD

BI BLACK IRON PIPE

SECTION

PLAN

SECTION

SPOT DETAIL

CLEAN-OUT DETAILSCALE N T S

5P-1

AIR CHAMBER DETAILSCALE N T S

4P-1

AIR CHAMBERAC

PARTICULARS2.40

THICKNESS, T1 MM

LENGTH WIDTH DEPTH

THICKNESS, T2 MMTHICKNESS, T3 MM

TOP SLAB, ALONG LONG SPAN, 12MMØALONG LONG SPAN, 12MMØ

VERTICAL BARS, 12MM

HORIZONTAL BARS 12MM

BOTTOM SLAB, ALONG LONG SPAN, 12MMØALONG LONG SPAN, 12MMØ

150150200200

200

2.903.003.50 3.90 4.00 4.305.00150150

150150 150

200175 150

225

175 175150

150

200175250125 112

200 200175 175

200 225 250 250175 125

200 175 175 175 150 150 150

1.501.60 2.00 2.502.80 3.00150 150 150 150 175 175150 150 150 150 175

200 200 200 175 150 150

200 200 150 150 125 125

1.00 1.201.40 1.501.70 1.80

200 200 200 175 150 150200 200 200 200 175