JOINT VENTUREPRESENTATION
Together we build something better
WELCOME TO OUR
WHO WE ARE?
SARI Consulting Ltd is a quality-driven, leading engineering company with over 18 years experience in the provision of independent professionalmanagement, strategic advice, design of infrastructures and environmental engineering. SARI is a company participating in FG Tecnopolo Alliance. FGTecnopolo Alliance is an initiative of FG Tecnopolo Holding, a structured network of partner companies specialized in consulting services in the fields ofarchitecture, engineering, and information technology, delivering fully integrated design services for large scale projects. The FG Tecnopolo Alliance businessmodel is based on the integration of skills of the individual Companies participating in the coalition, which while preserving their independence, contributeto the definition of integrated and harmonized design proposals. The scope is to provide integrated consultancy services characterized by the MaximumSpecialization in the disciplines, thanks to the excellent standard of all Partners, through the interface of the Structured Organization of FG TecnopoloAlliance.
SIMECO Spa is a leading mid-size engineering and contracting company, established in 1984, providing:
• qualified and competitive services from basic design & FEED to detail engineering and site services, for Oil & Gas plants (On-shore/Off-shore UpstreamFacilities, Refining), Pipelines, Petrochemical & Chemical Plants, Power Plants (including renewable energies), Plant Off-sites & Utility Generation Units;
• contracting for the execution of projects on turn key lump sum basis;
• design and supply of skid mounted plants.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION3
Sari Consulting Ltd (SARI) activity cover:
• Economic and financial analysis, feasibilitystudies, and concessions of infrastructureprojects;
• Institutional strengthening and capacity-building, assistance to program management, aswell as programming for operation andmaintenance of infrastructure and equipment;
• Irrigation/Agricultural planning, includingdesign and/or modernization of infrastructure;
• Technical assistance, planning, studies, designand/or construction supervision of all types oftransport infrastructure, building technology,water and environment, in projects ranging frommajor infrastructure to small local projects.
SARI Clients include: Developing Aid Agencies,Government Ministries Municipal Authorities,Private Sector Companies.
SARI is registered with the majority of fundingagencies such as the European Union (EDF), andInternational Financial Institutions such as the WorldBank Group (IBRD/IDA), the African DevelopmentBank (AfDB), and the Asian Development Bank.
Sari Consulting Ltd.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION4
Sari Consulting Ltd (SARI) has carried out projectsin the following countries:
Africa:Tanzania, Uganda, Zambia, Mozambico, Gambia,Guinea Bissau, Benin, Sierra Leone, Madagascar,Ghana , Mauritius, Niger, Lesotho, Angola, Morocco,Djibouti, Rwanda, Botswana, Angola, Seychelles ,Nigeria, Burkina Faso, Republic of Congo(Brazaville), Malawi, Somalia, Togo, Algeria,Comore Islands , Egypt, Tunisia, Libya, Ivory Coast,Guinea (Conakry), Liberia, Senegal
Central & South America:Saint Lucie(West Indies), Haiti, Honduras, Ecuador,Nicaragua, Venezuela, El Salvador, Guatemala
AsiaPakistan, India, Philippines, Thailand, Indonesia,Myanmar, Mongolia
OceaniaVanuatu
EuropeItaly, Albania
Sari Consulting Ltd.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION5
Simeco S.p.A. possess the organization and theskilled experienced staff to provide the followingservices to the Oil & Gas, Petrochemical andChemical Industry:
• Feasibility Studies and Cost Estimates• Conceptual Design• Basic Engineering Design• Front End Engineering and Design (FEED)• Project Management• Project Management Consultancy• Owner’s Engineering Services• Risk Analysis and HSE Reports• Detail Engineering• Procurement Services• Expediting and Inspections• Construction Management & Site Supervision• Commissioning• Assistance to Plant Start-up and Operation• Operative Maintenance & Training• Supply of equipment and skid mounted units on
EP/EPC basis
Simeco S.p.A.
SARI CONSULTING LTD and SIMECO SPA
PARTNERSHIP PRESENTATION6
Our mission is to operate in different fields of
engineering and architecture on behalf of private and
public customers, expressing their freedom of action
and choice in identifying the best solutions for each
project, in order to ensure the highest satisfaction of
our customers and the achievement of their targets.
Commitment, consistency and accountability are the
fundamental values through which we build the
confidence of our customers during the execution of
each project.
VISION AND MISSION
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION7
Oil & Gas
FIELD OF ACTIVITIES
Water Infrastructures Environmental
Architecture, Civil Engineeering
Environmental EngineeringHydraulic & Coastal Engineering
Geology & Geotechnical EngineeringTown & Regional Planning
Roads & HighwaysRailroads
Bridges & StructuresWater, Drainage & Sewerage Systems
Sari Consulting Ltd.
Oil & Gas PlantsRefineries
Petrochemical PlantsChemical Plants
Power PlantsTank Farms
PipelinesRenewable Energies
Simeco S.p.A.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION8
YEARLY TURNOVER
$15M
2015
$7M
2014
$5M
2013
$15M
2015
$17M
2014
$19M
2013
Sari Consulting Ltd. Simeco S.p.A.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION9
JOINT VENTURE OFFICES WORLDWIDE
Milano, Italy
Rome, Italy
Sarajevo, Bosnia and Herzegovina
Kingdom of Bahrain
Lusaka, ZambiaKampala, Uganda
Maputo, MozambiqueCape Town, South Africa
Harare, ZimbabweNairobi, Kenya
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION10
50+CLIENTS
500+ITEMS DELIVERED
500+PROJECTS
JOINT VENTURE WORKFORCE
More than 250 engineers and technicians to develop your ideas and support your business
BUSINESS PRESENTATION 11
MEET OUR TEAM
Pierfranco FORLANI
President
Goffredo DEPASCALE
CEO
Antonio GNISCI
COO *
Lorenzo TAGLIABUENew BusinessDevelopment
Mirella REGGIANI
CFO
Alfonso PANTALENA
Relations with Oil Companies
Giuseppe PEDATACommunication & Relations
with Middle East countries
Pietro FONTANAOil & Gas Technical
Director
Gianluca GASPERINI
O&G ProcessTechnologies Director
Marco FORLANI
O&G OperationsDirector
Francesco GALLI **
Transportation & Water Technical Director
Francis BYARUHANGA
Executive Director Uganda
Jacob SIKAZWEExecutive Director
Zambia
Nico BEZUIDENHOUT
Executive Director S.A
• Managing Director of FG Tecnopolo Holding Srl
** Africa Director of SGI – Studio Galli Ingegneria Srl
BUSINESS PRESENTATION 12
Our Quality Management System is certified by D.N.V. (Det Norske
Veritas) for conformity to the Requirements of ISO 9001:2008 for:
Multidisciplinary basic and detailed design of chemical, petrochemical,
refinery, power generation and of gas and oil pipelines. Equipment and
material procurement.
QUALITY MANAGEMENT SYSTEM
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION13
WRc Group Stoat 4.01
Modelling of Waste Water Treatment Plants
LEDA FLOW
Flow Assurance, Dynamic Multiphase Flow
HTRI / MICROTECH / PV ELITE
Design of heat exchangers, aircoolers, pressure vessels
PDS / SMART PLAN / PDMS
CAD 3D of industrial plants
CAESAR II
Piping stress analysis
SPI (former INTOOLS), AVEVA Instrumentation
Instrumentation Database
PLC 2005
Software to design and plan PLC inputs-outputs
NEPLAN / AMPERE / ETAP
Design, optimization and simulation of electrical systems
MS PROJECT /PRIMAVERA P6
Project management (planning and control)
ASPEN ONE ENGINEERING DESKTOP / HYSYS / PRO II
Process simulators
BIOWIN 3
Analysis, testing and design of wastewater treatment plants
ANOVA Swater
Modelling of suspended-biomass wastewater treatment plant
AFT Arrow / Fathom / Impulse
Steady state & dynamic simulation of pipeline networks
DHI Mike
Integrated modelling of the entire water cycle (storm and waste waters, open channels, urban water networks,…).
CSdU Urbis Pro
Hydraulic simulation of flood waves in water basins
SANEX 2.0
Design and planning of septic tanks and sewers
EMS-I SMS (RMA2-RMA4)
2D hydro-dynamic modelling of waste waters
SOFTWARE TOOLS
Plant Design
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION14
ESRI Arc View
Geographic Information System (GIS)
MAT 3D / FOUNDATION 3D
Design of foundations
STAAD PRO / SAP 2000
Structural Design
TEKLA
3D Modelling of steel structures
DIGICORP CIVIL DESIGN
AUTOCAD add-on for civil works, topography, road and railways design
MX Road Design / AutoTURN/ Civil 3D
Road Design
HDM-4
Economic analysis for roads and highways
ESRI Arc View
Geographic information system (GIS)
Sierrasoft ProST
Planning and accounting of civil works
SOFTWARE TOOLS
Civil Works & Infrastructures:
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION15
2 Hanna Instruments photometers for analysis of free and total chlorine
2 two-channel Spectralog with incorporated 10 bar pressure transducer
9 one-channel Spectralog with incorporated 10 bar pressure transducer
2 Spectrascan bi-directional quadrina to gauge flow
2 Spectrascan gauge poles (for quadrina)
1 Palmer MC5 model micro-correlator
1 stetophon Sewerin listening poles with extensions
EQUIPMENT FOR ANALYSIS AND MONITORING OF
WATER AND DRAINAGE SYSTEMS
1 Sewerin AQUAPHON model geophone
1 Sewerin manhole cover detector
4 Casella Rain Gauges
1 MONTEC DETECT 3013 portable level-speedometer to gauge water
speed
1 ISCO sampler
1 SIGMA sampler
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION16
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Pacific Future Energy (Canada)
Year: 2014
Project : British Columbia Greenfield Refinery, Canada (Feasibility Study)
Description: Pacific Future Energy Co. is committed to build and operate the world’sgreenest refinery on British Columbia’s north coast.
PFEC believes it is in Canada’s national strategic interest to gain access to internationalmarkets for Alberta’s oil, especially the fast growing Asian market.
The company believes it should not be done at the sacrifice of BC’s coast or broaderenvironment and must be done in full partnership with First Nations.
The $10 Billion refinery will be built in modules (each phase having a process capacityof 200,000 BPSD).
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION17
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Milazzo Refinery (RaM)
Year: 2014-2015
Project : New Naphtha Hydrotreating Unit, Italy (Basic Design)
Description:
The scope of the Basic Design Package is a new naphtha hydrotreating unit namedHDT-3.
HDT-3 will produce 450,000 tons per year of hydrotreated Naphtha containing lessthan 0.5 ppmw of sulphur and 24,000 tons per year of olefin saturated LPG with targetspecification Pro Isomerization.
The plant will include a refurbished hydrotreating reactor and new pumps, heatexchangers in the preheating trains, fired heater, three-phase separators, reboiledstripper distillation tower, associated utilities, LPG and off-gas amine gas treatingpackages, recycle / make-up gas compressor package and control systems.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION18
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Milazzo Refinery (RaM)
Year: 2014-in progress
Contract Value (LSTK): 15M€
Project : Revamping of Kerosene Desulphurization Unit, Italy (EPC)
Description :
Project scope is a major revamping of the existing Kerosene HydrodesulphurizationUnit (HDS-1) to expand the capacity from 2,400 to 4,000 t/d.
Improvement of product quality to target specification Pro Clear and Bright andmaximum S content of 10 ppm are also foreseen.
New feed pumps, stripper, kero dryer and heat exchange train are being installed.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION19
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Eni R&M Division (Italy)
Year: 2011-2013
Contract Value (LSTK): 14M€
Project : Vacuum Column & Filtration System for FCC Slurry Oil (EPC)
Description :
Project scope is the installation of a new Vacuum Column & Automatic FiltrationSystem on the Slurry Oil stream produced by the existing FCC Plant of the Refinery.
The purpose of the new Unit is:1) to recover additional LVGO as feed for the Hydrocracking Unit2) to increase Slurry Oil flash point3) to remove the catalyst fines in order to feed the Clarified Oil (CLO) stream to the
existing Gasification Plant or to recycle it to the FCC riser .
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION20
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Danieli Far East
Year: 2011-2012
Project : Carbon Dioxide Removal Unit (FEED + Detail Design + ProcurementServices)
Description:
Project scope was the Detail Design, the Equipment & Bulk Material Procurement andthe Home Office Project Management Services for the 10,000 Nm3/h Carbon DioxideRemoval Unit at an iron ore reduction plant.
The Unit, based on Giammarco-Vetrocoke hot carbonate process, was extensivelymodularized in order to facilitate the construction utilizing local labour.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION21
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Eni E&P Division
Year: 2010-2011
Project: Fauzia, Elettra & Benedetta Platforms, Adriatic Sea (FEED)
Description :
The project was carried out providing our Client with the EPC Tender Documents forn.3 new gas platforms located offshore Adriatic Sea and the relevant ± 15% CostEstimate.
SIMECO developed the Front End Engineering Design according to the following mainspecifications:
• FAUZIA PLATFORM: 12” export sealine; n° 2 wellheads double completion; 3-legsjacket.
• ELETTRA PLATFORM: 8” export sealine; n° 1 wellhead double completion; 3-legsjacket.
• BENEDETTA PLATFORM: 8” export sealine; n° 1 wellhead single completion;monopode.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION22
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Saipem SES
Year: 2008-2010
Project : OLT Livorno FSRU, Italy (Detail Design)
Description:
The world’s first offshore Floating Storage and Regassification Unit (FSRU) wasconstructed by converting the LNG Carrier Golar Frost.
The FSRU is permanently moored offshore Livorno, Italy, about 12 miles from the coastin a water depth of about 120 meters and connected to shore through a gas exportpipeline.
Storage capacity is 137,000 cubic meters of LNG in four spheres.
Production capacity is 3,75 billion standard cubic meters year (bscmpa).
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION23
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Saipem (Iraq)
Year: 2010-2011
Project : Zubair Degassing Station, Iraq (FEED)
Description :
Project scope was the development of the Front End Engineering Design for a new OilDegassing Station (DGS) and rehabilitation of an existing one at Zubair field, Iraq.
The Zubair field - being developed by Eni with Occidental Oil Co., Korean Gas andMissan Oil Company - with an estimated production capacity of 1,200,000 BOPD is oneof the few super giant oil field presently developed worldwide.
Zubair is a “brown field” project involving the realization of new plants as well as therevamping of existing unit.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION24
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: ENI R&M Div.
Year: 2010-2011
Contract Value (LSTK) : 1.1 M€
Project : Electrically Traced Transfer Line for Liquid Sulfur at Eni’s TarantoRefinery, Italy (EPC)
Description:
Project scope was the installation of a new 4’’ x 1 km Liquid Sulfur transfer line fromthe Sulfur storage tanks to the flaker unit producing solid sulfur flakes.
The un-flanged transfer line is electrically heated by a skin effect tracing systemcapable to re-melt the sulfur in case of in line solidification.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION25
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Saipem
Year: 2009-2012
Project : EST Project at Eni’s Sannazzaro Refinery, Italy (Detail Design)
Description: EST (Eni Slurry Technology) is a new deep hydrocracking technologydeveloped by Eni for the valorization of heavy and extra heavy oils, tar sands andrefinery residues.
Sannazzaro Plant, with a capacity of 20,000 BPSD, will be the first industrial applicationof the EST technology, which has been extensively tested in a CommercialDemonstration Unit in Italy.
EST plant features n.2 x 2,000 t hydro-cracking reactors made of CrMoV + SS 347 WeldOverlay, supplied by GE-Nuovo Pignone, the largest built ever.
SIMECO has been in charge for the Technical Bid Evaluation and the follow-up of thehydro-cracking reactors, hydro-treating reactors (400 t) and large HP Gas/LiquidSeparators (300 t) made of CrMoV (supplied by ATB).
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION26
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Eni SpA
Year: 2008-2009
Contract Value (LSTK): 8.5 M€
Project : C4 Dryers Package at Eni’s Sannazzaro Refinery, Italy (EPC)
Description:
The new C4 Dryer Package was designed to remove impurities (water, acetone,acetonitryle) from a C4 Olefinic Stream , feeding the existing Isomerization Unit.
The purification is obtained throughout adsorbents continuously regenerated. Theregeneration unit includes a hydrogenation reactor to remove to reduce olefins contentfrom the adsorbent regeneration stream.
The Unit is entirely installed on a steel structure “straddling” an existing pipe-way in avery congested area of the Refinery.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION27
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Saipem Energy Services
Year: 2009
Project : GOSP at Burun Oil Field, Turkmenistan (BDP review and assessment)
Description:
The Gas Oil Separation Plant (GOSP) at Burun Oil Field had some trouble operations,i.e. sand carry over, clogging of filters by paraffines contained in the crude oil and HSEissues.
The Scope of Work was to carry out, on a very tight schedule, a review of the existingBDP developed by the previous Owner of the Oil Field in order to solve the operatingproblems.
Each document of the BDP was reviewed and several inconsistencies were identified.For each document a Comment Sheet was produced.
Eventually, recommendations have been provided to Company regarding thepossibility to use the BDP as a basis for an EPC bid to de-bottleneck the Plant.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION28
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Bonatti
Year: 2008-2009
Project : Underground Gas Storage, Italy (Detail Design)
Description: Bordolano is a depleted gas field, 50 km from Milan (Italy), owned bySNAM Rete Gas/STOGIT (Stoccaggi Gas Italia).
STOGIT intended to convert the existing reservoir into an Underground Gas Storage.
The Plant consisted of a temporary gas compression and Injection station, called EarlyInjection Station, withdrawing natural gas from the national pipeline network ownedby Snam Rete Gas. Natural Gas was collected and delivered to the reservoir through 2new pipelines.
The Early Injection Station was dismantled once completed the injection phase of thecushion gas in the reservoir.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION29
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Saipem
Year: 2008-2009
Project : QAFCO V Ammonia Plant, Qatar (Detail Design)
Description:
The Project include N. 2 complete Ammonia Plants (Licensor Haldor Topsoe A/S -design capacity 2 x 2,200 t/d) based on Steam Reforming of Natural Gas consisting ofthe following process systems:Natural gas desulphurization; Process Air Compression; Steam Reforming of NaturalGas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA;Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration;Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator& BFW pumps.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION30
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Snamprogetti
Year: 2007-2008
Project : ENVEN 1.3 Project - Ammonia / Urea Plant, Pakistan (Detail Design)
Description : N.1 complete Ammonia Plant (Licensor Haldor Topsoe A/S; 2184 MTPD)based on Steam Reforming of Natural Gas consisting of the following process systems:Natural gas desulphurization; Process Air Compression; Steam Reforming of NaturalGas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA;Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration;Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator& BFW pumps. Urea Plant (Licensor Snamprogetti; 3835 MTPD) Process units havebeen connected to existing Facilities as: Instrument Air, Plant Air, Steam Generation,Power Generation, Raw Water, Potable Water, Natural Gas Treatment.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION31
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Tecnimont
Year: 2006-2007
Project: NKNK LLDPE/HDPE Plant, Russia (Detail Design)
Description: NKNK (Nizhnekamsk Neftekhim) LLDPE/HDPE is a Polyethylene Plantbased on the Spherilene Process Technology from Basell Italia.
The plant annual capacity is 230,000 MTPY of polyethylene in pallets, HDPE, MDPEand LLDPR type.
The units included in the engineering activities were: Polymerization Area, ExtrusionArea, Alkyl Area, Homogenization, Bagging, Palletizing and Warehouse,Interconnecting & Pipe Racks, Effluent Basin, Purification, Propane Storage, ControlRoom and Substation, Valve House, Flare Area, Underground.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION32
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: ENI Oil Co. Ltd, Libyan Branch
Year: 2005-2006
Project : Water Injection Plant & Power Generation System, El Feel Field, Libya(FEED)
Description : The Water Injection Plant (275,000 BWPD) consists of:Water Supply System, including Oil / Water separation by induced gas flotation,Filtration and Chemicals Injection Systems.
Injection Water System, consisting of: Buffer Tank, Injection Water Booster Pumps,Injection Water Pumps.
Gathering System, consisting of n. 5 Trunk-lines up to 24’’ x 38 km
The Power Generation Systems (50 MWe) consisting of: n. 3+1 Heavy Duty GasTurbines GE FR5-1 Dual Fuel fed with Crude Oil (chemically treated for V inhibition)or Natural Gas.
New dedicated Control Room & Electrical Sub-Station.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION33
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Milazzo Refinery (RaM)
Year: 2005 – 2008
Contract Value (LSTK): Phase 1 – 2.7 M€, Phase 2 – 2.9 M€
Project : Revamping of Marine Loading Arms, Italy
Description :
The Project consisted of two Phases:
During Phase 1, 4 x 16” existing Crude Oil Loading Arms at Pier 2/Mooring 5 weredismantled and replaced with 3 x 16’’ Loading Arms. During Phase 2, the sameoperation, as per Phase 1, were carried out on Pier 2 / Mooring 6.
FMC Technologies were in charge for the supply of the Loading Arms. SIMECOprovided Engineering Services, Procurement of piping materials and Supervisionduring Erection, Commissioning and Start-up.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION34
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Snamprogetti
Year: 2005
Project : ISOCRACKER at Sannazzaro de Burgondi Refinery, Italy (Detail Design)
Description:
Sannazzaro’s ISOCRACKER is a 25,000 BPSD Hydrocracking Plant based on ChevronLummus Global technology.
Scope of the Engineering Services executed by SIMECO and Partners included theMain Process Units along with the following Auxiliary Units:• Sour Water Stripper Unit• Amine Regeneration Unit• Interconnecting• Off-sites• Cooling Water Unit.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION35
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Snamprogetti Sud
Year: 2003-2004
Project : FCC GASOLINE HDS Unit at Eni’s Sannazzaro Refinery, Italy (DetailDesign)
Description:
Sannazzaro’s FCC Gasoline Hydrodesulphurization Unit is a 20,000 BPSD plant basedon CDHYDRO catalytic distillation technology by CDTECH.
Auxiliary Units were also included in the SOW.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION36
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: Snamprogetti Sud
Year: 2003
Project: Topping 2 Revamping Project at Eni’s Sannazzaro Refinery, Italy (DetailDesign)
Description:
Topping 2 was originally designed to process 715 t/h of Arabian Light Crude Oil.A major de-bottlenecking to process up to 770 t/h of Djeno Melange Crude Oil wasrequired.
The revamping consisted of:
• Addition of a new Pre-flash Column upstream of the existing Topping Columnalong with relevant Heaters and Pumps;
• Design of new steel structures Complete review/check of the existing Utilities andOff-sites systems, i.e. BD, Utilities, Closed Drain.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION37
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: PRAOIL Oleodotti Italiani
Year: 2003-2004
Project : Genoa De-bottlenecking Project, Italy (Detail Design)
Description:
Underground interconnecting to upgrade and rationalize the 100 years old oil productsoffloading marine terminal in Genoa.
“Trench-less” and “micro-tunnel” technologies have been deployed due to the verypopulated and geologically critical areas.
4 x 30” + 2 x 12” pipelines have been laid down in a 2.6 m x 650 m micro tunnelbetween Genoa Marine Oil Terminal and Praoil Petroleum Products Depot & PumpingBooster Station.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION38
Simeco S.p.A.
REFERENCE – OIL & GAS SECTOR
Client: VISCOLUBE
Year: 2001-2003
Project : Spent Lube Oil Re-refining Plant and Offsites Revamping , Italy (FEED +Detail Design + Procurement Services)
Description:
VISCOLUBE is the European leader in re-refining of spent lube oils, with over 60,000MTPY of reclaimed oils.
The Spent Lube Oil Hydrotreating Unit is based on Axens technology.
The Plant includes a Hydrogen Generation Unit designed by CALORIC Anlagenbau(Germany). CALORIC is a firm specialized in supply of gas generation plant package,i.e.: syngas, carbon monoxide, hydrogen.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION39
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Eni, Venice Refinery
Year: 2014
Project: Revamping of S. Leonardo Oil Terminal – Feasibility Study
Description:
Venice Refinery scope was to convert San Leonardo Crude Oil receiving terminal to finished product terminal for ship with DWT variable between 10.000 to 80.000 Tons.The Feasibility Study included: • the verification about the possibility to re-use the existing loading arms; • the study of the modification of the existing lines in order to optimize discharge rates
and operability;• the verification of the mooring systems, including:
• Jetty height above the average sea-level • Jetty structural integrity• Status of the existing mooring equipment • Analysis of ship positioning • Identification and sizing of new mooring points.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION40
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Eni, Livorno Refinery
Year: 2013
Project: Revamping of the existing LPG Terminal
Description:
The Scope of Work included the revamping of the existing LPG terminal in order to unload LPG carrier up to 30,000 DWT with a discharge rate of 500 ton/h.
The Scope of Work included the verification of the mooring systems, including:• Jetty height above average sea-level • Status of the existing mooring equipment • Mooring study, i.e. analysis of ship positioning, identification and sizing of new
mooring points.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION41
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Genoa Port Authority
Year: 2011
Project: Study of petroleum products transfer operations under steady state andtransient conditions
Description:
The main purpose of the study was to carry out the Conceptual Design of a system toprotect the lines and the loading arms from overpressures during operations
The activities carried included:
• Steady state analysis of loading/unloading operations to determine themaximum allowe transfer rates.
• Transient state analsysis of the pressure peak over the lines and the loading incase of emergency shut down (i.e. water hammer effect due to block valve closure)
• Conceptual Design of the High Integrity Pressure Protection System (HIPPS).
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION42
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Snamprogetti
Year: 2006 – 2007
Project: Trans Anatolian Pipeline, Turkey (Conceptual Design + FEED).
Description : The Project included the following facilities: A new unloading terminallocated east of Samsun, on the Black Sea, suitable for handling a wide range of tankers,including VLCCs, through three (3) Single Point Moorings and relevant unloadingfacilities; A new tank farm located east of Samsun, on the Black Sea, featuring 12floating roof storage tanks (total net capacity of 1,500,000 m3), including all relevantfacilities and a new dedicated power plant; A 48”and 42” (for the last section), 550 kmlong carbon steel pipeline provided with a Pressure Reducing Station (PRS), mainlineisolation block valves and pigging trap systems; One head pump station (PS1) locatedat the unloading terminal on the Black Sea and three additional pump stations (PS2,PS3, PS4) located along the route of the TAP pipeline at different elevations, providedwith power generation and all required facilities such as control rooms,accommodation, security and maintenance buildings; A new tank farm located atCeyhan, featuring 12 floating roof storage tanks (total net capacity of 1,800,000 m3),including all relevant facilities; A new jetty marine loading terminal, on theMediterranean Sea, located in front of the new Ceyhan tank farm, suitable for a widerange of tankers, including VLCCs..
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION43
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Eni, Gaeta Oil Terminal
Year: 2003
Project: Feasibility Study of a New Multibuoy Mooring Terminal for carriers up to40,000 DWT
Description:
The scope of the study was to investigate different alternatives for the expansion of the existing Oil Terminal.
In particular, the Feasibility Study addressed:• The new subsea Pipeline End Manifold (PLEM)• n. 3 sealines for trasnfer of oil products• The study of n. 5 Buoys + swamp mooring.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION44
Simeco S.p.A.
REFERENCE – MARINE OIL TERMINALS
Client: Compagnia Italpetroli Spa
Year: 1997
Project: Civitavecchia New Oil Terminal – Basic Design
Description:
The project included:• n.1 single buoy mooring system (water depth 50 m)• n.2 24’’ x 2.2 km sealines + n.2 24’’ x 1.15 km on-shore lines for transfer of fuel oil; • n.2 22’’ x 2.2 km sealines + n.2 22’’ x 4.7 km on-shore lines for transfer of light
petroleum products (i.e. gasoline, kerosene, diesel).
SIMECO carried out the basic design for the single buoy mooring system and the pipelines.
The type of foundations have been designed based on site geological data, while metocean data (wind, waves, streams,….) have been used as a basis for the mooring study in order to select the most suitable mooring equipment.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION45
Simeco S.p.A.
REFERENCE – ENERGY SECTOR
Client: Enipower
Year: 2010
Project : Combined Heat & Power Plant Revamping , Italy (FEED)
Description:
Project scope was the Front End Engineering Design for the revamping of EnipowerCombined Heat & Power Plant located in Bolgiano, San Donato Milanese, Italy.
The revamping consisted in dismantling the existing power generation units and theirreplacement with a new gas turbine (aero derivative type), installation of n.2endothermic engines with waste heat boilers for power generation and production ofhot water, n.3 auxiliary boilers, n.10 buffer tanks for hot water distribution to theexisting district heating network, n.1 new pumping station, new electrical room, newtechnical room.
SIMECO Scope of Work included also +/- 15% cost estimate and preparation of theEPC Tender Documents.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION46
Simeco S.p.A.
REFERENCE – ENERGY SECTOR
Client: Maire Engineering
Year: 2007
Project : Bocamina II - Power Plant, Chile (Basic + Detail Design)
Description: Bocamina II is a 370 MWe Coal Power Plant owned by Endesa located inPuerto Coronel, 30 Km SE of Concepcion, Chile.
The Plant features a SES Boiler and a GE Steam Turbine model D5.
SIMECO and JV partners Scope of Work covered Basic Engineering and DetailedMechanical Design for Piping Engineering, including 3D modeling, of the followingsystems:Steam Generation, Auxiliary Steam System, Machinery Cooling, De-mineralized Water,Instrument Air, Fire Fighting Water, Waste Water, Condensate Recovery, VacuumCondenser, Boiler Feed Water, Fuel Oil, Sampling, Chemical Injection.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION47
Simeco S.p.A.
REFERENCE – ENVIRONMENTAL SECTOR
Client: Eni R&M Division
Year: 2011-2012
Project: Waste Water Treatment System for Water Re-use at Eni’s SannazzaroRefinery, Italy (Detail Design)
Description:
Project scope is the installation of a new Waste Water Treatment Package to process 740m3/h of water discharged from the existing Refinery Water Treatment System, toobtain permeated desalted water (conductivity < 100 µS/cm, hardness < 5 mg/l asCaCO3 ) suitable for steam generation.
The purpose of the new Unit is to recycle water previously discharged to theenvironment in order to feed the existing demineralized water production system forthe requirements of the new Process Plants .
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION48
Simeco S.p.A.
REFERENCE – ENVIRONMENTAL SECTOR
Client: Polimeri Europa
Year: 2006 – 2007
Contract Value (LSTK): 6 M€
Project: TAS (Waste Water Treatment) Covering System at Sarroch PetrochemicalComplex, Italy (EPC)
Description:
The New Unit recovers as condensate the vapors produced at existing jetty on oiltankers during loading operations and as well the vapors produced in the APISeparator basins.
A GRP fixed roofing system, pressurized with nitrogen, is provided on the APISeparator basins to recover and neutralize hazardous vapors.
The New Cryogenic Condensation Unit was designed to reduce emissions of VOC(Volatile Organic Compounds) to the atmosphere, in compliance with the most recentEU environmental standards.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION49
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Ministry of Local Government and Housing , ZAMBIA
Year: May 2014 - ongoing
Contract Value: 1mln USD
Project : Consulting Services For The Design And Supervision Of The ExpansionAnd Rehabilitation Of Water And Sewerage Infrastructure – Choma
Description : The Ministry of Local Government and Housing intended to providefunds to Southern Water and Sewerage Company Limited, the Water Utility mandatedto provide water and sewerage services in Southern Province, to ensure that the watersupply and sanitation situation in the town of Choma is improved in order to supportthe activities of the Provincial Capital. The activities proposed to be undertaken in theimprovement of water supply and sewerage systems have, wherever possible, beenlinked to measurement indicators which will assist to evaluate progress towardsimprovement of service quality and efficiency in Choma Town.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION50
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Ministry of Energy and Public Utilities, MAURITIUS and the outer island ofRodrigues
Year: 2010 – 2012
Contract Value: 813. 282, 07 USD
Project : Hiring of Consultancy Service for Mauritius Wastewater Master Plan Study
Description : The Study for the Sewerage Master Plan of Mauritius is focused on theattainment of three objectives: The first objective is the formulation of a phasedprogramme covering a period of 20 years (2014-2033) for implementing wastewatersystem improvements to meet future demands in main islands of Mauritius and theouter island of Rodrigues. The second objective is the delivery of wastewater sectormaster plan report that will detail the investments needed for the twenty years periodand will recommend the actions to optimize the management of assets as well asachieve financial efficiency and environmental compliance. The third objective is theformulation of a feasibility study for urgent projects to be implemented in the first tenyears of the Plan
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION51
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: République du Niger, RIVER NIGER
Year: 2010 – 2011
Contract Value: 182.000 EU
Project : Preparation of a master plan for water supply targeting villages on the RiverNiger
Description : The aim of the project is the preparation of master plan for water supplyin the River Niger territory, that will be part of the studies and researches necessary forthe Ministry of Hydraulic and for the other Stakeholders charged of planning the AEPprogramme in the river valley. Specifically the project includes specific objectives:• The definition of the program context and preliminary analysis of the area;• The preparation of a general plan for the water supply, starting with surface water.• The involvement of all the relevant actors concerned aiming at obtaining the
general approval on the plan
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION52
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Sierra Leone Water Company Ministry of Energy and Power Ministry ofEnergy and Power
Year: 2006 – 2009
Contract Value: 681, 187.51 USD
Project : Water Supply & Sanitation Project ( in the towns of Makemi, Bo andKenema) Rural Water Supply and Sanitation
Description : To develop a full proposal of the rural water supply sanitation initiative(RWSSI) of Sierra Leone that will facilitate both the mobilization of financial supportand detailed implementation requirements:• To prepare an economically and technically sound project for the water supplies of
Makeni, Bo and Kenema towns.• To assess the rural water supply and sanitation of the country and prepare a rural
water supply sanitation Program.• To Prepare an action plan to meet the needs of year 2015 that will be include the
identification and designing of a priority scheme on a pilot basis.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION53
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Water Management Authority –Mauritius, MAURITIUS
Year: 2003 – 2007
Contract Value: 976,378.32 USD
Project : Rehabilitation of Infrastructures on CHA Estates – Extension of Phase III
Description : Rehabilitation of sewerage infrastructure on Housing Estates inMauritius. Involves the construction of reticulation Networks to cater for 2, 777 housesconnections to the main sewer; two sewage pumping stations and construction ofoutfall Sewer 3,67 km long as well as rising main 1315 km long
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION54
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Water Management Authority –Mauritius, MAURITIUS
Year: 2002 – 2003
Contract Value: 153,178 USD
Project : Rehabilitation and Improvement of Infrastructure on CHA Estates –Extension of Phase II
Description : Over the period 1960 -1988 a total of 158 housing estates were built acrossthe Country to provide shelter. For families made homeless as a result of cyclones.However the housing estates lacked adequate facilities such as roads, water supply,sewerage, surface water drainage and waste collection. During the years 1990 to 1998the Phase I the Rehabilitation of Infrastructure Program was launched for the provisionof sewerage facilities to some estates Phase II of this Programme has been extendedthrough a Project for the rehabilitation of a satisfactory collection and disposal ofsewage in seven housing estates serving a population of 24 000 in habitants.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION55
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Ministry of Water Dar es Salaam ,TANZANIA
Year: 1998 – 2002
Contract Value: 1.282. 907 USD
Project : Consultancy Services for the Institutional Strengthening for Urban Waterand Sewerage Improvements in Tanzania
Description : The project purpose is the strengthening of the capacity of the UrbanWater and Sewerage Authorities (UWSAs) in Mwanza, Iringa, Mbeya, and Mtwara, interms of management, personnel and equipment. The consulting services aim atenhancing the Ministry Officers’ expertise and know how in order to ensure the localgovernment an autonomous management of the waste water system. The consultantsservices are also intended to:• Safeguard water resources;• Identity adequate financial resources;• Promote an industrial policy for the improvement of the existing control of water
resources and utilities
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION56
Sari Consulting Ltd.
REFERENCE – WATER SECTOR
Client: Ministry of Natural Resources and Energy Water Department, GUINEABISSAU
Year: January - November 2001
Contract Value: 301,073 USD
Project : Technical Assistance for the Institutional strengthening of the WaterSupply and Sewerage
Description : The project overall objective in enhancing the national watermanagement system by providing consulting services to the Ministry of NaturalResources and Energy in Guinea Bissau. The Coverage of the water treatment anddistribution network is inadequate due to the inability to operate and maintain thepublic facilities effectively. Therefore the projects aims at strengthening theautonomous management of those facilities at regional and local levels.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION57
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: ANE , Mozambique
Year: February 2015 - 2019
Contract Value: USD 3.757.000 + MZN 9.430.000
Project : The multinational Nacala Road Corridor Project – Phase I:ConsultingServices for Design Review and Update and Supervision of Civil Works for Lot D:Cuamba-Muita (138 km) and Technical Assistance to ANE
Description : The Government of Mozambique intends to upgrade the strategic NacalaCorridor to provide a more economical, reliable, and seamless flow of goods andservices between the countries of the region and at the same time to stimulate theregional economy in the northern part of Mozambique, where the lack of all weatherroads is a major constraint on development. Currently, the Nampulato Cuamba (348km) stretchis under implementation on in three subsections.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION58
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Road Development Agency (RDA), ZAMBIA
Year: June 2015 - Ongoing
Contract Value: USD 1.000.000
Project : Consulting Services for the detailed engineering designs and supervision ofthe construction of urban roads using segmented/concrete paving block andcobblestone technology in Northern and Luapula Provinces (250 km)
Description : The principal, overall objective of the services is to perform the necessarysurveys, detailed engineering designs, preparation of Bill of Quantities to be usedduring implementation by Contractors with a view of improving road infrastructureand general aesthetics in urban areas through the use of segmented paving blocks andcobblestones.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION59
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Road Development Agency (RDA), ZAMBIA
Year: April 2015 - Ongoing
Contract Value: USD 1.000.000
Project : Consulting Services for the detailed engineering designs and supervision ofthe construction of urban roads using segmented/concrete paving block andcobblestone technology in Central and Muchinga Provinces -350 km
Description : The urban roads in deplorable condition in Central and MuchingaProvinces are part of the Pave Zambia 2000 project which is an initiative of theGovernment of the Republic of Zambia aimed at constructing urban roads usingsegmented Paving Blocks through labor intensive methods. The services shall includefeasibility study, skill-development, materials, equipment and labor forceidentification, SME and local construction sector development, contract managementand sustainability and commercialization to support Pro-poor development throughJob creation.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION60
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of infrastructure Development, TANZANIA
Year: November 2011 – ongoing
Contract Value: USD 1.670.000
Project : Consulting services for design review and pre-contract services andconstruction supervision of the upgrading of Namtumbo – Tunduru road (193 km) tobitumen standard lot A: Namtumbo – Kalimesera section (60.7 km)
Description : The Namtumbo – Tunduru road is situated in Ruvuma Region, Southernpart of Tanzania bordering Malawi to the West and Mozambique to the South. The 193km road starts from Namtumbo and runs through woodland, bush land thicket andgrasslands and crosses Selous-Niassa wildlife corridor over a 40 km stretch and ends inthe center of the Tunduru District. The final objective of the assignment is to undertakeconsultancy services on behalf of TANROADS for the design review, pre-contractservices and supervision of construction works.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION61
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Uganda National Roads Authority (UNRA), UGANDA
Year: 2011 – 2015
Contract Value: USD 2.233.000
Project : Consulting services for design review and construction supervision ofHOIMA-KAISOTONYA (92 KM)
Description : The Hoima-Kaiso-Tonya Road (92 Km) is currently a gravel road locatedin Hoima District on Western Uganda and is about 225 Km west of Kampala. The scopeof the Consultancy Services are two:• Carry out the review and update of the existing engineering design and make all
amendments and additional studies for the soundness and sufficiency of thedetailed engineering design and bid documents
• Provide Construction Supervision during the pre-construction and theconstruction periods and during the Defects Liability Period
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION62
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: TANROADS, TANZANIA
Year: 2011 – 2006
Contract Value: USD 1.593.000
Project : Supervision of Works for the upgrading of the road Isaka – Nzega
Description : The Nzega-Isaka road is part of the Dar Es Salaam-Mwanza road whichtransverses the towns of Morogoro, Dodoma, Manyoni, Singida, Nzega and Mwanza(towards the north). After starting off at Nzega, the road cuts across rich agriculturalareas and terminates at Isaka connecting towns, district headquarters and economicgrowth center. The rehabilitation of his section is part of a wider project providing forthe upgrading of the entire section Mwanza Border-Nzega from gravel roads to a ClassI trunk road in bitumen pavement standard. The road influence area is about 20,000km2.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION63
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of WorksMDI Road Kanifing , THE GAMBIA
Year: 2007 - 2009
Contract Value: USD 1.366.000
Project : Supervision of rehabilitation and upgrading works of trunks roads in TheGambia and Senegal (Lot1)Road length: 19.9 Km.
Description : Lot1 : Barra to Amdellai section (19.9 km) of the Trans West AfricanHighway connecting Banjul the capital of Gambia with Senegal. Lot2: Soma to Basseand Velingara the major section of the South bank truck linking the capital Banjul andthe provincial towns(215.5 km)
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION64
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of Finance, BENIN
Year: 2004 - 2008
Contract Value: USD 1.038.000
Project : Technical Assistance to the control and supervision works for thesettlement of bituminous roads NATITINGOU- PORGA
Description : The Natitingou – Porga road (102 km) represents one of the mostimportant parts of the Inter-state National Road n 3 which connects Benin and BurkinaFaso. The road is a two lane highway with 3 bridges (average length 25 meters). Theproject focuses on supervising the works concerning bituminous settlement in theNATITINGOUPORGA road
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION65
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: NAO (National Authorizing Office), SIERRA LEONE
Year: 2003 – 2006
Contract Value: USD 1.160.000
Project : Consultancy Services for the Management and Supervision of WorksContract for the Construction of the Freetown-Conakry Highway Phase I
Description : Reconstruction of the Rogbere-Pamelap Road in the Republic of SierraLeone of approximately 77 km length based on the approved design and contactdocuments; Reconstruction of the Pamelap-Farmoreah Road in the Republic of GuineaConakry of approximately 9 km length, based on the approved design and contractdocuments.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION66
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of Transport and Public Works, MADAGASCAR
Year: 2003 - 2006
Contract Value: USD 3.594.000
Project : Detailed Design, procurement and supervision of the rehabilitation work ofthe National Roads N. 44 and N 3. Study for the Periodic Maintenance of Road RN 2.
Description : The project includes the rehabilitation and maintenance national primaryand secondary road network corridors which connects the capital of Madagascar to thevery important economic regions of the country such as Lac Alaotra through thenational road RN 44 in bituminous concrete pavement and to the port of Toamasinathrough the national Road n.2 .
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION67
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of Transport and Public Works, MADAGASCAR
Year: 2003 - 2005
Contract Value: USD 1.690.000
Project : Planning , Control and Supervision of Construction works of the RN5Abetween Sambava and Antalaha and of Antalaha harbour’s resettlement works.
Description : The main objective of the project is to rebuild the Nat ional Road RN5A,between the cities of Sambava and Antalaha, in the north-east of the island. This road is180 km long, included 1.5 km of urban road inside the city of Antalaha, road inbituminous concrete pavement. The construction and rehabilitation works on this roadaim at the economic development of the region the main tasks concern the constructionand reconstruction of different bridges and the building of riprap foundation of theharbor infrastructures.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION68
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of Transport and Public Works, MADAGASCAR
Year: 2002 – 2004
Contract Value: USD 1.339.000
Project : Supervision for the works of Reinforcement of Structural Network of LotProjects from 4 to 7
Description : The project concerns the backing of several sections and thereconstruction of the access to the Toamasina harbor. The roads leads in concretepavement from Brickaville to Toamasina (total Length 115 Km).
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION69
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Ministry of Road and Transport, GHANA
Year: 2001 – 2004
Contract Value: USD 1.280.000
Project : Technical Assistance Towards the Efficient, Effective and SustainableManagement of Maintenance in the Road Sub-Sector Project No.8 ACP GH 009
Description : The project entails the review of all existing systems and implementsactions required to put the road maintenance management in the Ministry of Roadsand Transport’s road agencies Ghana Highway Authority (GHA), Department ofFeeder Roads ( DFR) and Department of Urban Roads (DUR) on an efficient, effectiveand sustainable basis.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION70
Sari Consulting Ltd.
REFERENCE – ROAD SECTOR
Client: Cabinet of Vice prime minister in charge of Economic and SocialReconstruction, GUINEA BISSAU
Year: 2000 – 2003
Contract Value: USD 301.000
Project : Short term technical assistance to the general direction of transportinfrastructures
Description : The project aims at assisting the Ministry of Social Reconstruction(General Directorate of Transport Infrastructures – DGIT) in developing new policiesfor the setting-up of a privatized management of the road sector in cement concretepavement. A permanent technical assistance is provided to the management ofdifferent types of development projects with a major focus on those financed under theEDF.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION71
Sari Consulting Ltd.
REFERENCE – BUILDING SECTOR
Client: Republic of Uganda through the Ministry of Public Service
Year: July 2012 - Ongoing
Contract Value: USD 500.000
Project : Consulting Services to Prepare Designs, Tender Documents and Supervisethe Refurbishment of the Proposed Civil Service College Uganda (CSCU).
Description : The consultancy services entails feasibility study, preparation oftopographical survey, socio/environmental study and geotechnical study includingpreliminary and outline designs and cost estimates; preparation of detailedarchitectural & engineering designs including tender documents and tender action andconstruction supervision including the defects liability period.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION72
Sari Consulting Ltd (SARI) operating offices are at:
via Giacomo Peroni 452, Rome, Italy
SARI Consulting (Zambia) Limited, Company Registration N. 111853. Plot N. 53, Central Street, Jesmondine, Lusaka, Zambia
SARI Consulting (Mozambique) Ltd, Av. Kwame Nkrumah, 1335, Maputo , Mozambique
SARI Consulting (Uganda) Ltd , Plot 26 Flat B, Golf Course Road, OffWampewo Avenue, Kololo, P.O.Box 6960, Kampala, Uganda
SARI Consulting (Zimbabwe) Ltd, 40 Arcturus Road Highlands, Harare, Zimbabwe
SARI Consulting (Kenia) Ltd, Upper Hill on Kiambere Road, Casia B2 next to former World Bank offices
SARI Consulting (South Africa) Ltd, 20 Weenen Road, Milnerton, Cape Town 7441
Sari Consulting Ltd
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION73
SIMECO operating offices are at:
Via Arcivescovo Romilli 22, 20139 Milano, Italy
Petrodar Tower, Office Suite 32, Al Seef District, Kingdom of Bahrain
Simeco Systems d.o.o., Gradacacka 29B, 71000 Sarajevo, Bosnia and Herzegovina
Simeco S.p.A.
SARI CONSULTING LTD and SIMECO SPA
JOINT VENTURE PRESENTATION74
SARI Consulting Ltd.
Mr. Goffredo DE PASCALE
CEO
via Giacomo Peroni 452
Rome
ITALY
Phone : + 39 06 45563173
Fax : + 39 06 45563109
e-mail:
sari@sariltd. com
Website: www.simeco-sari.com
CONTACT
THANK YOU FOR YOUR
KIND ATTENTION
We look forward to seeing you again.
Sari Consulting Ltd and Simeco Spa