JOINT VENTUREPRESENTATION

Together we build something better

WELCOME TO OUR

Page 2: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

WHO WE ARE?

SARI Consulting Ltd is a quality-driven, leading engineering company with over 18 years experience in the provision of independent professionalmanagement, strategic advice, design of infrastructures and environmental engineering. SARI is a company participating in FG Tecnopolo Alliance. FGTecnopolo Alliance is an initiative of FG Tecnopolo Holding, a structured network of partner companies specialized in consulting services in the fields ofarchitecture, engineering, and information technology, delivering fully integrated design services for large scale projects. The FG Tecnopolo Alliance businessmodel is based on the integration of skills of the individual Companies participating in the coalition, which while preserving their independence, contributeto the definition of integrated and harmonized design proposals. The scope is to provide integrated consultancy services characterized by the MaximumSpecialization in the disciplines, thanks to the excellent standard of all Partners, through the interface of the Structured Organization of FG TecnopoloAlliance.

SIMECO Spa is a leading mid-size engineering and contracting company, established in 1984, providing:

• qualified and competitive services from basic design & FEED to detail engineering and site services, for Oil & Gas plants (On-shore/Off-shore UpstreamFacilities, Refining), Pipelines, Petrochemical & Chemical Plants, Power Plants (including renewable energies), Plant Off-sites & Utility Generation Units;

• contracting for the execution of projects on turn key lump sum basis;

• design and supply of skid mounted plants.

Page 3: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION3

Sari Consulting Ltd (SARI) activity cover:

• Economic and financial analysis, feasibilitystudies, and concessions of infrastructureprojects;

• Institutional strengthening and capacity-building, assistance to program management, aswell as programming for operation andmaintenance of infrastructure and equipment;

• Irrigation/Agricultural planning, includingdesign and/or modernization of infrastructure;

• Technical assistance, planning, studies, designand/or construction supervision of all types oftransport infrastructure, building technology,water and environment, in projects ranging frommajor infrastructure to small local projects.

SARI Clients include: Developing Aid Agencies,Government Ministries Municipal Authorities,Private Sector Companies.

SARI is registered with the majority of fundingagencies such as the European Union (EDF), andInternational Financial Institutions such as the WorldBank Group (IBRD/IDA), the African DevelopmentBank (AfDB), and the Asian Development Bank.

Sari Consulting Ltd.

Page 4: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION4

Sari Consulting Ltd (SARI) has carried out projectsin the following countries:

Africa:Tanzania, Uganda, Zambia, Mozambico, Gambia,Guinea Bissau, Benin, Sierra Leone, Madagascar,Ghana , Mauritius, Niger, Lesotho, Angola, Morocco,Djibouti, Rwanda, Botswana, Angola, Seychelles ,Nigeria, Burkina Faso, Republic of Congo(Brazaville), Malawi, Somalia, Togo, Algeria,Comore Islands , Egypt, Tunisia, Libya, Ivory Coast,Guinea (Conakry), Liberia, Senegal

Central & South America:Saint Lucie(West Indies), Haiti, Honduras, Ecuador,Nicaragua, Venezuela, El Salvador, Guatemala

AsiaPakistan, India, Philippines, Thailand, Indonesia,Myanmar, Mongolia

OceaniaVanuatu

EuropeItaly, Albania

Sari Consulting Ltd.

Page 5: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION5

Simeco S.p.A. possess the organization and theskilled experienced staff to provide the followingservices to the Oil & Gas, Petrochemical andChemical Industry:

• Feasibility Studies and Cost Estimates• Conceptual Design• Basic Engineering Design• Front End Engineering and Design (FEED)• Project Management• Project Management Consultancy• Owner’s Engineering Services• Risk Analysis and HSE Reports• Detail Engineering• Procurement Services• Expediting and Inspections• Construction Management & Site Supervision• Commissioning• Assistance to Plant Start-up and Operation• Operative Maintenance & Training• Supply of equipment and skid mounted units on

EP/EPC basis

Simeco S.p.A.

Page 6: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

PARTNERSHIP PRESENTATION6

Our mission is to operate in different fields of

engineering and architecture on behalf of private and

public customers, expressing their freedom of action

and choice in identifying the best solutions for each

project, in order to ensure the highest satisfaction of

our customers and the achievement of their targets.

Commitment, consistency and accountability are the

fundamental values through which we build the

confidence of our customers during the execution of

each project.

VISION AND MISSION

Page 7: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION7

Oil & Gas

FIELD OF ACTIVITIES

Water Infrastructures Environmental

Architecture, Civil Engineeering

Environmental EngineeringHydraulic & Coastal Engineering

Geology & Geotechnical EngineeringTown & Regional Planning

Roads & HighwaysRailroads

Bridges & StructuresWater, Drainage & Sewerage Systems

Sari Consulting Ltd.

Oil & Gas PlantsRefineries

Petrochemical PlantsChemical Plants

Power PlantsTank Farms

PipelinesRenewable Energies

Simeco S.p.A.

Page 8: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION8

YEARLY TURNOVER

$15M

2015

$7M

2014

$5M

2013

$15M

2015

$17M

2014

$19M

2013

Sari Consulting Ltd. Simeco S.p.A.

Page 9: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION9

JOINT VENTURE OFFICES WORLDWIDE

Milano, Italy

Rome, Italy

Sarajevo, Bosnia and Herzegovina

Kingdom of Bahrain

Lusaka, ZambiaKampala, Uganda

Maputo, MozambiqueCape Town, South Africa

Harare, ZimbabweNairobi, Kenya

Page 10: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION10

50+CLIENTS

500+ITEMS DELIVERED

500+PROJECTS

JOINT VENTURE WORKFORCE

More than 250 engineers and technicians to develop your ideas and support your business

Page 11: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

BUSINESS PRESENTATION 11

MEET OUR TEAM

Pierfranco FORLANI

President

Goffredo DEPASCALE

CEO

Antonio GNISCI

COO *

Lorenzo TAGLIABUENew BusinessDevelopment

Mirella REGGIANI

CFO

Alfonso PANTALENA

Relations with Oil Companies

Giuseppe PEDATACommunication & Relations

with Middle East countries

Pietro FONTANAOil & Gas Technical

Director

Gianluca GASPERINI

O&G ProcessTechnologies Director

Marco FORLANI

O&G OperationsDirector

Francesco GALLI **

Transportation & Water Technical Director

Francis BYARUHANGA

Executive Director Uganda

Jacob SIKAZWEExecutive Director

Zambia

Nico BEZUIDENHOUT

Executive Director S.A

• Managing Director of FG Tecnopolo Holding Srl

** Africa Director of SGI – Studio Galli Ingegneria Srl

Page 12: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

BUSINESS PRESENTATION 12

Our Quality Management System is certified by D.N.V. (Det Norske

Veritas) for conformity to the Requirements of ISO 9001:2008 for:

Multidisciplinary basic and detailed design of chemical, petrochemical,

refinery, power generation and of gas and oil pipelines. Equipment and

material procurement.

QUALITY MANAGEMENT SYSTEM

Page 13: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION13

WRc Group Stoat 4.01

Modelling of Waste Water Treatment Plants

LEDA FLOW

Flow Assurance, Dynamic Multiphase Flow

HTRI / MICROTECH / PV ELITE

Design of heat exchangers, aircoolers, pressure vessels

PDS / SMART PLAN / PDMS

CAD 3D of industrial plants

CAESAR II

Piping stress analysis

SPI (former INTOOLS), AVEVA Instrumentation

Instrumentation Database

PLC 2005

Software to design and plan PLC inputs-outputs

NEPLAN / AMPERE / ETAP

Design, optimization and simulation of electrical systems

MS PROJECT /PRIMAVERA P6

Project management (planning and control)

ASPEN ONE ENGINEERING DESKTOP / HYSYS / PRO II

Process simulators

BIOWIN 3

Analysis, testing and design of wastewater treatment plants

ANOVA Swater

Modelling of suspended-biomass wastewater treatment plant

AFT Arrow / Fathom / Impulse

Steady state & dynamic simulation of pipeline networks

DHI Mike

Integrated modelling of the entire water cycle (storm and waste waters, open channels, urban water networks,…).

CSdU Urbis Pro

Hydraulic simulation of flood waves in water basins

SANEX 2.0

Design and planning of septic tanks and sewers

EMS-I SMS (RMA2-RMA4)

2D hydro-dynamic modelling of waste waters

SOFTWARE TOOLS

Plant Design

Page 14: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION14

ESRI Arc View

Geographic Information System (GIS)

MAT 3D / FOUNDATION 3D

Design of foundations

STAAD PRO / SAP 2000

Structural Design

TEKLA

3D Modelling of steel structures

DIGICORP CIVIL DESIGN

AUTOCAD add-on for civil works, topography, road and railways design

MX Road Design / AutoTURN/ Civil 3D

Road Design

HDM-4

Economic analysis for roads and highways

ESRI Arc View

Geographic information system (GIS)

Sierrasoft ProST

Planning and accounting of civil works

SOFTWARE TOOLS

Civil Works & Infrastructures:

Page 15: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION15

2 Hanna Instruments photometers for analysis of free and total chlorine

2 two-channel Spectralog with incorporated 10 bar pressure transducer

9 one-channel Spectralog with incorporated 10 bar pressure transducer

2 Spectrascan bi-directional quadrina to gauge flow

2 Spectrascan gauge poles (for quadrina)

1 Palmer MC5 model micro-correlator

1 stetophon Sewerin listening poles with extensions

EQUIPMENT FOR ANALYSIS AND MONITORING OF

WATER AND DRAINAGE SYSTEMS

1 Sewerin AQUAPHON model geophone

1 Sewerin manhole cover detector

4 Casella Rain Gauges

1 MONTEC DETECT 3013 portable level-speedometer to gauge water

speed

1 ISCO sampler

1 SIGMA sampler

Page 16: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION16

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Pacific Future Energy (Canada)

Year: 2014

Project : British Columbia Greenfield Refinery, Canada (Feasibility Study)

Description: Pacific Future Energy Co. is committed to build and operate the world’sgreenest refinery on British Columbia’s north coast.

PFEC believes it is in Canada’s national strategic interest to gain access to internationalmarkets for Alberta’s oil, especially the fast growing Asian market.

The company believes it should not be done at the sacrifice of BC’s coast or broaderenvironment and must be done in full partnership with First Nations.

The $10 Billion refinery will be built in modules (each phase having a process capacityof 200,000 BPSD).

Page 17: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION17

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Milazzo Refinery (RaM)

Year: 2014-2015

Project : New Naphtha Hydrotreating Unit, Italy (Basic Design)

Description:

The scope of the Basic Design Package is a new naphtha hydrotreating unit namedHDT-3.

HDT-3 will produce 450,000 tons per year of hydrotreated Naphtha containing lessthan 0.5 ppmw of sulphur and 24,000 tons per year of olefin saturated LPG with targetspecification Pro Isomerization.

The plant will include a refurbished hydrotreating reactor and new pumps, heatexchangers in the preheating trains, fired heater, three-phase separators, reboiledstripper distillation tower, associated utilities, LPG and off-gas amine gas treatingpackages, recycle / make-up gas compressor package and control systems.

Page 18: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION18

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Milazzo Refinery (RaM)

Year: 2014-in progress

Contract Value (LSTK): 15M€

Project : Revamping of Kerosene Desulphurization Unit, Italy (EPC)

Description :

Project scope is a major revamping of the existing Kerosene HydrodesulphurizationUnit (HDS-1) to expand the capacity from 2,400 to 4,000 t/d.

Improvement of product quality to target specification Pro Clear and Bright andmaximum S content of 10 ppm are also foreseen.

New feed pumps, stripper, kero dryer and heat exchange train are being installed.

Page 19: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION19

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Eni R&M Division (Italy)

Year: 2011-2013

Contract Value (LSTK): 14M€

Project : Vacuum Column & Filtration System for FCC Slurry Oil (EPC)

Description :

Project scope is the installation of a new Vacuum Column & Automatic FiltrationSystem on the Slurry Oil stream produced by the existing FCC Plant of the Refinery.

The purpose of the new Unit is:1) to recover additional LVGO as feed for the Hydrocracking Unit2) to increase Slurry Oil flash point3) to remove the catalyst fines in order to feed the Clarified Oil (CLO) stream to the

existing Gasification Plant or to recycle it to the FCC riser .

Page 20: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION20

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Danieli Far East

Year: 2011-2012

Project : Carbon Dioxide Removal Unit (FEED + Detail Design + ProcurementServices)

Description:

Project scope was the Detail Design, the Equipment & Bulk Material Procurement andthe Home Office Project Management Services for the 10,000 Nm3/h Carbon DioxideRemoval Unit at an iron ore reduction plant.

The Unit, based on Giammarco-Vetrocoke hot carbonate process, was extensivelymodularized in order to facilitate the construction utilizing local labour.

Page 21: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION21

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Eni E&P Division

Year: 2010-2011

Project: Fauzia, Elettra & Benedetta Platforms, Adriatic Sea (FEED)

Description :

The project was carried out providing our Client with the EPC Tender Documents forn.3 new gas platforms located offshore Adriatic Sea and the relevant ± 15% CostEstimate.

SIMECO developed the Front End Engineering Design according to the following mainspecifications:

• FAUZIA PLATFORM: 12” export sealine; n° 2 wellheads double completion; 3-legsjacket.

• ELETTRA PLATFORM: 8” export sealine; n° 1 wellhead double completion; 3-legsjacket.

• BENEDETTA PLATFORM: 8” export sealine; n° 1 wellhead single completion;monopode.

Page 22: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION22

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Saipem SES

Year: 2008-2010

Project : OLT Livorno FSRU, Italy (Detail Design)

Description:

The world’s first offshore Floating Storage and Regassification Unit (FSRU) wasconstructed by converting the LNG Carrier Golar Frost.

The FSRU is permanently moored offshore Livorno, Italy, about 12 miles from the coastin a water depth of about 120 meters and connected to shore through a gas exportpipeline.

Storage capacity is 137,000 cubic meters of LNG in four spheres.

Production capacity is 3,75 billion standard cubic meters year (bscmpa).

Page 23: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION23

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Saipem (Iraq)

Year: 2010-2011

Project : Zubair Degassing Station, Iraq (FEED)

Description :

Project scope was the development of the Front End Engineering Design for a new OilDegassing Station (DGS) and rehabilitation of an existing one at Zubair field, Iraq.

The Zubair field - being developed by Eni with Occidental Oil Co., Korean Gas andMissan Oil Company - with an estimated production capacity of 1,200,000 BOPD is oneof the few super giant oil field presently developed worldwide.

Zubair is a “brown field” project involving the realization of new plants as well as therevamping of existing unit.

Page 24: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION24

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: ENI R&M Div.

Year: 2010-2011

Contract Value (LSTK) : 1.1 M€

Project : Electrically Traced Transfer Line for Liquid Sulfur at Eni’s TarantoRefinery, Italy (EPC)

Description:

Project scope was the installation of a new 4’’ x 1 km Liquid Sulfur transfer line fromthe Sulfur storage tanks to the flaker unit producing solid sulfur flakes.

The un-flanged transfer line is electrically heated by a skin effect tracing systemcapable to re-melt the sulfur in case of in line solidification.

Page 25: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION25

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Saipem

Year: 2009-2012

Project : EST Project at Eni’s Sannazzaro Refinery, Italy (Detail Design)

Description: EST (Eni Slurry Technology) is a new deep hydrocracking technologydeveloped by Eni for the valorization of heavy and extra heavy oils, tar sands andrefinery residues.

Sannazzaro Plant, with a capacity of 20,000 BPSD, will be the first industrial applicationof the EST technology, which has been extensively tested in a CommercialDemonstration Unit in Italy.

EST plant features n.2 x 2,000 t hydro-cracking reactors made of CrMoV + SS 347 WeldOverlay, supplied by GE-Nuovo Pignone, the largest built ever.

SIMECO has been in charge for the Technical Bid Evaluation and the follow-up of thehydro-cracking reactors, hydro-treating reactors (400 t) and large HP Gas/LiquidSeparators (300 t) made of CrMoV (supplied by ATB).

Page 26: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION26

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Eni SpA

Year: 2008-2009

Contract Value (LSTK): 8.5 M€

Project : C4 Dryers Package at Eni’s Sannazzaro Refinery, Italy (EPC)

Description:

The new C4 Dryer Package was designed to remove impurities (water, acetone,acetonitryle) from a C4 Olefinic Stream , feeding the existing Isomerization Unit.

The purification is obtained throughout adsorbents continuously regenerated. Theregeneration unit includes a hydrogenation reactor to remove to reduce olefins contentfrom the adsorbent regeneration stream.

The Unit is entirely installed on a steel structure “straddling” an existing pipe-way in avery congested area of the Refinery.

Page 27: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION27

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Saipem Energy Services

Year: 2009

Project : GOSP at Burun Oil Field, Turkmenistan (BDP review and assessment)

Description:

The Gas Oil Separation Plant (GOSP) at Burun Oil Field had some trouble operations,i.e. sand carry over, clogging of filters by paraffines contained in the crude oil and HSEissues.

The Scope of Work was to carry out, on a very tight schedule, a review of the existingBDP developed by the previous Owner of the Oil Field in order to solve the operatingproblems.

Each document of the BDP was reviewed and several inconsistencies were identified.For each document a Comment Sheet was produced.

Eventually, recommendations have been provided to Company regarding thepossibility to use the BDP as a basis for an EPC bid to de-bottleneck the Plant.

Page 28: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION28

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Bonatti

Year: 2008-2009

Project : Underground Gas Storage, Italy (Detail Design)

Description: Bordolano is a depleted gas field, 50 km from Milan (Italy), owned bySNAM Rete Gas/STOGIT (Stoccaggi Gas Italia).

STOGIT intended to convert the existing reservoir into an Underground Gas Storage.

The Plant consisted of a temporary gas compression and Injection station, called EarlyInjection Station, withdrawing natural gas from the national pipeline network ownedby Snam Rete Gas. Natural Gas was collected and delivered to the reservoir through 2new pipelines.

The Early Injection Station was dismantled once completed the injection phase of thecushion gas in the reservoir.

Page 29: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION29

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Saipem

Year: 2008-2009

Project : QAFCO V Ammonia Plant, Qatar (Detail Design)

Description:

The Project include N. 2 complete Ammonia Plants (Licensor Haldor Topsoe A/S -design capacity 2 x 2,200 t/d) based on Steam Reforming of Natural Gas consisting ofthe following process systems:Natural gas desulphurization; Process Air Compression; Steam Reforming of NaturalGas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA;Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration;Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator& BFW pumps.

Page 30: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION30

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Snamprogetti

Year: 2007-2008

Project : ENVEN 1.3 Project - Ammonia / Urea Plant, Pakistan (Detail Design)

Description : N.1 complete Ammonia Plant (Licensor Haldor Topsoe A/S; 2184 MTPD)based on Steam Reforming of Natural Gas consisting of the following process systems:Natural gas desulphurization; Process Air Compression; Steam Reforming of NaturalGas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA;Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration;Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator& BFW pumps. Urea Plant (Licensor Snamprogetti; 3835 MTPD) Process units havebeen connected to existing Facilities as: Instrument Air, Plant Air, Steam Generation,Power Generation, Raw Water, Potable Water, Natural Gas Treatment.

Page 31: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION31

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Tecnimont

Year: 2006-2007

Project: NKNK LLDPE/HDPE Plant, Russia (Detail Design)

Description: NKNK (Nizhnekamsk Neftekhim) LLDPE/HDPE is a Polyethylene Plantbased on the Spherilene Process Technology from Basell Italia.

The plant annual capacity is 230,000 MTPY of polyethylene in pallets, HDPE, MDPEand LLDPR type.

The units included in the engineering activities were: Polymerization Area, ExtrusionArea, Alkyl Area, Homogenization, Bagging, Palletizing and Warehouse,Interconnecting & Pipe Racks, Effluent Basin, Purification, Propane Storage, ControlRoom and Substation, Valve House, Flare Area, Underground.

Page 32: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION32

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: ENI Oil Co. Ltd, Libyan Branch

Year: 2005-2006

Project : Water Injection Plant & Power Generation System, El Feel Field, Libya(FEED)

Description : The Water Injection Plant (275,000 BWPD) consists of:Water Supply System, including Oil / Water separation by induced gas flotation,Filtration and Chemicals Injection Systems.

Injection Water System, consisting of: Buffer Tank, Injection Water Booster Pumps,Injection Water Pumps.

Gathering System, consisting of n. 5 Trunk-lines up to 24’’ x 38 km

The Power Generation Systems (50 MWe) consisting of: n. 3+1 Heavy Duty GasTurbines GE FR5-1 Dual Fuel fed with Crude Oil (chemically treated for V inhibition)or Natural Gas.

New dedicated Control Room & Electrical Sub-Station.

Page 33: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION33

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Milazzo Refinery (RaM)

Year: 2005 – 2008

Contract Value (LSTK): Phase 1 – 2.7 M€, Phase 2 – 2.9 M€

Project : Revamping of Marine Loading Arms, Italy

Description :

The Project consisted of two Phases:

During Phase 1, 4 x 16” existing Crude Oil Loading Arms at Pier 2/Mooring 5 weredismantled and replaced with 3 x 16’’ Loading Arms. During Phase 2, the sameoperation, as per Phase 1, were carried out on Pier 2 / Mooring 6.

FMC Technologies were in charge for the supply of the Loading Arms. SIMECOprovided Engineering Services, Procurement of piping materials and Supervisionduring Erection, Commissioning and Start-up.

Page 34: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION34

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Snamprogetti

Year: 2005

Project : ISOCRACKER at Sannazzaro de Burgondi Refinery, Italy (Detail Design)

Description:

Sannazzaro’s ISOCRACKER is a 25,000 BPSD Hydrocracking Plant based on ChevronLummus Global technology.

Scope of the Engineering Services executed by SIMECO and Partners included theMain Process Units along with the following Auxiliary Units:• Sour Water Stripper Unit• Amine Regeneration Unit• Interconnecting• Off-sites• Cooling Water Unit.

Page 35: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION35

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Snamprogetti Sud

Year: 2003-2004

Project : FCC GASOLINE HDS Unit at Eni’s Sannazzaro Refinery, Italy (DetailDesign)

Description:

Sannazzaro’s FCC Gasoline Hydrodesulphurization Unit is a 20,000 BPSD plant basedon CDHYDRO catalytic distillation technology by CDTECH.

Auxiliary Units were also included in the SOW.

Page 36: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION36

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: Snamprogetti Sud

Year: 2003

Project: Topping 2 Revamping Project at Eni’s Sannazzaro Refinery, Italy (DetailDesign)

Description:

Topping 2 was originally designed to process 715 t/h of Arabian Light Crude Oil.A major de-bottlenecking to process up to 770 t/h of Djeno Melange Crude Oil wasrequired.

The revamping consisted of:

• Addition of a new Pre-flash Column upstream of the existing Topping Columnalong with relevant Heaters and Pumps;

• Design of new steel structures Complete review/check of the existing Utilities andOff-sites systems, i.e. BD, Utilities, Closed Drain.

Page 37: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION37

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: PRAOIL Oleodotti Italiani

Year: 2003-2004

Project : Genoa De-bottlenecking Project, Italy (Detail Design)

Description:

Underground interconnecting to upgrade and rationalize the 100 years old oil productsoffloading marine terminal in Genoa.

“Trench-less” and “micro-tunnel” technologies have been deployed due to the verypopulated and geologically critical areas.

4 x 30” + 2 x 12” pipelines have been laid down in a 2.6 m x 650 m micro tunnelbetween Genoa Marine Oil Terminal and Praoil Petroleum Products Depot & PumpingBooster Station.

Page 38: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION38

Simeco S.p.A.

REFERENCE – OIL & GAS SECTOR

Client: VISCOLUBE

Year: 2001-2003

Project : Spent Lube Oil Re-refining Plant and Offsites Revamping , Italy (FEED +Detail Design + Procurement Services)

Description:

VISCOLUBE is the European leader in re-refining of spent lube oils, with over 60,000MTPY of reclaimed oils.

The Spent Lube Oil Hydrotreating Unit is based on Axens technology.

The Plant includes a Hydrogen Generation Unit designed by CALORIC Anlagenbau(Germany). CALORIC is a firm specialized in supply of gas generation plant package,i.e.: syngas, carbon monoxide, hydrogen.

Page 39: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION39

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Eni, Venice Refinery

Year: 2014

Project: Revamping of S. Leonardo Oil Terminal – Feasibility Study

Description:

Venice Refinery scope was to convert San Leonardo Crude Oil receiving terminal to finished product terminal for ship with DWT variable between 10.000 to 80.000 Tons.The Feasibility Study included: • the verification about the possibility to re-use the existing loading arms; • the study of the modification of the existing lines in order to optimize discharge rates

and operability;• the verification of the mooring systems, including:

• Jetty height above the average sea-level • Jetty structural integrity• Status of the existing mooring equipment • Analysis of ship positioning • Identification and sizing of new mooring points.

Page 40: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION40

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Eni, Livorno Refinery

Year: 2013

Project: Revamping of the existing LPG Terminal

Description:

The Scope of Work included the revamping of the existing LPG terminal in order to unload LPG carrier up to 30,000 DWT with a discharge rate of 500 ton/h.

The Scope of Work included the verification of the mooring systems, including:• Jetty height above average sea-level • Status of the existing mooring equipment • Mooring study, i.e. analysis of ship positioning, identification and sizing of new

mooring points.

Page 41: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION41

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Genoa Port Authority

Year: 2011

Project: Study of petroleum products transfer operations under steady state andtransient conditions

Description:

The main purpose of the study was to carry out the Conceptual Design of a system toprotect the lines and the loading arms from overpressures during operations

The activities carried included:

• Steady state analysis of loading/unloading operations to determine themaximum allowe transfer rates.

• Transient state analsysis of the pressure peak over the lines and the loading incase of emergency shut down (i.e. water hammer effect due to block valve closure)

• Conceptual Design of the High Integrity Pressure Protection System (HIPPS).

Page 42: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION42

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Snamprogetti

Year: 2006 – 2007

Project: Trans Anatolian Pipeline, Turkey (Conceptual Design + FEED).

Description : The Project included the following facilities: A new unloading terminallocated east of Samsun, on the Black Sea, suitable for handling a wide range of tankers,including VLCCs, through three (3) Single Point Moorings and relevant unloadingfacilities; A new tank farm located east of Samsun, on the Black Sea, featuring 12floating roof storage tanks (total net capacity of 1,500,000 m3), including all relevantfacilities and a new dedicated power plant; A 48”and 42” (for the last section), 550 kmlong carbon steel pipeline provided with a Pressure Reducing Station (PRS), mainlineisolation block valves and pigging trap systems; One head pump station (PS1) locatedat the unloading terminal on the Black Sea and three additional pump stations (PS2,PS3, PS4) located along the route of the TAP pipeline at different elevations, providedwith power generation and all required facilities such as control rooms,accommodation, security and maintenance buildings; A new tank farm located atCeyhan, featuring 12 floating roof storage tanks (total net capacity of 1,800,000 m3),including all relevant facilities; A new jetty marine loading terminal, on theMediterranean Sea, located in front of the new Ceyhan tank farm, suitable for a widerange of tankers, including VLCCs..

Page 43: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION43

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Eni, Gaeta Oil Terminal

Year: 2003

Project: Feasibility Study of a New Multibuoy Mooring Terminal for carriers up to40,000 DWT

Description:

The scope of the study was to investigate different alternatives for the expansion of the existing Oil Terminal.

In particular, the Feasibility Study addressed:• The new subsea Pipeline End Manifold (PLEM)• n. 3 sealines for trasnfer of oil products• The study of n. 5 Buoys + swamp mooring.

Page 44: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION44

Simeco S.p.A.

REFERENCE – MARINE OIL TERMINALS

Client: Compagnia Italpetroli Spa

Year: 1997

Project: Civitavecchia New Oil Terminal – Basic Design

Description:

The project included:• n.1 single buoy mooring system (water depth 50 m)• n.2 24’’ x 2.2 km sealines + n.2 24’’ x 1.15 km on-shore lines for transfer of fuel oil; • n.2 22’’ x 2.2 km sealines + n.2 22’’ x 4.7 km on-shore lines for transfer of light

petroleum products (i.e. gasoline, kerosene, diesel).

SIMECO carried out the basic design for the single buoy mooring system and the pipelines.

The type of foundations have been designed based on site geological data, while metocean data (wind, waves, streams,….) have been used as a basis for the mooring study in order to select the most suitable mooring equipment.

Page 45: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION45

Simeco S.p.A.

REFERENCE – ENERGY SECTOR

Client: Enipower

Year: 2010

Project : Combined Heat & Power Plant Revamping , Italy (FEED)

Description:

Project scope was the Front End Engineering Design for the revamping of EnipowerCombined Heat & Power Plant located in Bolgiano, San Donato Milanese, Italy.

The revamping consisted in dismantling the existing power generation units and theirreplacement with a new gas turbine (aero derivative type), installation of n.2endothermic engines with waste heat boilers for power generation and production ofhot water, n.3 auxiliary boilers, n.10 buffer tanks for hot water distribution to theexisting district heating network, n.1 new pumping station, new electrical room, newtechnical room.

SIMECO Scope of Work included also +/- 15% cost estimate and preparation of theEPC Tender Documents.

Page 46: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION46

Simeco S.p.A.

REFERENCE – ENERGY SECTOR

Client: Maire Engineering

Year: 2007

Project : Bocamina II - Power Plant, Chile (Basic + Detail Design)

Description: Bocamina II is a 370 MWe Coal Power Plant owned by Endesa located inPuerto Coronel, 30 Km SE of Concepcion, Chile.

The Plant features a SES Boiler and a GE Steam Turbine model D5.

SIMECO and JV partners Scope of Work covered Basic Engineering and DetailedMechanical Design for Piping Engineering, including 3D modeling, of the followingsystems:Steam Generation, Auxiliary Steam System, Machinery Cooling, De-mineralized Water,Instrument Air, Fire Fighting Water, Waste Water, Condensate Recovery, VacuumCondenser, Boiler Feed Water, Fuel Oil, Sampling, Chemical Injection.

Page 47: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION47

Simeco S.p.A.

REFERENCE – ENVIRONMENTAL SECTOR

Client: Eni R&M Division

Year: 2011-2012

Project: Waste Water Treatment System for Water Re-use at Eni’s SannazzaroRefinery, Italy (Detail Design)

Description:

Project scope is the installation of a new Waste Water Treatment Package to process 740m3/h of water discharged from the existing Refinery Water Treatment System, toobtain permeated desalted water (conductivity < 100 µS/cm, hardness < 5 mg/l asCaCO3 ) suitable for steam generation.

The purpose of the new Unit is to recycle water previously discharged to theenvironment in order to feed the existing demineralized water production system forthe requirements of the new Process Plants .

Page 48: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION48

Simeco S.p.A.

REFERENCE – ENVIRONMENTAL SECTOR

Client: Polimeri Europa

Year: 2006 – 2007

Contract Value (LSTK): 6 M€

Project: TAS (Waste Water Treatment) Covering System at Sarroch PetrochemicalComplex, Italy (EPC)

Description:

The New Unit recovers as condensate the vapors produced at existing jetty on oiltankers during loading operations and as well the vapors produced in the APISeparator basins.

A GRP fixed roofing system, pressurized with nitrogen, is provided on the APISeparator basins to recover and neutralize hazardous vapors.

The New Cryogenic Condensation Unit was designed to reduce emissions of VOC(Volatile Organic Compounds) to the atmosphere, in compliance with the most recentEU environmental standards.

Page 49: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION49

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Ministry of Local Government and Housing , ZAMBIA

Year: May 2014 - ongoing

Contract Value: 1mln USD

Project : Consulting Services For The Design And Supervision Of The ExpansionAnd Rehabilitation Of Water And Sewerage Infrastructure – Choma

Description : The Ministry of Local Government and Housing intended to providefunds to Southern Water and Sewerage Company Limited, the Water Utility mandatedto provide water and sewerage services in Southern Province, to ensure that the watersupply and sanitation situation in the town of Choma is improved in order to supportthe activities of the Provincial Capital. The activities proposed to be undertaken in theimprovement of water supply and sewerage systems have, wherever possible, beenlinked to measurement indicators which will assist to evaluate progress towardsimprovement of service quality and efficiency in Choma Town.

Page 50: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION50

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Ministry of Energy and Public Utilities, MAURITIUS and the outer island ofRodrigues

Year: 2010 – 2012

Contract Value: 813. 282, 07 USD

Project : Hiring of Consultancy Service for Mauritius Wastewater Master Plan Study

Description : The Study for the Sewerage Master Plan of Mauritius is focused on theattainment of three objectives: The first objective is the formulation of a phasedprogramme covering a period of 20 years (2014-2033) for implementing wastewatersystem improvements to meet future demands in main islands of Mauritius and theouter island of Rodrigues. The second objective is the delivery of wastewater sectormaster plan report that will detail the investments needed for the twenty years periodand will recommend the actions to optimize the management of assets as well asachieve financial efficiency and environmental compliance. The third objective is theformulation of a feasibility study for urgent projects to be implemented in the first tenyears of the Plan

Page 51: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION51

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: République du Niger, RIVER NIGER

Year: 2010 – 2011

Contract Value: 182.000 EU

Project : Preparation of a master plan for water supply targeting villages on the RiverNiger

Description : The aim of the project is the preparation of master plan for water supplyin the River Niger territory, that will be part of the studies and researches necessary forthe Ministry of Hydraulic and for the other Stakeholders charged of planning the AEPprogramme in the river valley. Specifically the project includes specific objectives:• The definition of the program context and preliminary analysis of the area;• The preparation of a general plan for the water supply, starting with surface water.• The involvement of all the relevant actors concerned aiming at obtaining the

general approval on the plan

Page 52: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION52

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Sierra Leone Water Company Ministry of Energy and Power Ministry ofEnergy and Power

Year: 2006 – 2009

Contract Value: 681, 187.51 USD

Project : Water Supply & Sanitation Project ( in the towns of Makemi, Bo andKenema) Rural Water Supply and Sanitation

Description : To develop a full proposal of the rural water supply sanitation initiative(RWSSI) of Sierra Leone that will facilitate both the mobilization of financial supportand detailed implementation requirements:• To prepare an economically and technically sound project for the water supplies of

Makeni, Bo and Kenema towns.• To assess the rural water supply and sanitation of the country and prepare a rural

water supply sanitation Program.• To Prepare an action plan to meet the needs of year 2015 that will be include the

identification and designing of a priority scheme on a pilot basis.

Page 53: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION53

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Water Management Authority –Mauritius, MAURITIUS

Year: 2003 – 2007

Contract Value: 976,378.32 USD

Project : Rehabilitation of Infrastructures on CHA Estates – Extension of Phase III

Description : Rehabilitation of sewerage infrastructure on Housing Estates inMauritius. Involves the construction of reticulation Networks to cater for 2, 777 housesconnections to the main sewer; two sewage pumping stations and construction ofoutfall Sewer 3,67 km long as well as rising main 1315 km long

Page 54: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION54

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Water Management Authority –Mauritius, MAURITIUS

Year: 2002 – 2003

Contract Value: 153,178 USD

Project : Rehabilitation and Improvement of Infrastructure on CHA Estates –Extension of Phase II

Description : Over the period 1960 -1988 a total of 158 housing estates were built acrossthe Country to provide shelter. For families made homeless as a result of cyclones.However the housing estates lacked adequate facilities such as roads, water supply,sewerage, surface water drainage and waste collection. During the years 1990 to 1998the Phase I the Rehabilitation of Infrastructure Program was launched for the provisionof sewerage facilities to some estates Phase II of this Programme has been extendedthrough a Project for the rehabilitation of a satisfactory collection and disposal ofsewage in seven housing estates serving a population of 24 000 in habitants.

Page 55: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION55

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Ministry of Water Dar es Salaam ,TANZANIA

Year: 1998 – 2002

Contract Value: 1.282. 907 USD

Project : Consultancy Services for the Institutional Strengthening for Urban Waterand Sewerage Improvements in Tanzania

Description : The project purpose is the strengthening of the capacity of the UrbanWater and Sewerage Authorities (UWSAs) in Mwanza, Iringa, Mbeya, and Mtwara, interms of management, personnel and equipment. The consulting services aim atenhancing the Ministry Officers’ expertise and know how in order to ensure the localgovernment an autonomous management of the waste water system. The consultantsservices are also intended to:• Safeguard water resources;• Identity adequate financial resources;• Promote an industrial policy for the improvement of the existing control of water

resources and utilities

Page 56: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION56

Sari Consulting Ltd.

REFERENCE – WATER SECTOR

Client: Ministry of Natural Resources and Energy Water Department, GUINEABISSAU

Year: January - November 2001

Contract Value: 301,073 USD

Project : Technical Assistance for the Institutional strengthening of the WaterSupply and Sewerage

Description : The project overall objective in enhancing the national watermanagement system by providing consulting services to the Ministry of NaturalResources and Energy in Guinea Bissau. The Coverage of the water treatment anddistribution network is inadequate due to the inability to operate and maintain thepublic facilities effectively. Therefore the projects aims at strengthening theautonomous management of those facilities at regional and local levels.

Page 57: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION57

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: ANE , Mozambique

Year: February 2015 - 2019

Contract Value: USD 3.757.000 + MZN 9.430.000

Project : The multinational Nacala Road Corridor Project – Phase I:ConsultingServices for Design Review and Update and Supervision of Civil Works for Lot D:Cuamba-Muita (138 km) and Technical Assistance to ANE

Description : The Government of Mozambique intends to upgrade the strategic NacalaCorridor to provide a more economical, reliable, and seamless flow of goods andservices between the countries of the region and at the same time to stimulate theregional economy in the northern part of Mozambique, where the lack of all weatherroads is a major constraint on development. Currently, the Nampulato Cuamba (348km) stretchis under implementation on in three subsections.

Page 58: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION58

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Road Development Agency (RDA), ZAMBIA

Year: June 2015 - Ongoing

Contract Value: USD 1.000.000

Project : Consulting Services for the detailed engineering designs and supervision ofthe construction of urban roads using segmented/concrete paving block andcobblestone technology in Northern and Luapula Provinces (250 km)

Description : The principal, overall objective of the services is to perform the necessarysurveys, detailed engineering designs, preparation of Bill of Quantities to be usedduring implementation by Contractors with a view of improving road infrastructureand general aesthetics in urban areas through the use of segmented paving blocks andcobblestones.

Page 59: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION59

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Road Development Agency (RDA), ZAMBIA

Year: April 2015 - Ongoing

Contract Value: USD 1.000.000

Project : Consulting Services for the detailed engineering designs and supervision ofthe construction of urban roads using segmented/concrete paving block andcobblestone technology in Central and Muchinga Provinces -350 km

Description : The urban roads in deplorable condition in Central and MuchingaProvinces are part of the Pave Zambia 2000 project which is an initiative of theGovernment of the Republic of Zambia aimed at constructing urban roads usingsegmented Paving Blocks through labor intensive methods. The services shall includefeasibility study, skill-development, materials, equipment and labor forceidentification, SME and local construction sector development, contract managementand sustainability and commercialization to support Pro-poor development throughJob creation.

Page 60: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION60

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of infrastructure Development, TANZANIA

Year: November 2011 – ongoing

Contract Value: USD 1.670.000

Project : Consulting services for design review and pre-contract services andconstruction supervision of the upgrading of Namtumbo – Tunduru road (193 km) tobitumen standard lot A: Namtumbo – Kalimesera section (60.7 km)

Description : The Namtumbo – Tunduru road is situated in Ruvuma Region, Southernpart of Tanzania bordering Malawi to the West and Mozambique to the South. The 193km road starts from Namtumbo and runs through woodland, bush land thicket andgrasslands and crosses Selous-Niassa wildlife corridor over a 40 km stretch and ends inthe center of the Tunduru District. The final objective of the assignment is to undertakeconsultancy services on behalf of TANROADS for the design review, pre-contractservices and supervision of construction works.

Page 61: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION61

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Uganda National Roads Authority (UNRA), UGANDA

Year: 2011 – 2015

Contract Value: USD 2.233.000

Project : Consulting services for design review and construction supervision ofHOIMA-KAISOTONYA (92 KM)

Description : The Hoima-Kaiso-Tonya Road (92 Km) is currently a gravel road locatedin Hoima District on Western Uganda and is about 225 Km west of Kampala. The scopeof the Consultancy Services are two:• Carry out the review and update of the existing engineering design and make all

amendments and additional studies for the soundness and sufficiency of thedetailed engineering design and bid documents

• Provide Construction Supervision during the pre-construction and theconstruction periods and during the Defects Liability Period

Page 62: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION62

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: TANROADS, TANZANIA

Year: 2011 – 2006

Contract Value: USD 1.593.000

Project : Supervision of Works for the upgrading of the road Isaka – Nzega

Description : The Nzega-Isaka road is part of the Dar Es Salaam-Mwanza road whichtransverses the towns of Morogoro, Dodoma, Manyoni, Singida, Nzega and Mwanza(towards the north). After starting off at Nzega, the road cuts across rich agriculturalareas and terminates at Isaka connecting towns, district headquarters and economicgrowth center. The rehabilitation of his section is part of a wider project providing forthe upgrading of the entire section Mwanza Border-Nzega from gravel roads to a ClassI trunk road in bitumen pavement standard. The road influence area is about 20,000km2.

Page 63: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION63

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of WorksMDI Road Kanifing , THE GAMBIA

Year: 2007 - 2009

Contract Value: USD 1.366.000

Project : Supervision of rehabilitation and upgrading works of trunks roads in TheGambia and Senegal (Lot1)Road length: 19.9 Km.

Description : Lot1 : Barra to Amdellai section (19.9 km) of the Trans West AfricanHighway connecting Banjul the capital of Gambia with Senegal. Lot2: Soma to Basseand Velingara the major section of the South bank truck linking the capital Banjul andthe provincial towns(215.5 km)

Page 64: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION64

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of Finance, BENIN

Year: 2004 - 2008

Contract Value: USD 1.038.000

Project : Technical Assistance to the control and supervision works for thesettlement of bituminous roads NATITINGOU- PORGA

Description : The Natitingou – Porga road (102 km) represents one of the mostimportant parts of the Inter-state National Road n 3 which connects Benin and BurkinaFaso. The road is a two lane highway with 3 bridges (average length 25 meters). Theproject focuses on supervising the works concerning bituminous settlement in theNATITINGOUPORGA road

Page 65: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION65

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: NAO (National Authorizing Office), SIERRA LEONE

Year: 2003 – 2006

Contract Value: USD 1.160.000

Project : Consultancy Services for the Management and Supervision of WorksContract for the Construction of the Freetown-Conakry Highway Phase I

Description : Reconstruction of the Rogbere-Pamelap Road in the Republic of SierraLeone of approximately 77 km length based on the approved design and contactdocuments; Reconstruction of the Pamelap-Farmoreah Road in the Republic of GuineaConakry of approximately 9 km length, based on the approved design and contractdocuments.

Page 66: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION66

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of Transport and Public Works, MADAGASCAR

Year: 2003 - 2006

Contract Value: USD 3.594.000

Project : Detailed Design, procurement and supervision of the rehabilitation work ofthe National Roads N. 44 and N 3. Study for the Periodic Maintenance of Road RN 2.

Description : The project includes the rehabilitation and maintenance national primaryand secondary road network corridors which connects the capital of Madagascar to thevery important economic regions of the country such as Lac Alaotra through thenational road RN 44 in bituminous concrete pavement and to the port of Toamasinathrough the national Road n.2 .

Page 67: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION67

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of Transport and Public Works, MADAGASCAR

Year: 2003 - 2005

Contract Value: USD 1.690.000

Project : Planning , Control and Supervision of Construction works of the RN5Abetween Sambava and Antalaha and of Antalaha harbour’s resettlement works.

Description : The main objective of the project is to rebuild the Nat ional Road RN5A,between the cities of Sambava and Antalaha, in the north-east of the island. This road is180 km long, included 1.5 km of urban road inside the city of Antalaha, road inbituminous concrete pavement. The construction and rehabilitation works on this roadaim at the economic development of the region the main tasks concern the constructionand reconstruction of different bridges and the building of riprap foundation of theharbor infrastructures.

Page 68: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION68

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of Transport and Public Works, MADAGASCAR

Year: 2002 – 2004

Contract Value: USD 1.339.000

Project : Supervision for the works of Reinforcement of Structural Network of LotProjects from 4 to 7

Description : The project concerns the backing of several sections and thereconstruction of the access to the Toamasina harbor. The roads leads in concretepavement from Brickaville to Toamasina (total Length 115 Km).

Page 69: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION69

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Ministry of Road and Transport, GHANA

Year: 2001 – 2004

Contract Value: USD 1.280.000

Project : Technical Assistance Towards the Efficient, Effective and SustainableManagement of Maintenance in the Road Sub-Sector Project No.8 ACP GH 009

Description : The project entails the review of all existing systems and implementsactions required to put the road maintenance management in the Ministry of Roadsand Transport’s road agencies Ghana Highway Authority (GHA), Department ofFeeder Roads ( DFR) and Department of Urban Roads (DUR) on an efficient, effectiveand sustainable basis.

Page 70: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION70

Sari Consulting Ltd.

REFERENCE – ROAD SECTOR

Client: Cabinet of Vice prime minister in charge of Economic and SocialReconstruction, GUINEA BISSAU

Year: 2000 – 2003

Contract Value: USD 301.000

Project : Short term technical assistance to the general direction of transportinfrastructures

Description : The project aims at assisting the Ministry of Social Reconstruction(General Directorate of Transport Infrastructures – DGIT) in developing new policiesfor the setting-up of a privatized management of the road sector in cement concretepavement. A permanent technical assistance is provided to the management ofdifferent types of development projects with a major focus on those financed under theEDF.

Page 71: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION71

Sari Consulting Ltd.

REFERENCE – BUILDING SECTOR

Client: Republic of Uganda through the Ministry of Public Service

Year: July 2012 - Ongoing

Contract Value: USD 500.000

Project : Consulting Services to Prepare Designs, Tender Documents and Supervisethe Refurbishment of the Proposed Civil Service College Uganda (CSCU).

Description : The consultancy services entails feasibility study, preparation oftopographical survey, socio/environmental study and geotechnical study includingpreliminary and outline designs and cost estimates; preparation of detailedarchitectural & engineering designs including tender documents and tender action andconstruction supervision including the defects liability period.

Page 72: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION72

Sari Consulting Ltd (SARI) operating offices are at:

via Giacomo Peroni 452, Rome, Italy

SARI Consulting (Zambia) Limited, Company Registration N. 111853. Plot N. 53, Central Street, Jesmondine, Lusaka, Zambia

SARI Consulting (Mozambique) Ltd, Av. Kwame Nkrumah, 1335, Maputo , Mozambique

SARI Consulting (Uganda) Ltd , Plot 26 Flat B, Golf Course Road, OffWampewo Avenue, Kololo, P.O.Box 6960, Kampala, Uganda

SARI Consulting (Zimbabwe) Ltd, 40 Arcturus Road Highlands, Harare, Zimbabwe

SARI Consulting (Kenia) Ltd, Upper Hill on Kiambere Road, Casia B2 next to former World Bank offices

SARI Consulting (South Africa) Ltd, 20 Weenen Road, Milnerton, Cape Town 7441

Sari Consulting Ltd

Page 73: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION73

SIMECO operating offices are at:

Via Arcivescovo Romilli 22, 20139 Milano, Italy

Petrodar Tower, Office Suite 32, Al Seef District, Kingdom of Bahrain

Simeco Systems d.o.o., Gradacacka 29B, 71000 Sarajevo, Bosnia and Herzegovina

Simeco S.p.A.

Page 74: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

SARI CONSULTING LTD and SIMECO SPA

JOINT VENTURE PRESENTATION74

SARI Consulting Ltd.

Mr. Goffredo DE PASCALE

CEO

via Giacomo Peroni 452

Rome

ITALY

Phone : + 39 06 45563173

Fax : + 39 06 45563109

e-mail:

sari@sariltd. com

[email protected]

Website: www.simeco-sari.com

CONTACT

Page 75: Simeco_Sari_JV_Business PresentationV1 8(10 11 2015)_FINALE

THANK YOU FOR YOUR

KIND ATTENTION

We look forward to seeing you again.

Sari Consulting Ltd and Simeco Spa