    PROJECT REPORT ON MFG. OF SILVER PRODUCTS

    1. INTRODUCTION :-

    a) Availability of Raw Materials :-a) Raw materials will be available in Kolkata (Barabazar). It is not scarce.

    b) Marketability :-a) Mograhat and a part of Baruipur area in South 24 Pgs. District is famous foras a cluster zone area for manufacturing of silver made products likeornaments, filigree works, utensils and decorative items including articles ofsilver for ritual works. There is a good mkt. allover India for these products.Marketing will be channelized through the dealers in allover Indian cities. The

    silver products will be supplied to the wholesale market in Kolkata andBenaras of Uttar Pradesh.

    c) Manufacturing Process :-a) Silver ingot will be converted into alloy of Silver & Cadmium in a 70:30 ratioby an ancillary unit on job works basis. Inside factory premises metal stripswill be drawn through our self fabricated spinning machine and with the helpof utensils will be fabricated by our skilled artisans. Ornaments and filigree willbe produced by using hand tools.

    Number of Working Days / Months : 25 Days

    Number of Shift / Day : 01 Shift

    Number of Working Hrs. / Shift : 10 Hours

    Item Annual Installed Capacity Annual target of Production[ i.e. activity level ]

    Silver Products 750 Kg 600 Kg

    Total Electric Power Requirement : 5 KW

  • 7/31/2019 Silver Products MFG

    2/3

    Plant & Machinery

    Sl. Description No. Unit Cost Amount

    1

    5 Double gear Sheet drawing machine, fly-wheel-30 dia., stand and complete with allaccessories, Power Driven with 5 HP electricmotor

    1 40,000.00 40,000.00

    25 Single gear wire drawing machine, withstand, hand driven

    1 10,000.00 10,000.00

    3Polishing machine in built motor with 0.5H.P. motor, 2800 rpm

    1 5,000.00 5,000.00

    4Spinning machine (medium duty) selffabricated with 1 H.P. motor

    2 12,000.00 24,000.00

    5 Wire bending machine, hand driven 2 4,000.00 8,000.00

    CALCULATION OF RECURRING EXPENDITURE / MONTH

    A. RAW MATEREIALS EXPENDITURE / MONTH :-

    Sl. Description QTY. RATE AMOUNTi Silver Ingot 35 Kg 50,000.00 1,750,000.00ii Cadmium 15 Kg 600.00 9,000.00

    iii Others (Zn, Cu) 7,600.00TOTAL : 1,766,600.00

    B. SALARY & WAGES :-

    Sl. POST No. RATE AMOUNT

    i Supervisor (self) 1 5,000(sustenance)

    5,000.00

    ii Skilled Worker 3 6,000 6,000.00iii Semiskilled Worker 3 3,000 3,000.00

    iv Un-Skilled worker 2 2,000 2,000.00TOTAL : 36,000.00

  • 7/31/2019 Silver Products MFG

    3/3

    MISCELLANEOUS EXPENDITURE

    12

    345678

    RentElectric Power

    i) Charcoal 50 Kg @ 10/-ii) Kerosene 150 Lt. @ 30/-

    PackagingTransport & ConveyanceRepairing & MaintenanceTax & InsuranceStationery Telephone Charges & OthersContingencies

    500.004,500.00

    3,000.00

    5,000.00

    3,000.005,000.001,000.001,000.00

    500.001,500.00

    TOTAL : 20,000.00

    TENTATIVE PROFIT & LOSS ACCOUNTS PER MONTH

    Towards Expenditure:- Towards Sales :-

    Description Amount SL. ITEM QTY.UNIT

    Rate Amount

    Recurring Expenses

    Depreciation of Plant &m/c, tools & equipment@10% per annum

    Depreciation of Furniture& Fixture @ 5% perannum

    Bank Interest paid@13% p.a. on TermLoan

    Bank Interest paid@13% p.a. on CashCredit

    1,822,600.00

    970.67

    337.50

    1,667

    1,893.83

    9,750.00

    1 Silver Products 50 Kg 37,500 1,875,000.00

    TOTAL 1,835,554.00Gross Profit Before Tax 39,446.00

    1,875,000.00 1,875,000.00

    Rate of Annual Return : 31.72%Profit to Sale Ratio : 2.10%

    B.E.P = Fixed Cost / ( Fixed Cost + Gross Profit )= 34,054.00 / 73,500.00= 46.33 %