SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

2 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

1.0 PURPOSE ............................................................................................................. 4

2.0 SCOPE .................................................................................................................. 4

3.0 OVERVIEW ........................................................................................................... 5 3.1 General ............................................................................................................................. 5 3.2 Weekly / Daily Reviews .................................................................................................... 5 3.3 Modelling Scope ............................................................................................................... 6 3.4 3D Model Output .............................................................................................................. 7 3.5 Review & Comments Recording ...................................................................................... 8

4.0 DESIGN MILESTONES ........................................................................................ 8

5.0 30% MODEL REVIEW .......................................................................................... 9 5.1 30% Review Stage Requirements .................................................................................... 9 5.2 Modelling & Review ........................................................................................................ 10 5.3 Outcome & Objectives .................................................................................................... 11

6.0 60% MODEL REVIEW ........................................................................................ 12 6.1 60% Review Stage Requirements .................................................................................. 12 6.2 Modelling & Review ........................................................................................................ 13 6.3 Outcome & Objectives .................................................................................................... 14

7.0 90% MODEL REVIEW ........................................................................................ 15 7.1 90% Review Stage Requirements .................................................................................. 15 7.2 Modelling & Review ........................................................................................................ 16 7.3 Outcome & Objectives .................................................................................................... 17

8.0 MILESTONES SCOPE MATRIX......................................................................... 18 8.1 Piping and Mechanical: .................................................................................................. 18 8.2 Building Services: ........................................................................................................... 19 8.3 Civil and Structural: ........................................................................................................ 20 8.4 Architectural: .................................................................................................................. 22 8.5 Electrical: ........................................................................................................................ 23 8.6 Instrumentation: .............................................................................................................. 24

9.0 RELATED DOCUMENTATION (REFERENCES) .............................................. 25

10.0 RECORDS ........................................................................................................... 25

Page 3: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

3 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

PAGE COUNT

Document No.

No. of Pages

Main Document SING-WI-LL-24 25

Related Documents WI-LL-24f1 1WI-LL-24f2 1WI-LL-24f3 1 WI-LL-24f4 1

Sub-Total 4

TOTAL PAGES 25 + 4 = 29

Page 4: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

4 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

1.0 PURPOSE The purpose of this Work Instruction is to establish the procedures for the review of the 3D model.

2.0 SCOPE This Work Instruction describes procedures and guidelines for review of the 3D model and is applicable to all projects where PDS 3D software is being utilized for design. Note: Although, this procedure is primarily applicable to PDS, similar guidelines can be extended to other modelling

software such as AUTOPLANT and PDMS with appropriate considerations to issues that are software specific.

Refer to WI-LL-24f2 for the 3D Workflow Diagram Inputs required for 3D model development, design progress to be made and output expectations from the model at various stages of completion are identified. The stages of the 3D model reviews are milestones and expressed in terms of

percentage, not necessarily equal to percentage of engineering progress made.

The objectives of the 3D model review are to ensure:- Design has progressed to the expected stage as planned Model incorporates progress made in design and vendor data available to date Design meets all process functionality, engineering and HSE requirements Constructability, Operability and Maintainability requirements are incorporated Standardized design philosophies are utilized across the project Client’s Standards, as applicable, are adhered Modelled work is clash free and inter-discipline interfaces are incorporated Design deficiencies are clearly identified Time based path forward for resolving open items

This document lists the roles and responsibilities of all engineering disciplines and

their contributions towards successful completion of the 3D model. All disciplines (Piping, Process, Mechanical, Civil, Architectural, Electrical, Instrumentation and Building Services and DTS) shall be actively involved during the reviews.

Inputs required to reach each milestone completion are identified. Modelling and review expectations of the 3D model and the outcomes and

objectives of each milestone completion are listed. These formal reviews shall be treated as important milestones for Project schedule.

All stake holders i.e. Technology (Licensor), Engineering, Projects, Construction, Operations and Maintenance departments shall participate in these sessions.

These formal reviews do not substitute regular weekly review sessions and these are not line by line reviews.

The review methodology, review agenda and participants for each formal review shall be discussed and agreed with the Client before the review.

Page 5: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

5 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

3.0 OVERVIEW 3.1 General 3.1.1 It is essential to conduct formal Client reviews of the 3D model at appropriate pre-fixed

time intervals throughout the duration of the project and get Client’s approval for the design that is completed.

3.1.2 Depending upon the size of the project and the number of units involved, the project may be divided into sub-areas so that the 3D model reviews can be conducted independently. The Client’s Project Managers and Jacob’s Project Engineering Managers shall be the focal point of contact for all reviews, comments and close outs.

3.1.3 NAVISWORKS software shall be used for the formal model reviews. 3.1.4 The formal model reviews shall be conducted over a period of three to five working

days, depending on each area. 3.2 Weekly / Daily Reviews 3.2.1 Apart from formal model reviews, weekly model reviews shall continue throughout the

project duration to address ongoing action points and monitor progress and quality of the 3D model.

3.2.2 An action log (WI-LL-24f4) shall be maintained by the Project Engineering Manager to

record and track the weekly model review comments for all the disciplines. Actions that are completed shall be suitably tagged. The completed and/or tagged action points shall be reviewed in the successive sessions and closed out.

3.2.3 Separate line wise reviews shall also be conducted to ensure that the line modelling is

consistent with inputs (mainly process) and checked for stress, accessibility of valves and instruments, supporting is taken care of, slopes, no-pocket and specific requirements are adhered to and all holds & assumptions are documented.

3.2.4 During these reviews, checks shall be done to ensure that the model is updated in line

with latest vendor documents and with agreed comments of previous review sessions. 3.2.5 Line wise checking requires more time. It may not be feasible to check and obtain

approval for lines modelled during the entire week, during the weekly review sessions. Therefore, at some point of time during the execution of the project, daily reviews will be required. Based on the checking backlog of modelled lines, the PEM / Lead Engineer shall discuss and agree upon the requirement for daily reviews with the Client’s PM. The focus of the daily reviews must be to check / approve all the lines modelled during the previous days and clear the backlogs.

Page 6: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

6 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

3.2.6 Lines that are checked and approved shall be ‘locked’ in the 3D model to prevent unauthorized modifications and to control further changes. This could only be done at a certain stage of the model. That is, certain lines could be locked after 60% model review and later during reviews that are called specifically to approve lines and lock them either by area or system wise.

3.2.7 A working copy of the line list shall be maintained and duly updated to record and track

line wise review comments and balance points (including holds and assumptions). 3.2.8 NAVISWORKS software shall be used for the weekly and daily model reviews 3.3 Modelling Scope 3.3.1 Entire plant shall be modelled. The exceptions are listed as below. Intention is to get

quality output documents that have undergone multi-disciplinary checks and reviewed by technology, construction and operations and maintenance departments.

3.3.2 All above ground work and underground services shall be modelled. Piling shall be

modelled to a depth of 5 meters to ensure that all underground services are clash free 3.3.3 Non-process buildings may not be modelled. However, these buildings outlines shall be

modelled as shell/envelope with coordinates. Process buildings interiors such as electrical/ instrumentation rooms, office rooms and similar enclosed rooms will not be modelled. Only their encompassing walls shall be modelled.

3.3.4 Building services, electrical and instrumentation equipment installed outside shall be

modelled as envelopes only, for space & interface management. 3.3.5 Extent of items to be modelled has to be agreed with the client during scope definition.

The following should be treated as a guideline only.

All sizes of piping (with insulation, as applicable) (Tubing will not be modeled. Only manifolds will be modeled)

All equipment (including portable equipment, as applicable) (The extent of modeling of vendor package units must be discussed and agreed)

All inline items All supports All piles, trenches, substructure and superstructure

(Concrete rebars, anchor bolts, etc details are not to be modeled. They are only modeled to shape)

All steel structural work, including platforms, stairs, walkways, ladders, chequered plates, gratings, handrails, openings

Floor slopes, Roads, paving, drains, space for trees and plants Buildings (refer to clause 3.3.3). External walls – brick walls, cladding, windows,

louvers, doors, openings for cables, piping, ducts and other services

Page 7: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

7 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

Main and branch cable trays (≥100 mm width), spaces for conduits (≥ Ø50 mm), raceways and tubing/ tubing trays (≥100 mm width)

Offline instruments (modeled by piping as per input given by Instrumentation) Instrument stands, manifolds, Field local panels, junction boxes, remote I/O panels Electrical light fittings with supports, street lights with poles, stanchion mounted

lights with stanchions (Supports could be modeled as spaces. Intention is not to produce support drawings from the model, but to provide spaces clash-free)

Field electrical panels, JB, socket outlets, control stations and similar with supports Fire protection system equipment such as pumps, FW tanks, hydrants, hose boxes,

monitors, foam tanks, operating platforms, valve manifolds, deluge outlets, sprinklers, all Fire protection systems piping

Process and non-process duct work in all areas (except those inside non-process buildings and areas excluded for modeling. See clause 3.3.3 above)

Envelopes for safety and escape routes, maintenance spaces Spaces for ambulance parking, ambulance and Fire engine movements, loading/

unloading trucks, vans and similar ones parked inside the plant Spaces and travel path for mobile and portable equipments Spaces and travel path for crane / hoist hooks, taking into account the size of the

item or equipment that is to be carried / handled Spaces for temporary storage of materials during shutdown and normal operation

and maintenance of plant and lay down yards Interface with external / Third party suppliers and service providers

3.3.6 It is the responsibility of the DTS group to set up the PDS model volumes and also

define the naming procedures at the very onset. The DTS group will prepare and issue for every project, a document which clearly describes the model volume nomenclature.

3.4 3D Model Output 3.4.1 The Intention of the formal reviews and the weekly / daily reviews is to get quality output

documents that have undergone multi-disciplinary checks and reviewed by technology, construction and operations and maintenance departments.

3.4.2 All 2D layout type drawings developed for the project shall have their coordinates (X-

refs) extracted from 3D only. None of the 2D layout type drawings shall be developed independently. This is mandatory requirement for ensuring consistency between the drawings issued for the project. (Appropriate considerations to issues that are software specific must be applied).

Page 8: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

8 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

3.4.3 Documents that are extracted from 3D model are listed below. However, this is only a guideline and depends upon project and modelling scope. Plot plans Equipment layouts Piping layouts Isometrics Nozzle Orientation drawings Support detail drawings MTO Structural steel drawings Platform drawings Cable tray layouts (will include field panels, JB, etc) Lighting layouts (will include field panels) Instrument location plans (will include field panels, RIO cabinets, JB, etc) Ducting layouts Sprinkler & deluge location plans Fire hydrant/monitor location plans X-refs/ Base lines for all 2D layout drawings

3.5 Review & Comments Recording 3.5.1 The comments that are generated during the formal model reviews shall be properly

documented in a defined manner.

3.5.2 The spreadsheet WI-LL-24f1 shall be used for recording all the review comments. Refer to Section 9.0 of this Work Instruction.

3.5.3 After each review, all comments shall be compiled together by the Project Engineering Manager into a model review action report and circulated to all disciplines and to Client. This will be the checklist (or punch list) for incorporation into 3D model and closing out all the action points.

3.5.4 Once the action points in the spreadsheet are closed, then no further change in the design is expected.

3.5.5 The comments and actions of the weekly reviews shall be maintained as a Weekly

Action Log (WI-LL-24f4) by the Project Engineering Manager. Refer to Section 9.0 of this Work Instruction.

4.0 DESIGN MILESTONES The 3D model shall be formally reviewed with the Client at three milestone stages of

completion. The stages are 30%, 60% and finally 90%.

Incorporation of the formal model review comments and close out shall be the foremost action point for the subsequent stage.

Completion of formal model review and incorporation of all comments and close out shall be the indicator of the design completed at that stage.

Once the model is reviewed and client approval is obtained on the closure of comments, then design for that stage shall be treated as Frozen. Subsequent changes to previously reviewed and approved designs shall be strictly restricted and controlled. Necessary change management system shall be enforced.

Page 9: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

9 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

5.0 30% MODEL REVIEW

The main focus of the 30% model review is on layout, accessibility, space allocation, safety, ergonomics, operability, maintainability, constructability.

5.1 30% Review Stage Requirements

5.1.1 Following are required to reach 30% milestone completion:- Basic Engineering stage modelling basis Client’s Specific Design requirements (as applicable) Project Design Basis Initial concepts and studies Building design concepts (footprints, elevations) Tie-in locations (to external facilities) IFD P&ID IFD Line List & Tie-In list IFD PDS and/or MDS IFD Project Specifications IFD Piping Material Specifications IFD Plot Plan and Equipment Layouts Piping Support Standards Insulation Specification

(Insulation thicknesses for piping and equipment) Preliminary or reference data for piping speciality items Preliminary or reference data for rotating equipments Preliminary or reference data for Vendor Package items Preliminary data for HVAC systems (fans, blowers, etc.) Main E/I cable trays sizing Ductwork philosophy Space management philosophy Fire protection and fire fighting systems philosophy Underground philosophy

(Piping, cable routing, duct banks, drainage, road crossing, piling, trenching, depths) 5.1.2 The model shall be clash checked and major clashes shall be resolved prior to formal

review. At 30% review stage, lot of data is not available. Therefore, it is not mandatory to resolve each and every clash.

Page 10: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

10 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

5.2 Modelling & Review

5.2.1 Following shall be modelled and subsequently reviewed for 30% milestone:- All equipments

Equipment arrangement and relative positions and elevations shall satisfy governing process criteria

Support arrangement, nozzles locations and platforms shall be reviewed Space allocation for data not available

(Equipments, vendor packages, etc) Envisaged space envelopes for:

Electrical & instrument facilities such as E/I main cable trays, Remote I/O Panel and Field Junction Boxes, Electrical rooms, Analyser house

Envelopes for door opening, equipment removal, etc. Fire pump house HVAC equipment, ventilation, ducts, etc.

Space management and space allocation for:

Constructability Operability Maintenance Logistics Pull out spaces Removal spaces Lay down area Loading / unloading bays Cranes, Monorails, hoists, beams Escape routes Access ways Man ways Vehicles and forklifts movement Material handling requirements Fire Engine Access Set back envelop from plant boundaries as per local authority guidelines

All lines as per prior agreement with Client (without supports)

Space and feasibility for supporting shall be confirmed Process critical lines (as per specific process & instrumentation requirements) Removal space for valves, speciality items, inline & online instrumentation Utility stations and Safety Showers w/eye wash All underground facilities

(Piping, sewers, drains, trenches, electrical duct banks, etc.) Main floor slabs Main equipment platforms Main pipe racks, sub-racks, sleepers Roads, paving, bund areas Piling (up to 5 meters) Main structural framing and foundations, including stairways, ladders, walkways Drainage system showing drain width and invert levels (Preliminary)

Page 11: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

11 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

Architectural (shell basic, external modelling only) Buildings: Administration & Maintenance, Chemical Storage, Central Control Room,

Substations, Cleaning Area, Fire Pump House, Air Compressor Unit, etc. External roads, driveway, road marking, turfing area, gravel area, pedestrian walkway,

fencing & gate Exterior masonry & Interior partition walls, louvers panels, concrete stair, roof elements

5.3 Outcome & Objectives

5.3.1 Following should be frozen:- Coordinates for the plant, units, buildings, shelters, pipe racks, sleepers Equipments location and elevation All main platforms, stairways, ladders, walkways, escape routes Lay down and maintenance spaces Equipment layouts IFD No major changes are expected in the equipment layouts for the next stage All disciplines shall proceed with further detail design based on Equipment Layouts

5.3.2 Equipments once frozen during the formal model review shall be colour coded as per

agreed colour codes. 5.3.3 Preliminary study on nozzle orientation and support cleats (as input for equipment RFQ) 5.3.4 Preliminary stress analysis of agreed lines

(Confirm routing, location of equipments and load data to civil) 5.3.5 Preliminary bulk MTO for RFQ. The main aim is the MTO for special materials and in

general all long lead items (Includes piping, structural steelwork, gratings, concrete, etc)

5.3.6 Preliminary design calculations for the main structures, foundations, pipe racks and sleepers

5.3.7 Verification of civil and structural modelling with respect to preliminary design of beam sizes and bracing locations

5.3.8 Verification of size and loading data of equipments (for civil / structural design) 5.3.9 Piling design and piling layouts 5.3.10 Architectural layouts 5.3.11 Fire protection and fire fighting system design, layouts 5.3.12 Main E/I cable routings

Page 12: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

12 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

6.0 60% MODEL REVIEW The main focus of the 60% model review is to establish the progress of the detail design as per latest information

6.1 60% Review Stage Requirements

6.1.1 The outcome and conclusions of the 30% model review are the basis for further proceeding with the detail engineering and also progress upon the 3D model.

6.1.2 All comments of 30% model review have to be resolved and closed out in order to proceed with the next stage.

6.1.3 Further, the following are required to reach 60% milestone completion:-

Latest revision of P&ID and Line List Equipment, package items vendor drawings Piping stress analysis Special pipe supports sizes calculations IFD Instrument hook-up details Instrument Data (especially for all Inline Instruments) from Client approved Vendor

Catalogues Speciality items vendor data E/I Main and branch cable tray sizes, tubing tray and conduit spaces Vendor data and location of RIO Cabinets, Field Junction Boxes, Field local panels,

light fittings, etc. Instrument air manifolds and heat tracing systems manifolds typical calculations and

sizing for distribution Civil and structural design and calculations done using vendor data Updates on buildings and structures (footprints, coordinates, elevations)

6.1.4 The model shall be clash checked and made clash free before the formal review

Page 13: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

13 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

6.2 Modelling & Review

6.2.1 All aspects of modelling and reviewing at 30% milestone (as in section 5.2) are also generally applicable to 60% milestone.

6.2.2 The 3D model at this milestone shall have progressed much further. Therefore, the review shall be extensive. All additional modelling done after the 30% milestone shall be reviewed.

6.2.3 Following shall be modelled and subsequently reviewed for 60% milestone: In general, all modelling done so far shall be rechecked and updated with respect to

latest available information Equipments (as per latest available vendor drawings) Most of the lines (80% to 90%) Piping supports including secondary supports

It shall be ensured that under no circumstances is any piping support taken from monorails and crane beams.

Valves and speciality items accessibility check All Operational platforms and cat ladders Lay down area for equipments with removable internals

(Exchanger tubes, column trays and packing, etc) Movement of mobile / portable equipments Maintenance beams, monorails, hoists, davits Travel path of crane / hoist hooks taking into account the size of item being handled Civil and structural modelling shall have proceeded with more details

(Hand rails, bracings, fencing, etc) Secondary structures Drainage system showing drain width and invert levels Fire proofing, wherever applicable All Inline instruments

Valves (Emergency Isolation, Control, On/Off, Butterfly, Safety), Rupture Disc, Mass Flow Meter, Mag Flow Meter, Vortex Flow Meters, Orifice, Venturi, Thermowell, etc

All Offline Instruments Electronic Transmitters, Level Instruments, etc

Instrument location, accessibility review Instrument junction boxes Instrument air and heat tracing systems manifolds Lighting fixtures Field panels

Page 14: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

14 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

E/I branch cable trays Branch Trays of 150 mm and 100 mm shall be modelled. 75 mm and below sizes shall

be site routed and will not be modelled. Branch conduits (if any) shall not be modelled.

Spaces (envelope) for conduits (≥ Ø50 mm) and tubing trays (≥100 mm width) Ductwork in process areas in more detail with the inline / online components Fire fighting system

(Sprinkler head locations, hydrants, monitors, foam tanks, deluge outlets locations, sprinkler and deluge pipe routing, valve manifold locations)

Architectural updates of buildings, walls, doors and windows (as applicable)

6.3 Outcome & Objectives 6.3.1 IFC Equipment Layouts 6.3.2 IFD Piping layouts 6.3.3 Piping MTO 6.3.4 Stress analysis of majority lines completed. 6.3.5 Main pipe supports completed 6.3.6 Special pipe supports completed

6.3.7 Detailing of Structural design Completion 6.3.8 IFC Civil and structural layouts

Shall Include secondary beams, staircases, handrails, equipment support beams, main structural framing sizes, roads & pavements layout, drainage system, location of main pipe supports, crane beams, monorails, hoists, Floor openings, etc

6.3.9 The civil and structural design, including equipment foundations confirmed for all the

equipment loads and ready for permitting submission to authority 6.3.10 Structural steel MTO 6.3.11 Drainage Layout

6.3.12 Instrumentation location plans, lighting layouts, cable tray layouts & field panel locations 6.3.13 Fire protection Layouts

Page 15: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

15 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

7.0 90% MODEL REVIEW The main focus of the 90% model review is to close-out all the action points from previous reviews, complete the modelling of all disciplines in all respects and subsequently issue all final IFC drawings and documents

7.1 90% Review Stage Requirements

7.1.1 Following are required to reach 90% milestone completion:- All Input documents IFC Status

P&ID, Line List, etc. Approved equipment and package vendor drawings Approved vendor drawings of all modelled items (all disciplines) Approved Instrument vendor drawings Approved Vendor drawings for speciality items, safety showers, etc. Structural steel design and modelling completed. IFC Civil and structural drawings Stress analysis completed. Main piping supports modelled as per designed information. Fire Protection, fire proofing ( as applicable), escape ways (including associated

stairs and ladders), hand rails, drains etc are designed/ approved in-line with Authorities requirements

7.1.2 The model shall be clash checked and made clash free before the formal review

Page 16: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

16 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

7.2 Modelling & Review 7.2.1 Following shall be modelled and subsequently reviewed for 90% milestone:

In general, all modelling done so far shall be rechecked and updated with respect to

latest available information Final review of Operability, maintainability and constructability Escape ways, stairs, ladders, operation platforms reviewed as final All discipline items modelled as per dimensions given in approved vendor drawings All piping including small bore

(Except tubing. Envelopes provided for tubing and trays including insulation / lagging) All piping supports

(Including Springs, snubbers, rod hangers) Safety shower and eye wash as per vendor drawing. All drawings and documents shall be ready for IFC issue. Floor and wall openings All supports

(trays, ducts, fire protection pipe work and all secondary pipe supports) All equipment handling equipments such as hoists, monorails, EOT cranes, beams,

etc are reviewed using final vendor drawings and weights for maintenance requirements

Building internal facility modelling, if required

Page 17: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

17 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

7.3 Outcome & Objectives

7.3.1 This is the final formal review of the 3D model. Any subsequent reviews will be specific and pertaining only to the closeout of the comments.

7.3.2 IFC Isometrics Refer to Isometrics Flowchart WI-LL-24f3 in Section 9.0 of this Work Instruction.

7.3.3 All pipe support drawings 7.3.4 IFC Piping layouts 7.3.5 Final issue of equipment layouts, plant layouts, overall plot plan 7.3.6 Final MTO 7.3.7 IFC Main pipe support drawings 7.3.8 Structural steel layouts, elevations of all pipe racks, process structures, equipment

support structures, platforms, ladders, stairs, gratings, floor plates, etc. issued 7.3.9 All other miscellaneous civil fabrication drawings and details done. 7.3.10 Floor opening and wall penetration drawings and details shall be completed. 7.3.11 Tray layouts IFC 7.3.12 Lighting layouts IFC 7.3.13 Instrument location plans IFC 7.3.14 Duct layouts IFC 7.3.15 Fire protection system – layouts, sprinkler heads, deluge outlets & their piping layouts

IFC

Page 18: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

18 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.0 MILESTONES SCOPE MATRIX 8.1 Piping and Mechanical:

Modelling Scope

1st C

lien

t R

evi

ew

2nd C

lien

t R

evi

ew

Fin

al

Re

view

Remarks / Comments

30% 60% 90%Piping Modelling Number of lines and pipe sizes as

agreed with Client for each milestone

X X X Only Preliminary Routing @ 30%

All Underground Piping X X

Equipments X X X

Safety Showers X X

Utility Stations X X

Sample points X

In-Line Piping Components X X

In-Line Instrumentation & Speciality X X

Critical Lines Identified For Stress Analysis

X

Critical Lines Compliance to Stress Requirements

X

Pipe Racks & Sub-Racks X X Location Only

Primary Pipe Supports X Detailed By Stress Engineer

Secondary Pipe Supports X X

Note: Ensure that under no circumstances is any piping support taken from monorails and crane beams

Equipment Supports X X Location Only

Withdrawal Spaces X

Maintenance Space X X

Escape routes X X

Pull out space and lay down area X X

Davits and Equipment Manholes X X

Lifting Lugs X X

Vendor Packages, Modules, & Skid Units X X

Future Equipment X

Inline and Offline Instruments X X

Insulation for Pipes X X X

Floor Drainage and associated pipe work above ground

X X

Runway & Lifting Modelling Volume X X

Page 19: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

19 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.2 Building Services:

Modelling Scope

1st C

lien

t R

evi

ew

2nd C

lien

t R

evi

ew

Fin

al

Re

view

Remarks / Comments

30% 60% 90%

BS Piping X X

BS Equipment X X X

Fire protection and fire fighting system X X X

In-Line Piping Components X

In-Line Instrumentation & Speciality X

Plumbing Services – only for underground X X

Fire Protection Piping (underground) X

Fire Protection Piping (aboveground) X

Critical Lines Identified For Stress Analysis

X

Critical Lines Compliance to Stress Requirements

X

Primary BS Pipe Supports X

Secondary BS Pipe Supports X X

BS Equipment Supports X X

Extract Fans & Fan Filter Heaters X

Ventilation Ductwork & Insulation X

Ductwork In-line Components X

Ductwork In-line Instrumentation X

Dedicated Extract Systems X

Main Ductwork Support Steels X

Major Ducting X

Dampers X

Fans, withdrawal space X X

Low Wall exhaust Grilles X X X

Sprinkler Headers, Deluge lines X

Sprinkler Lines X

Piping X

Modelled by Piping based on inputs provided by Building Services

Page 20: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

20 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.3 Civil and Structural:

Modelling Scope

1st C

lien

t R

evie

w

2nd C

lien

t R

evie

w

Fin

al

Rev

iew

Remarks / Comments

30% 60% 90%

Primary Steelwork X X X

Connection details X X

Critical Insert-plate details X X

Modular Pipe Racks X X X

Typical Details X X X

Hand railing X X

Cat Ladders X X

Checker Plate & Grating X X

Steel Staircases X X

Stair Towers X X

Purlins & Side Rails X X

Vessel Supports X X

Critical Pipe Supports X X

Concrete Floor Slabs X X

Concrete Floor Penetrations X

Floor Sumps X X

Mezzanine Concrete Floors X X

Concrete Walls X X

Concrete Wall Penetrations X

Retaining Walls X X

Bund Area’s X X X

Foundations X X X

Concrete Up-stands & Plinths X

Pits & Trenches X X

Underground Drainage X X X

Columns & Beams X X X

Trimmers X

Runway and lifting beams / lifting eye X X

Pipe Rack & Structural Pipe Supports X X X

Preliminary walk-on ceiling (extent) X X

Secondary Supports X X

Page 21: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

21 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

Modelling Scope

1st C

lien

t R

evi

ew

2nd C

lien

t R

evi

ew

Fin

al

Re

view

Remarks / Comments

30% 60% 90% Concrete Floors X X X

Lift Pits X

Pre-Cast Core Walls X

Equipment Base Grout X X

Anchor Bolt Setting X X

Page 22: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

22 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.4 Architectural:

Note: Architectural details will be modelled only when the building internal areas are to be modelled. They will not be modelled, if only building shell has to be modelled as envelope

Modelling Scope

1st C

lien

t R

evie

w

2nd C

lien

t R

evie

w

Fin

al

Rev

iew

Remarks / Comments

30% 60% 90%Exterior Masonry Walls X

Exterior Masonry Wall Opes X

Interior Partition Walls X X

Interior Partition Walls Opes X X

Exterior Cladding X

Louver Panels X X

Suspended Ceilings X

Doors X

Windows & Screens X

Concrete Stairs X X

Elevator Shaft X

Roof Elements X X

External Rain water Pipes X

Sanitary Fittings X

Laboratory Furniture & Fittings X

Office Furniture & Fittings X

Internal Walls X

External Walls X

Finish Floor Penetrations X X

Windows, Vision Panels X

Clean room False Ceiling X

Doors, Vision Panels X

Laboratory Benches X

Lockers Area Furniture X

Page 23: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

23 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.5 Electrical:

Modelling Scope

1st C

lien

t R

evie

w

2nd C

lien

t R

evie

w

Fin

al

Rev

iew

Remarks / Comments

30% 60% 90%

Main Cable Trays Routes (for power, control & auxiliary systems)

X X

Branch Cable Tray Routes X X

Electrical MCC room Equipment (Dry type transformer, Switchgear, MCC etc.)

X

Electrical Misc. Panels (various panels outside electrical rooms

X X

Electrical junction box, local switches / push button stations.

X X

Light Fittings X X

Underground trenches, duct banks X X

Supports For Main Cable Trays X By Civil and Structural

Support For Branch/Cable Trays X X By Civil and Structural

Supports for Junction Boxes, local switches, push buttons, electrical panels outside electrical rooms

X X By Civil and Structural (for electrical panels only)

Page 24: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

24 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

8.6 Instrumentation:

Modelling Scope

1st C

lien

t R

evie

w

2nd C

lien

t R

evie

w

Fin

al

Rev

iew

Remarks / Comments

30% 60% 90%

Instrumentation Junction Boxes X X X

Remote I/O Panels X X X

Main Instrumentation Cable Tray Layout X X X

PAT Cabinet Location X X

PAT Container Location X X X

Local Control Panel/PLC Panel Location X X X

Instrument Air manifold Location X X

Offline instruments X X Offline instruments on pipe lines are modelled by piping

Branch cable trays (≥100mm width) X X

Instruments Drain connection to common Drain Funnel as shown in the P&ID & Instrument Hook-ups

X X (By piping, if line number is given to the drain line)

Page 25: SING-WI-LL-24 REV 0

SING-WI-300-01f1 Rev0 July 2008

Department Work Instruction Document No:

SING-WI-LL-24

Page :

25 of 25

3D Model Review Procedure Supersedes:

Nil Revision: 0 Issue Date:

04 January 2010 Issuing Department:

Quality – Singapore

Functional Department: Piping Department

Previous Rev & Issue Date: Nil

Effective Date: 04 January 2010

The current applicable version of this publication resides on JNET Singapore Office – Quality Page. This copy is considered as UNCONTROLLED once printed out.

9.0 RELATED DOCUMENTATION (REFERENCES)

WI-LL-24f1 : Model Review and Comments Recording Spreadsheet

WI-LL-24f1.XLS

WI-LL-24f2 : 3D Workflow Diagram

WI-LL-24f2.dwg

WI-LL-24f3 : Isometric Flowchart

WI-LL-24f3.xls

WI-LL-24f4 : Weekly Action Log

WI-LL-24f4.xls

Double Click on Icons to display the document

10.0 RECORDS