4 5 6 SimpleGrip-SQ was designed for installation on roofs between 0.5:12 and 3:12 pitch e 2 3 1 5 7 1. Locate the rafters and mark the installation position for each mount. Predrill a single 1/8” hole into roof to confirm rafter location.* Surface Prep: Surface must be dry and clear of all debris. Use a dry brush or compressed air to clear area. 2. Remove release paper from one side of Roof Level Mastic. Place and roll onto roofs surface. * 3. Remove second side of release paper and place SimpleGrip-SQ base onto center of Roof Level Mastic. 4. Install fasteners. A minimum 2 fasteners into rafter at opposite sides of base plate. 5. Place Upper Level Mastic over perimeter of SimpleGrip Base. 6. Complete the assembly by placing (1) Compression Plate fitted with GreenFasten EPDM bushing, (2) EcoFasten bracket or Rock-It Slide, (3) EPDM bonded washer and (4) Flange nut on SimpleGrip-SQ Base Stud. 7. Torque Flange Nut to 100-140 inch-pounds. SimpleGrip-SQ 6 * The mounts should be attached to the 2x rafters with a minimum penetration of 2" into the center of each of the 2x's. EcoFasten Solar ® All content protected under copyright. All rights reserved. 1.16.2018 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 www.ecofastensolar.com * Ambient air temp should be above 40 degrees F or use EternaPrime Primer down to -20 degrees F.

SimpleGrip-SQ - EcoFastenSimpleGrip-SQ was designed for installation on roofs between 0.5:12 and 3:12 pitch . e. 1 2. 3 7. 1. Locate the rafters and mark the installation position

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SimpleGrip-SQ - EcoFastenSimpleGrip-SQ was designed for installation on roofs between 0.5:12 and 3:12 pitch . e. 1 2. 3 7. 1. Locate the rafters and mark the installation position

4

5 6

SimpleGrip-SQ was designed for installation on roofs between 0.5:12 and 3:12 pitch e

2 31

5 7

1. Locate the rafters and mark the installation position for each mount. Predrill a single 1/8” hole into roof to confirm rafter location.*

Surface Prep: Surface must be dry and clear of all debris. Use a dry brush or compressed air to clear area.

2. Remove release paper from one side of Roof Level Mastic. Place and roll onto roofs surface. *

3. Remove second side of release paper and place SimpleGrip-SQ base onto center of Roof Level Mastic.

4. Install fasteners. A minimum 2 fasteners into rafter at opposite sides of base plate.

5. Place Upper Level Mastic over perimeter of SimpleGrip Base.

6. Complete the assembly by placing (1) Compression Plate fitted with GreenFasten EPDM bushing, (2) EcoFasten bracket or Rock-It Slide, (3) EPDM bonded washer and (4) Flange nut on SimpleGrip-SQ Base Stud.

7. Torque Flange Nut to 100-140 inch-pounds.

SimpleGrip-SQ

6

* The mounts should be attached to the 2x rafters with a minimum penetration of 2" into the center of each of the 2x's.

EcoFasten Solar® All content protected under copyright. All rights reserved. 1.16.2018EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2

www.ecofastensolar.com* Ambient air temp should be above 40 degrees F or use EternaPrime Primer down to -20 degrees F.