36
Singapore Changi Airport Preparation For & Experience With the A380 Mr Andy YUN Assistant Director (Apron Control Management Service / Safety) Civil Aviation Authority of Singapore

Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

Singapore Changi AirportPreparation For & Experience With the A380

Mr Andy YUN

Assistant Director

(Apron Control Management Service / Safety)

Civil Aviation Authority of Singapore

Page 2: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

2

Presentation Outline

1. Infrastructure Upgradeo Runwayo Taxiwayo Aprono Aerobridgeo Baggage Handlingo Gate Holdroom

2. New Handling Equipment3. Ground Working Group4. Training of Operators5. Trial Flights & Challenges

Page 3: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

3

1. Infrastructure Upgrade

Page 4: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

4

Planning ahead to serve the A380.• Changi Airport was the launch pad for the inaugural A380 commercial

flight.• Planning started as early as the late 1990s.• New infrastructure designed to provide high levels of safety, efficiency

and service for A380 operation.• Existing infrastructure was upgraded at a total cost of S$60 million.

Airfield Infrastructure• Upgrade to meet international standards for safe and efficient operation of

the bigger aircraft.

Passenger Terminals• Increase processing capacity, holding and circulation spaces within the

terminals to cater to larger volume of passengers.

Infrastructure UpgradeInfrastructure Upgrade

Page 5: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

5

Airfield Separation Distances• Changi’s runways, taxiways and airfield objects are designed with

adequate safety separation to meet A380 requirements.

Runway Taxiway Taxiway Object60m 30m 30m

200m >101m 57.5m

Infrastructure Upgrade - AirfieldInfrastructure Upgrade - Airfield

Page 6: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

6

Runway Length and Width• Changi’s 4km long by 60m wide runways exceed A380 take-off

and landing requirements.

Runway Shoulders• Completed widening of runway shoulders to provide additional

paved area in case of aircraft veering off the runway and to protect aircraft engines against ingestion of foreign objects during take-off.

Infrastructure Upgrade - RunwayInfrastructure Upgrade - Runway

Page 7: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

7

60m-wide runwayFormer 3m-wide paved runway shoulders

Additional 4.5m-wide paved runway shoulders

A380 outboard enginesB747 outboard engines

Infrastructure Upgrade - RunwayInfrastructure Upgrade Infrastructure Upgrade -- RunwayRunway

SINGAPORE CHANGI AIRPORT

RUNWAY 1

RUNWAY 2

02L

Runway Shoulders

Page 8: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

8

Taxiway Pavement

• Changi’s 30m wide taxiways exceed A380 requirements.

• Taxiway pavement at turning junctions are being widened to provide additional safety distance between A380 outer wheels and taxiway edge.

• Existing paved and turfed taxiway shoulders support A380 operations.

Infrastructure Upgrade - TaxiwayInfrastructure Upgrade - Taxiway

SINGAPORE CHANGI AIRPORT

TAXIWAYS

TAXIWAYS

Page 9: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

9

Taxiway pavement being widened at junctions

SINGAPORE CHANGI AIRPORT

TAXIWAYS

TAXIWAYS

Taxiway Pavement at Turning Junctions

Infrastructure Upgrade - TaxiwayInfrastructure Upgrade - Taxiway

Page 10: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

10

30m-wide taxiway

A380 outboard enginesB747 outboard engines

Existing 3m-wide paved taxiway shoulders

12m-wide combination of paved and turfed taxiway shoulders

TAXIWAYS

SINGAPORE CHANGI AIRPORT

TAXIWAYS

• Combination of paved and turfed taxiway shoulders in use.

Taxiway Shoulders

Infrastructure Upgrade - TaxiwayInfrastructure Upgrade - Taxiway

Page 11: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

11

Taxiway Bridges

• Changi’s taxiway bridges are designed from the onset for the next generation of larger aircraft, such as the A380.

• Shielding is provided along the sides of the bridges to contain the jet blast of A380 and protect road users below the bridges.

SINGAPORE CHANGI AIRPORT

TAXIWAY BRIDGES

Infrastructure Upgrade - TaxiwayInfrastructure Upgrade - Taxiway

Page 12: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

12

Aircraft Pavement

• Changi’s runways, taxiways and aircraft parking apron pavements are designed for A380 loading.

SINGAPORE CHANGI AIRPORT

APRONS

APRONS

APRONS

RUNWAY 1

RUNWAY 2

TAXIWAYS

TAXIWAYS

Infrastructure Upgrade - TaxiwayInfrastructure Upgrade - Taxiway

Page 13: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

13

Apron Facilities

Infrastructure Upgrade - ApronInfrastructure Upgrade - Apron

• Pre-arrival equipment staging area enlarged by around 30%.

• Fuel hydrant pits adjusted to suit A380 refueling inlets.

• Ground handlers acquiring new equipment for servicing the upper deck directly.

• Aircraft docking guidance systems configured for A380 use.

Page 14: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

14

Aerobridge configuration comparisonsOption 1 – 2 aerobridges for access to Main Deck onlyOption 2 – 2 aerobridges for access to Main and Upper DecksOption 3 – 3 aerobridges for access to Main and Upper Decks

[Source: Airbus]

0

5

10

15

20

25

Boarding Time De-boarding Time

B74

7-40

0

A380

Opt

ion

1

Opt

ion

2

Opt

ion

3

B74

7-40

0

Opt

ion

1

Opt

ion

2

Opt

ion

3

A380

Time [minutes]

Infrastructure Upgrade - AerobridgeInfrastructure Upgrade - AerobridgeAerobridges

Page 15: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

15

Aerobridges

• 3 aerobridge arms for more efficient access.

• 1st airport in the world to use 3rd aerobridge arm for Direct Upper Deck Access.

Infrastructure Upgrade - AerobridgeInfrastructure Upgrade - Aerobridge

Page 16: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

16

Arrival Greeters’ Hall

Baggage Claim Hall

Baggage Sorting Area

Arrival Immigration

Hall

Arrival Immigration

Hall

• Baggage claim belts lengthened to provide longer frontage for presentation of larger number of bags.

Baggage Handling

Baggage claim belts extended to provide 90m presentation frontage

Infrastructure Upgrade – Baggage HandlingInfrastructure Upgrade – Baggage Handling

Page 17: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

17

Expansion of Gate Holdrooms

3rd Aerobridge Arm

• Gate holdrooms expanded by 30% to provide more seating space for passengers’ comfort.

• Additional X-ray machines & boarding machines

Infrastructure Upgrade– Gatehold RoomInfrastructure Upgrade– Gatehold Room

Gate Holdroom Expansion

Page 18: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

18

2. New Handling Equipment3. Ground Working Group4. Training of Operators

Page 19: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

19

• Aircraft pushback tractor (heavier in tonnage)

• Upper deck catering hi-lift truck

• 3rd arm aerobridge for upper deck

• Modification of existing fuel dispenser or purchase new ones which can raise 2m higher

New Handling EquipmentNew Handling Equipment

Page 20: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

20

• Adequate check-in, immigration and security screening channels to process the larger volume of passengers efficiently.

Passenger Processing

Passenger Handling PreparationPassenger Handling Preparation

Page 21: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

21

• Form working group consisting of ground handlers, airline reps, aircraft maintenance, aircraft refueller, airport planner, engineers etc.

• Work out terms of reference

• Monthly meeting to monitor progress of infrastructure works, delivery of new equipment, training of operators

• Plan compatibility tests on all equipment when A380 is available

• Evaluate each test and look into ways to overcome areas which failed

Ground Working GroupGround Working Group

Page 22: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

22

Passenger Loading Bridge Operation• Brief operators on new procedures and docking sequence for 3 arms• Hands-on training on all 3 arms with mock-up fuselage• Operators must be certified competent

Upper Deck Catering Hi-Lift• Classroom and site briefing on equipment parts• Staff with class 5 Airfield Driving Permit• Training with hi-lift raised to upper deck height using mock-up fuselage• Training must also be conducted with marshaller as guide• Operator must be certified competent

Training of OperatorsTraining of Operators

Page 23: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

23

Aircraft Push Back Tractor• Practise tractor on other aircraft types to get familiarise in absence

of A380• Practise during A380 visits • Trainer to certify driver is competent

Other Equipment• All other equipment used for B744 which can be used for A380

needs to be practised on A380

Close Monitoring By Trainers and Airbus Reps• Trainers and Airbus reps must be around for first few flights

Training of OperatorsTraining of Operators

Page 24: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

24

5. Trial Flights & Challenges

Page 25: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

25

Trial Flights & ChallengesTrial Flights & Challenges• Comprehensive integrated trials were conducted during each A380 visit to

Changi Airport, with the latest from 9 – 15 August 2007.• Rigorous tests were conducted in all areas from equipment compatibility

tests to ground handling• Over 450 participants were involved to test out boarding and de-boarding

scenarios

Page 26: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

26

Pictures from the Trial

Page 27: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

27

Ensure GPUs are parked parallel to nose-wheels and the rear end of GPUs are clear of the path of the AIC hi-lift during its docking at Door M1R.

If GPUs are not positioned properly, the AIC hi-lift will not be able to dock at M1R.

2 Ground Power Unit (GPU)

SolutionChallengeEquipment

Door M1R

Position of GPU on Right Hand Side (RHS)

Trial Flights & ChallengesTrial Flights & Challenges

Page 28: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

28

Make markings on cab bumper to assist PLB operator to dock accurately.

If the 1st arm of the PLB is not accurately docked, it may hit the pilot tubes, as well as other instruments outside aircraft.

Accurate Docking Of Passenger Loading Bridge

SolutionChallengeEquipment

Marking on cab bumper to assist PLB operator to correctly adjust the cab to fit the aircraft door.

Trial Flights & ChallengesTrial Flights & Challenges

Page 29: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

29

Modify the cap closure in order for the cap bumper to contact aircraft fuselage first for proper closure.

Cap closure reached aircraft before cap bumper.

2nd PLB (L2) Arm at Door M2L

SolutionChallengeEquipment

Trial Flights & ChallengesTrial Flights & Challenges

Page 30: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

30

Introduce working procedures on which arm should move first.

Power could get cut off when docking 2 arms simultaneously.

Docking sequences

SolutionChallengeEquipment

The closeness of the 2nd and 3rd arm

Trial Flights & ChallengesTrial Flights & Challenges

Page 31: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

31

Do not use M4R door for Catering Hi-lift.

When Catering Hi-lift is at M4R door, the JCPL gets very close beside it and the transporter cannot align behind the JCPL.

JCPL at rear cargo door & Catering Hi-lift at M4R

SolutionChallengeEquipment

Door M4R

Trial Flights & ChallengesTrial Flights & Challenges

Page 32: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

32

Need Marshallers as well as a marshalling box, for marshaller to position himself to guide DUDC.

Upper Deck Door is very close to aircraft wing. DUDC faces difficulty in docking to door.

Upper Deck Catering Hi-lift (DUDC) at U1R

SolutionChallengeEquipment

DUDC Hi-lift docking to Door U1R DUDC hi-lift’s proximity to aircraft engine

Trial Flights & ChallengesTrial Flights & Challenges

Page 33: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

33

Toilet truck must reverse inwards from the rear, with marshalling aid.

Toilet truck cannot enter from the direction of the M5R door.

Toilet truck below Door M5R

SolutionChallengeEquipment

Trial Flights & ChallengesTrial Flights & Challenges

Page 34: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

34

2 locations on the port side were identified for positioning the air-con trucks.

In the event where the APU does not work, no provisions are made for air-con trucks.

Positioning of air-con trucks

SolutionChallengeEquipment

Position of 1st air con unitPosition of 2nd air con unit

Trial Flights & ChallengesTrial Flights & Challenges

Page 35: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

35

Remove DUDC so that air stairs can be positioned.

In an emergency, AES air stairs have to be used for evacuation.

Airport Emergency Service (AES) air stairs

SolutionChallengeEquipment

Trial Flights & ChallengesTrial Flights & Challenges

Page 36: Singapore Changi Airport Events/ASQ... · 4 Planning ahead to serve the A380. • Changi Airport was the launch pad for the inaugural A380 commercial flight. • Planning started

36

Thank You