DISCUSSION TIME Topics:

Funding Issues

Targeted Homeowners

Targeted Units

Rehab Standards

Other Issues

Page 3: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

STOP! The next slide contains information gleaned from previous SFR Roundtables.

Only move forward when the Discussion Time is complete.

Page 4: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

2015 NCCDA & Phranc Spring Conference, 5/22/15, 31 attendees

Min/Max per Partner ◦ Allow regional applications at 160 thousand per included county. 1 application for multi-county.

Fix Vs Pool◦ Keep the pool◦ Love pool gives opportunity◦ Like pool max out at 15 per grant◦ Keep Loan Pool◦ Case by case flexibility on increasing max◦ Continue cost allocation and pool◦ Mix, weighted more to pool, those who do get◦ Mix of fixed amount into loan pool◦ Like the Loan Pool◦ Like the Loan Pool, reward efficiency and effectiveness◦ Like the Loan Pool approach◦ Like the Loan Pool

Page 5: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

5/22/15 Min/Max per Unit, Fix Vs Average

◦ 20K URP with no 30% income requirement◦ Make max 50K we can spend◦ SFR amount – 50K +◦ Allow an average per unity funding limit

Target Homeowners◦ Not elderly and disabled only◦ 30% and 50% LMI◦ Target homeowners 60% LMI◦ More flexibility in selecting homeowners◦ Eliminate special needs requirement◦ Target less than 50%◦ 80% LMI – Stay with it◦ Help all people below 80%◦ Less restrictive special needs for homeowners◦ Cap at 50% median◦ Drop “elderly” to 60◦ For children under 6 in pre 78 allow with minimal lead result. 6

Page 6: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

5/22/15 Comp Vs Essential

◦ Like “Essential” Rehab – based on homeowner needs◦ Only target homeowner needs, main issues!◦ Target Homes◦ Allow broad program from 5K URP to 45K SFR◦ Target needs of homeowners◦ Essential Rehab - what is needed◦ Do $ 35,000 Homes with SS requirements

Unit Requirements◦ Mobile Home Help◦ Replacement vs repair◦ Mobile homes on fixed foundations?◦ Less energy regs equals more homes to potentially be served. What is the end goal? Serve public or serve regs◦ Homeowner and home qualifications better matched to standard requirements◦ Cut the requirements so you can do more homes◦ Eliminate HPwES – Go back to a practical energy efficiency rehab standard◦ What is essential need? Just fix that◦ What to do with a home beyond money available in URP/SFR, but need a better home! Early 1900’s – Home to something better

Page 7: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

5/22/15 Other

◦ Other Quicker Response Re: HPwES◦ URP increase to BURP ($ 20K)◦ Increase URP◦ No regional apps; local, govt, non-profits won’t benefit◦ Get rid of Advanced Energy◦ Raise URP limit some homes fall in between◦ Reduce recapture period to 10 years max◦ Higher URP Limits URP service area expand county # limits◦ Increase URP cost and eliminate SFR

Page 8: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

Round Table at Western Piedmont COG, 8/20/15, 13 attendees

ISSUES

o Evaluate HPwES impact Compare 2012 (Blaster door/ bills/sq. ft.) to 13’s and 14’s. Does HPwES really improve work?

o Shrinking contractor rosters with increasing standards

o I like that NCHFA does the title work and provides most forms

o Energy Standards push back by contractor

o Do small rehabs that don’t have to meet energy standards but can spend more than

o $ 8,000 but only up to $ 20,000?

o Hard time finding houses to meet program guidelines

Page 9: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

8/20/15ISSUES, continued

o Takes too long to get requisition funds back

o Allow more time to get into the pool

o HPwES makes life harder. Takes too long to get requested $ back

o Failed units costs money

o Get rid of HPwES or at least get rid of the HPwES and Advanced Energy Inspections

o Can’t bring homes to last 20 years as wanted with increased costs of doing business and materials

o Delay in receiving payments for partners frustrating for contractors

o HPwES Certificate?

Page 10: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

8/20/15 MONEY

o Keep the Pool

o Keep the pool love it. (Any version ok)

o Raise limit of hard cost per house

o Reduce $$ per house

o Challenges finding homes in certain counties that can be brought to standards with max funds

o Increase money per house

o Need more money

o Funding level: hard to do rehab & energy work, loss of HELP Funds hurt Program

o Create base pool amounts exceed past year numbers! If you do 8 SFRLP13’s you get a bigger base than those who did 3

Page 11: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

8/20/15 PROGRESS

o Do not turn SFR into URP

o Allow demo, replace with mobile home

o Eliminate special needs or add more, many applicants meet eligibility but are not elderly or disabled

o Please do no merge URP into SFR (In some places the URP is handled by our partners)

o Allow home replacement or reconstruction for dilapidated homes and old manufactured homes

o Since scattered site is gone, a reconstitution program for replacement housing (Especially mobile homes)

o Tilt the program toward disabled homeowners and older homeowners

Page 12: Single Family Rehab Roundtable WEIGH IN ON REDESIGN

8/22/15 STANDARDS

o Maintain focus on health, safety and durability

o Different Standards for homes pre 78

o Back off the energy stuff

o Sometimes I think the house is too tight not enough air flow

o Do away with advanced energy and other inspector

o Reduce standards to allow CDBG type home to be rehabbed no replacement homes

o Bring back blower door test standards

o Focus on warranty length of items vs the SEER rating (for example) or E Star for example